ML20203J874
| ML20203J874 | |
| Person / Time | |
|---|---|
| Site: | Trojan File:Portland General Electric icon.png |
| Issue date: | 04/14/1986 |
| From: | Chaffee A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Withers B PORTLAND GENERAL ELECTRIC CO. |
| Shared Package | |
| ML20203J879 | List: |
| References | |
| NUDOCS 8604300271 | |
| Download: ML20203J874 (1) | |
See also: IR 05000344/1986005
Text
.
.
Docket No. 50-344
APR141995
Portland General Electric Company
121 S. W. Salmon Street
Portland, Oregon 97204
Attention:
Mr. Bart D. Withers
Vice President Nuclear
Gentlemen:
Subject: hTC Inspection of the Trojan Nuclear Plant
This refers to the routine inspection conducted by Mr. D. B. Pereira ot this
office on March 24 - 28, 1986, of activities authorized by NRC License
No. NPF-1 and to the discussion of our findings held by Mr. Pereira with
Mr. R. P. Schmitt and other members of your staff at the conclusion of the
inspection.
Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel and observations by the inspector.
No violations of NRC requirements were identified within the scope of this
inspection.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, we will be glad to
discuss them with you.
-
Sincerely,
Oi / [C[haffee, ChiefOU 16
(b
A. Y.
Reactor Projects Eranch
nclosure: Inspection Report No. 50-344/86-05
cc w/ enclosure:
W. S. Orr.er, PGE
J. W. Durham, Esq., PGE
W. Dixon, DOE
bcc -/ enclosures:
RSB/ Document Control Desk (RIDS)
Resident Inspector
Project Inspector
G. Cook, RV
B. Faulkenberry, RV
J. Martin, RV
RegionV([/
6A
DPereira: dot
RIrodds
AChaffee
04/1/86
04// /86
04/14/86
f
,
8604300271 860414
l
DR
ADOCK 0500
4
/