Package of Documents Listing OL Review Costs of Plants Issued OLs Since Mar 1979 Accident at TMI Site
ML20203J555
Person / Time
Issue date: 07/25/1986
From:
NRC
To:
Shared Package
ML20203J548 List:
References
FOIA-86-278 NUDOCS 8608050322
Download: ML20203J555 (57)


Text

T. -

( .ommonwealth Edison C:mpany (

- . Operating License Review Costs Through June 23, 1984

~ ~

FACILITY: Byron 1 DOCKET NO.: 50-454 Costs Per Professional Program Office Professional . Staff-hours Staff-hour Contractual Total Review Staff-hour Expended Costs Costs Costs

1. NRR $39 33,291.2 $1.298,357 $627,217 $1,925,574
2. IE-HQ 36 52.0 1,872 16,150 18,022
3. REGIONS 36 21,837.2 786,139 786,13:-
4. ACRS 50 353.9 17,695 17,695
5. NMSS 38 262.5 9,975 9,975 Total Cost: 52,757,405 gBO 2 860725 EVANS86-278 PDR l

l 1

Union Electric Company Operating License Review Costs Through October 18, 1984 (100% Power)

Standardized Design - Duplicate Unit FACILITY: Callaway 1 l

DOCKET NO. 50-483 l

Costs Per Professional Program Office Professional Staff-hours Staff-hour Contractual Total Review Sta f f-hour Expended Costs Costs Costs

1. NRR(before 6/23/84) 539 24,601.6 $959,462 $605,438 $1,564,900 NRR (6/23/84 & after) S62 827.5 51,305 - 51,305
2. IE-HQ 36 583.0 20,988 56,300 77,288
3. REGIONS 36 24,334.7 876,049 - 876,049
4. ACRS (before 6/23/84 50 486.1 24,305 - 24,305 ACRS(6/23/84 & after 62 2.0 124 -

124

5. NMSS 38 860.3 32,691 - 32,691 Total Cost: $2,626,66 1/ The total cost of $2,626,662 exceeds the maximum fee of 51,024,500 as stated in 10 CFR 170.21 A.2. , as revised March 23, 1978, for standardized design - duplicate unit review. In accordance with Footnote 3 of 10 CFR 170.21 no additional OL fee is due from the licensee.

F/g

DUKE POWER COMPANY 0FERATING LICENSE REVIEW COSTS THROUGH JUNE 23, 1984 FACILITY: CATAWBA 1

. DOCKET NO.: 50-413 Costs Per Professional Program Office Professional Review staff-hours Staff-hour i

_ Staff-hour iExpended Contractual Total Costs  !

__ Costs _

. Costs

l. putR

$39 38,400.2 $1,497,608 $482,377

$1,979,98b

2. IE-HQ 36 886.0 31,896 18,300 50,196
3. REG 10H3 36 18,839.7 678,229 -

678,229

4. ACRS 50 327.0 16,350 -

16,350

5. NMSS 38 676.5 25,707 -

25.707 Total Cost: 52,750,467 l

45velotutE /

F/3-

i o

- Duke Power Company Operating License Review Costs From 6/24/84 Through 1/17/85(100% Power)

FACILITY: Catawba 1 DOCKET NO.: 50-413 Costs Per Professional Program Office Professional Staff-Hours Staff-Hour Contractual Total Review Staff-Hour Expended Costs Costs Costs

1. NRR $62 4,186.1 $259,538 $111,730 $371,268 293.0 15,529 -- 15,529
2. IE-HQ 53 1,241.5 65,800 130 65,930
3. REGIONS 53 10.8 670 -- 670
4. ACRS 62 58 62.0 3,596 -- 3,596
5. NMSS TOTAL COST: $456,993 NRR Cost Adjustments From Previous Billing Period -3,120 Revised Cost Total $453,873 0 EWhen the costs of $453,873 are added to the costs of $2,750,467 from the previous billing period, the cumulative costs through January 17, 1985, the date of issuance of the 100% power license, are $3,204,340. This total exceeds by $126,940 the maximum fee of $3,077,400 as stated in 10 CFR 170.21. Accordingly,$126,940 has been subtracted from the costs of $453,873, leaving a balance due of $326,933.

t

~

DUKE POWER COMPANY OPERATING LICENSE REVIEW THROUGH JUNE 23, 1984 FACILITY: CATAWBA 2

~

DOCKET NO.: 50-414 Costs Per Professional Program Office Professional Staff-hours Review staff-hour Contractual Total Staff-hour Expended Costs Costs Costs I. ,

NRR $39 1,243.5 $48,497 $232,493 $280,990

2. IE-HQ 36 32.0 1,152 18,300 19,452
3. REGIONS 36 6311.2 227,203 -

227,203

4. ACRS 50 266.7 13,335 -

13,335

5. NMSS 38 271 . 0 10,298 -

10,298 Total Cost: $551,278

.l i

Exc L esv4E I

. , _ _ . . -__ - -.-- - - - - - - . . . . , - - - - . . - - - - - - - - - - - ~ - - - -

Duke Power Compar Jperating License Review C:sts t an 6/24/84 Through 12/22/84 FACILITY: Catawba 2 DOCKET NO.: 50-414 Costs Per Professional Program Office Professional Sta f f-hours Staff-hour Contractual Total Review 5taff-hour Expended Costs Costs Costs

1. NRR $62 - - $26,209 $26,209
2. IE-HQ 53 - - 1,700 1,700
3. REGIONS 53 470.0 24,910 - 24,910
4. ACRS 62 2.5 155 -

155

5. NMSS 58 - - - -

Total Cost: $52,974 i

FA

Operating Li, ese Review osts From 12/23/84 .l cough 6/22/85 FAtlLITY: CATAWBA 2

. DOCKET NO.: 50-414 Costs Per Professional Program Office Professional Review Sta ff-hours Staff-hour Contractual Total Staff-hour Expended Costs Costs Costs

1. NRR $62 319.0 $19,778 $5,180 $24,958
2. IE-HQ 53 33.0 1,749 8,500 10,249
3. REGIONS 53 1,853.5 98,236 --

98,236

4. ACRS 62 3.0 186 --

186

5. NMSS 58 194.5 11,281 --

11.281 Total Cost: $144,910 F/f

8twolob ww u L LL L e is6 b LW W M 3 OPERATI. LICENSE REVIEW COSTS THROUGH J. . 23, 1984 FACILITY: DIABLO CANYON 2 DOCKET NO.: 50-323 Costs Per Professional Prograr. Office Professional Sta ff-hours Staff-hour Review Contractual Total Staff-hour Expended Costs Costs Costs

1. NRR $39 11,712.3 $456,780 $883,537 $1.340,3'S
2. IE-HQ 36 None - 26,594 26,5M
3. REGIONS 36 7,105.0 255,780 - 255,7M
4. ACRS 50 320 16,000 - 16,03
5. NMSS 38 426.0 16,l88 1E ,163 Total Cost: ST,654,E7F 4

ENttesces /

f/~ f

Pacific Gas & Electric-Campa:v hw a g F

. (

Operating License Review Costs from 6/24/84 through 12/22/84 FAtlLITY: DIABLO CANYON 2 DOCKET NO.: 50-323 Costs Per Professional Prograr Office Professional Sta f f-hours Review Sta f f-hour Contractual Total

_ Staff-hour _ Expended _ Costs Costs Costs 1 NRR 562 1,647.5 $102,145 $95,906 $201,051

2. IE-HQ 53 12.0 636 3,000 3,E36
3. REGICM 53 1,720.5 91,202 75,70- 16f ,E 2
4. ACR5 62 --
5. NES 55 13.0 754 --

754 Total Cost: 5372,3c3 l

l l

i

( '

$1 .

l Pacific Gas & Electric Company Operating License Review Costs From 12/23/84 Through 6/22/85 FACILITY: Diablo Canyon 2 DOCKET NO.: 50-323 Costs Per Professional '

[

Program Office Professional Staff-Hours Staff-Hour Contractual Total Review Staff-Hour Expended Costs Costs Costs

1. NRR $62 2,737.5 $169,725 $352,034 $521,759
2. IE-HQ 53 41.0 2,173 3,900 6,073
3. REGIONS 53 2,212.5 117,263 --

117,263

4. ACRS 62 90.5 5,611 --

5,611

5. NMSS 58 -- -- -- --

)

TOTAL COST: $650,706 i

i i

O o

, Alabama Power Company Farley 2 License NPF-8 Docket 50-364 Custom Design Review Program Office Professional Cost of Professional Manpower Contractual Total Review Man-hours Expended Manpower /hr. Cost Support Costs NRR 13,432 1/ $ 39 $523,848 - $523,8'E IE 9,256.9 36 333,248 - 333,24E ACRS 96 1 50 4,800 - 4,8::

ASLBP Contested Case - - - -

ASLAP None - - - -

Total: $861,8965 1/ There were 2,288 hours0.00333 days <br />0.08 hours <br />4.761905e-4 weeks <br />1.09584e-4 months <br /> and $18,000 in contractual costs consumed for contested hearings.

These amounts were not included in the NRR staff effort.

2] The total cost of $861,896 exceeds the maximum fee of'5302,800 as stated in Section 170.21 A.1 of Part 170 for a concurrent review. In accordance with Footnote 3 of 170.21, no additional OL fee is due from the licensee.

4

THE DETROIT EDIS0N COMPANY OPERATING LICENSE REVIEW COSTS THROUGH JUNE 23, 1984 FACILITY: FERMI 2 DOCKET NO.: 50-341 Costs Per Professional Program Office Professional Staff-hours Staff-hour Review Contractual Total Staff-hour Expended Costs Costs _ Costs

1. NRR $39 47,232.7 $1,842,075 $981,761 $2,823,536
2. IE-HQ 36 861 30,996 27,000 57,d6 L
3. REGIONS 36 29,235.2 1,052,467 -

1,052,267

4. ACPS 50 373.3 18,665 -

18,6E5

5. NMSS 38 987.0 37,506 -

37,5:6 Total Cost: $3,990,17-if The cost of the OL review through June 23, 1984 exceeds the maximum fee of

$3,077,400 as stated in 10 CFR 170.21. In accordance with Footnote 2 of 170.21, $3,077,400 is the maximum amount that may be assessed for the OL review under 10 CFR 170 as revised June 20, 1984.

EAiaotvet /

DETROIT EDISON COMPANY OPERATING LICENSE REVIEW COSTS FROM 6/24/84 THROUGH 12/22/84 FACILITY: Fermi 2 ,

I DOCKET NO.: 50-341 '

Costs Per Professibnal Program Office Professional Staff-hours Staff-hour Contractual Total '

Review Staff-hour Expended Costs Costs Costs

1. NRR $62 3760.5 $233,151 $ 61,086 $294,237
2. IE-HQ 53 207.0 10,971 14,400 25,371
3. REGIONS 53 10,418.4 552,175 129,510 681,685
4. ACRS 62 3.8 236 . 236
5. NMSS 58 158.0 9,164 . 9,164 ,-

Total Cost: $1,010,693 F//3-

. _ . . . .-. - . . - -. .= - - - - . -

.#t

. < . (

o

[ Detroit Edison Company Operating License Review Costs From 12/23/84 Through 6/22/85 I

FACILITY: Fermi 2 DOCKET NO.: 50-341 i

+

Costs Per Professional Program Office Professional Staff-Hours Staff-Hour Contractual Total Review Staff-Hour Expended Costs Costs Costs 1 NRR $62 2,192.5 $135,935 $76,409 $212,344

2. IE-HQ 53 128.0 6,784 15,009 21,793
3. REGIONS 53 4,500.5 238,527 41,783 280,310 4 ACRS 62 3.0 186 --

186

5. NMSS 58 5.0 290 --

290 1

i TOTAL COST: $514,923 1

f i

l

I

[ ississippi Pow:;r & Light Compa Operating License Review Costs Throu9h 8/31/84

, FACILITY: GRAND GULF 1 DOCKET NO.: 50-416 Costs Per Professional Program Office Professional Staff-hours Review Staff-hour Contractual Total Staff-hour Expended Costs Cests Costs

1. NRR $39 52,027.2 $2,029,061 5351,728 52,380,789 NRR $62 2,039.0 126,418 --

126,418

2. IE-HQ 36 --
3. REGIONS 36 16,835.7 606.085 --

606,085

4. ACRS 50 608.5 30,425 ACRS 62 30,425 20.0 1,240 --

1,240

5. NMSS 38 299.25 11.37.1. --

11.37A NMS5 Sg g, . , y

,. >I e ' I'd 1 A Total ost: $3,156,329 Il 4 S,nu,557 ax4 c.,L4has >JrSS Cs$f[ .

F///

.. r f

Public Service Electric and Gas Company Operating License Reveiw Costs Through June 23, 1984 FACILITY: Hope Creek 1 DOCKET NO.: 50-354 Costs Per Professional Program Office Professional Staff-hours Staff-hour Contractual Total Review Staff-hour Expended _ Costs Costs Costs

1. NRR $39 17,279.2 $ 673,889 $ 156,658 $ 830,547
2. IE-HQ 36 ~436.0 15,696 21,300 36,996
3. REG 10iiS 36 11,488.5 413,586 -

413,586

4. ACRS 50 30.6 1,530 - 1,530
5. NMSS 38 156.0 5,928 5,928 Total Cost: $ 1,288,587

(') Public Service Electric & Ga(ompany

  • OperatingLicNYeReviewCostsFromJune 24, 1984 through December 22, 1984 FACILITY: HOPE CREEK 1 DOCKET NO.: 50-354 Costs Per Professional Prograrr Office Professional Staff-hours Staff-hour Contractual Total Review S ta f f-hour Expended Costs Costs Costs
1. NRR $62 7,022.0 $435,364 5167,554 $602,918
2. IE-HQ 53 200.0 10,600 -- 10,600
3. REGIONS 53 2,433.0 128,949 --

128,949 4 ACRS 62 357.8 22,184 -- 22,184 S. NK55 53 -- --

Total Cost: 5764,651 NRR Cost Adjustrnent -1,518 Total Revised Costs $763,133 e

I f//?

Pub'ic service Electric and Gas Comp 4y Operating License Revieri Costs From 12/23/84 Through 6/22/85 FACILITY: HOPE CREEK 1 DOCKET NO.: 50-354 1

Costs Per Professional -

Program Office Professionel Staff-hours Staff-hour Contractual Total Review Staff-hour Expended Costs Costs Costs

1. NRR $62 3,211.8 $199,132 5156,901 5356,033 l
2. IE-HQ 53 563.0 29,839 72,448 102,287
3. REGIONS 53 4,300.0 227,900 11,836 239,736
4. ACRS 62 194.0 12,028 --

12,028

5. NMSS 58 198.5 11,513 -- 11,513 Total Cost: 5721,597 t7/r

' nng Island Ligh2ing Company -.

Jamesport 1 & 2 (

Permit CPPR 175 & 176 Docket STri 50-516 6 517 CP Review - Utility Referencing Standardized Design - Replicate ,

(170.21 A 3.) .

Program Office Professional Cost of Professional Manpower Contractual Total Review Man-hours Expended Manpower /Hr Cost Support Costs Unit 1 NRR 13,,511 MH E $39/MH $ 526,929 $345,000 $ 871,929 IE 381.6 MH $36/MH 13,738 - 13,738 ACRS 197.5 MH $50/MH 9,875 - 9,875 ASLBP Contested Hearing - - - - '

ASLAP Contested Hearing .- - - -

Total Cost Expended $ 895,542 Fee Paid 6/14/74 125,000 1/4/79 811,600 Total Fees Paid $936,600 Refund Due Unit 1 $ 41,05d/

Unit 2 IE 311.2 MH $36/hr $ 11,203 -

$ 11,203 ACRS 197.5 MH $50/hr 9,875 - 9,875 ASLBP Contested Hearing - - -

ASLAP Contested Hearing - - -

Total Cost Expended $ 21,078 Fee Paid 1/4/79 164,200 Refund Due Unit 2 143,122 2/

2 Total Refund due Unit 1 & 2 $ 184.180 _/*

l E ncludes 300 professional man-hours which represents the f;RR manpower expended for the uncontested protion of the mandatory hearing which was contested. Total hearing time expended by NRR was 4,465 man-hours.

U Th e costs expended for Units 1 & 2 are less than the construction permit fees for the first replicate unit and a concurrent replicate unit as stated in 170.21 A.3 of the regulations.

In accordan o with Footnote 3 of 170.21 a refund is due the licensee.

__,_ _ - _ _. _ = _ _ _ - [ .

9

)>

Commonwealth Edison Company

. LaSalle 1 100% Power License December 3, 1982 Docket 50-373 License NPF-ll Professional Costs Per Prcgram Office Staff-hours Professional Staff-hour Contractual Total R: view Expended Staff-hour Costs Costs Costs NRR 42,990 $39 $1,676,610 $383,521 $2,060,131 IE 26,716.4 36 961,790 - 961,790 ACRS 306.7 50 15,335 - 15,335 NMSS 618.5 38 23,503 - 23,503 Total Cost: $3,060,759 1/

1/

The total cost of $3,060,759 exceeds the maximum fee of $1,024,500 as stated in Section 170.21 A.1 of Part 170. In accordance with Footnote 3 of 170.21, no additionhl OL fee is due from the licensee.

ff$8

3 r ,- .

k .

Commonwealth Edison Company La Salle 2 -

1007. Power License March 23, 1984 Docket No. 50-374, License NPF-18 i

Professional Costs Per Program Office Staff-hours Professional Staff-hour Contractual Total Review Expended Staff-hour Costs Costs Costs NRR 11.225.9 $39 $437,810 $119,594 $557,404 l

IE 11.541.5 36 415,494 2,645 418,139 l

ACRS 74.4 50 3,720 - 3,720 NMSS 72.0 38 2,736 - 2,736 Total Cost: $931,999 E

, i l

M The total cost of $981,999 exceeds the maximum fee of $302,800 as stated in Section 170.21 A.1 of Part 170 for a concurrent review. In accordance with Footnote 3 of 170.21, no additional OL fee is due from the licensee.

i F4/ l

V .-

, Philadelphia Electric Company Operating License Review Costs Through June 23, 1984 FACILITY: Limerick 1 DOCKET NO.: 50-352 Costs Per Professional Program Office Professional Staff-hours Staff-hour Contractual Total Review Staff-hour Expended Costs Costs Costs

1. NRR $39 49,692.6 $1,938,011 $1,553,514 $3,491,5~5
2. IE-HQ 36 617.5 22,230 4,751 26,c81
3. REGIONS 36 18,942 681,912 -

681,91 Z,

4. ACRS 50 442.9 22,145 -- 22,145
5. NMSS 38 895.5 34,029 --

34,019 Total Cost: 54,256,592 1/ The cost of the OL review through June 23,19S4 exceeds the maximum fee of 53,077,400 as stated in 10 CFR 170.21. In accordance with Footnote 2 of 170.21, 53,077,400 is the maximum amount that may be assessed for the OL review under 10 CFR 170 as revised June 20, 1984.

i I

1 l

Enclosure 1 IL

t i

Philadelphia Electric Company Operatin9 License Review Costs From 6/24/84 Through 12/22/84 FACILITY: LIMERICK 1 DOCKET NO.: 50-352 Costs Per Professional Program Office Professional Review Staff-Hours Staff-hour Contractual Sta ff-hour Expended Total Costs Costs Costs

1. NRR $62 4,899.6 $303,775 $91,355 $395,130
2. IE-HQ 53 832.0 44,096 23,900 67,996
3. REGIONS 53 6,175.5 327,302 32,599 359,901
4. ACRS 62 279.2 17,310 --

17,310

5. NMSS 58 164.0 9,512
  • 9,512

$849,849 flRR Cost Adjustment From Previous Period: -60,600 REVISED TOTAL COST: $789,249 Wu

, '. Duke Power Company .

McGuire 1 100% Power License 7/8/81 Custom Review-First Unit

- Docket 50-369, License NPF-9

> gram Office Professional Cost of Professional Manpower Contractual Total Review Man-hou-s Expended Manpower /hr. Cost Support Costs Fnit 1 IRR 32,397 ll 5 39 $1,263,433 $353,509 $1,616,991 IE 15,610.4 36 561,974 - 561,974 SCRS 270 50 13,500 - 13,500 SSLBP Contested Hearing -

ASLAP None -

1 Total Cost: $2,192,4T6 1/ We have not included 10,541 staff hours expended for contested hearings.

3/ The total. cost of $2,i92,466 exceeds the maximum fee of $1,024,500 as stated in Section 170.21,A.l. of Part 170. In accordance with Footnote 3 of 170.21, no additional OL fee is due from the licensee.

FM

?

Duke Power Company McGuire 2 100% Power License May 27, 1983 Docket No. 50-370, License NPF-17 Professional Costs Per Program Office Staff-hours Review Professional Staff-hour Contractual Expended Sta ff-hour Total Costs Costs Costs NRR 9,099 $39 $ 354,861 $143,792 $498,653 IE 8,888.7.

36 319,993 . 319,993 ACRS 325.6 50 16,280 -

16,280 NMSS -

38 -

Total Cost: $834,926 1/

"/

The total cost of $834,926 exceeds the maximum fee of $302,800 as stated in Section 170.21 A.1 of Part 170 for a concurrent review. In accordance with Footnote 3 of 170.21, no additional OL fee is due from the licensee.

e,-- .-

r Northeast Nuclear Energy Company Operating License Review Costs Through June 23, 1984 FACILITY: Millstone 3 DOCKET NO.: 50-423 Costs Per Professional Program Office Professional Staff-hours Staff-hour Contractual Total Review Staff-hour Expended Costs Costs Costs

1. NRR $39 23,574.6 $ 919,409 $ 653,273 $ 1,572,682
2. IE-HQ 36 341.0 12,276 21,166 33,442
3. REGION S 36 11,474.9 413,096 -

413,09E

4. ACRS 50 101.2 5,060 -

5,06:

5. NMSS 38 125.0 4,750 -

4,750 Total Cost: $ 2,029,030 l

l

< p 4-j... > ;p.g prGgw.+ . *N p f g st j g ] g ,h g q f;f,j;, q gffg j g ,yg,p g f g ig; Operating License Review Cost From 6/24/04 through 12/22/84 FACILITY: MILLSTONE 3 DOCKET NO.: 50-423 Costs Per Professional Prograrr Office Professional Sta f f-hours Staff-hour Contractual Total Review Staff-hour Expended Costs Costs Costs

1. NRR 562 4,729.0 $293,198 S178,227 5471,425
2. IE-HC 53 147.0 7,791 2,830 10,591
3. RE G: 0*d 53 2,105.0 111,565 --

111,565

. 4:R5 i: 545.3 33,539 -- 33,809
5. hw.55 5E 78.0 4,524 --

4.52 Total Cost: 5631,914 NRR Cost Adjustnen - E ,4 3:-

From Previous Billing Period Revised Cost Tctal 5E2E,514 l

f^ theast Nuclear Energy Company b Operating License Review Costs From 12/23/84 Through 6/22/85 FACILITY: MILLSTONE 3 DOCKET NO.: 50-423 Costs Per Professional -

Program Office Professional Staff-hours Staff-hour Contractual Total Review Staff-hour Expended Costs Costs Costs

1. NRR $62 6.947.4 $430,739 $130,524 $561,263
2. IE-HQ 53 2,417.0 128,101 177,930 306,031
3. REGIONS 53 -4 ,494.5 238,209 11,186 249,395
4. ACRS 62 10.0 620 --

620

5. NMSS 58 225.5 13,079 --

13,079 Total Cost: $1,130,388E E When the costs of $1,130,388 are added to the costs of $2,654,544 from the two previous billing periods, the cumulative costs through June 22, 1985 are $3,784,932. This total exceeds by $707,532 the maximum fee of $3,077,400 as currently stated in 10 CFR 170.21.

Accordingly, $707,532 has been subtracted from the costs of $1,130,388, leaving a total of $422,856 to be assessed. In accordance with Footnote 2 of 10 CFR 170.21 and since the licensee received an operating license (5% power) on November 25, 1985, only

$422,856 may be assessed fog the OL review through issuance of the 100% power license.

66 7

2 a -~

Enclosure 5 REVISED Virginia Electric & Power Company

~ North Anna 2 100% Power License Issued 10/17/80 Review Concurrent With Unit 1 Docket 50-339 License NPF-7 Program Office Professional Review Cost of Professional Manpower Contractual Total Man-Hours Expended Manpower /Hr. Cost Support Costs

Unit 2 iNRR 16,664E $39 $649,896 $176,322 $ 826,215

.IE 11.959.9 36 430,556 -

430,555

ACRS 905.2 50 45,260 -

45,263 lASLBP (Contested Hearing) -

ASLAP (ContestedHearing) -

TOTAL: $1,302,03d/

t

_lf Valeria Wilson, NRR, informed LFM on January 26, 1981 that the hearing, which was contested, included both  ;

Units 1 and 2. As a result, the NRR manpower expended for the hearing was recorded against the Unit 1 docket. j 2_/ The total cost of $1,302,034 exceeds the maximum fee of

$302,800 as stated in Section 170.21 A.1 of Part 170 for  ;

a concurrent unit review. In accordance with Footnote 3 '

of 170.21, no ' additional OL fee is due from the licensee.

{

- --- - ~ ~ ~

,- Arizona Public Service Company Operating scense Review Costs Through Jur. 23, 1984 FAtlLITY: Palo Verde 1 DOCKET ND.: STN 50-528 Costs Per Professional Program Office Professional Staff-hours Staff-hour Contractual Total Review Staff-hour Expended Costs Costs Costs

1. NRR $39 30,671.8 $1,196,200 $581,892 $1,77 E ,092.'
2. IE-HQ 36 588.0 21,168 21,167
3. REGIONS 36 13,910.8 716,789 716,787
4. ACRS 50 424.6 21,230 21,230
5. NMSS 38 342.5 13,015 13.015 Total Cost: 52,550,29t l

l l

  1. p

r Arizona Public Ser/':e Company Opera! 9 License Review Costs From 6/pff 84 Through 12/22/84 FACILITY: Palo Verde 1 DOCKET NO.: STN 50-528 Costs Per Professional Prograrr Office Professional Sta f f-hours Staff-hour Contractual Total Review Staff-hour Expended Costs Costs Costs

1. NRR 562 5,397.2 S334,626 554,109 S388,735
2. IE-HQ 53 304.0 16,112 4,734 20,846
3. REGIONS 53 7,924.5 419,999 44,200 464,199
4. ACRS 62 51.1 3,168 -

3,168

5. NMSS 58 46.5 2,697 -

2,697 Total Cost: 5879,645 1

1/ When the costs of 5879,645 are added to the costs of $2,550,294 for the previous billing 22,1984 are $3,429,939. This total exceeds period the cumulative costs through Decemberas currently stated in 10 CFR 170.21. Accord-by 5352,539 the maximum fee of 53,077,400 ingly, 5352,539 has been subtracted from the costs of 5879,645 leaving a total of 5527,106 to be assessed. In accordance with Footnote 2 of 10 CFR 170.21 and since the licensee received an operating license (Si power) on December 31, 1984, only $527,106 may be assessed for the OL review.

FN

( (

l Arizona Public Service Company l Operating License Review Costs From 12/23/84 Through 6/1/85 (100% Power) 1 FACILITY: Palo Verde 1 .

DOCKET NO.: 50-528 Costs Per Professional '

Program Office Professional Staff-Hours Staff-Hour Contractual Total Review Staff-Hour Expended Costs Costs Costs

1. NRR $62 1,657.4 5102,759 $17,555 $120,314
2. IE-HQ 53 33.0 1,749 -- 1,749
3. REGIONS 53 157.0 8,321 --

8,321  :

4. ACRS 62 138.1 8,562 --

8,562 1

5. NMSS 58 -- -- -- --

~

TOTAL COST: $138,946 F/32-

~, Arizona Public Service Company ~.

Operating :ense Review Costs Throu9h June )h 1984 FACILITY: Palo Verde 2 DOCKET NO.: STN 50-529 Costs Per Professional Program Office Professional Staff-heurs Staff-hour Contractual Total Review Staff-hour Expended Costs Costs Costs

1. NRR $39 1,122.8 $43,789 $260,703 5304,492
2. IE-HQ 36 7.0 252 252
3. REGIONS 36 3,333 119,98E 119,988
4. ACRS 50 45.6 2,280 2,280
5. NMSS 38 168.5 6,403 6,4C2 Total Cost: $433,415 e

i 1

b

^

l- Arizona Public Servi ~ Compa'ny Operating License Review Costs From 6/24/84 Through 12/22/84 FACILITY: Palo Verde 2 DOCKET NO.: STN 50-529 Costs Per Professional Prograrr Office Professional Staff-hours Staff-hour Contractual Total Review Staff-hour Expended Costs Costs Costs

1. NRR 562 - -

5 458 5 458

2. IE-HQ 53 4.0 5 212 4,733 4,945
3. REGIONS 53 786 41,655 - 41,65E
4. ACRS 62 24.1 1,494 - 1,494
5. NM55 58 42.0 2,436 - 2,436 Total Cost: $ 50,991 2

f ' trizona Public Service Company [~~.

Operating License Review Costs from 12/23/84 Through 6/22/85 FACILITY: PALO VERDE 2

~

DOCKET NO.: STN 50-529 Costs Per Professional '

Prcgram Office Professional Sta ff-hours Sta ff-hour Contractual Total Review Staff-hour Expended Costs Costs Costs

t. NRR $62 120.5 $ 7,471 --

S 7,471 IE-HQ 53 -- --

$5,499 5,499

. REGIDNS 53 2,503.0 132,659 --

132,659

. ACRS 62 --

. NM55 58 12.0 696 --

696 i

Total Cost: $146,325 '

I ff8f

4 i '

THE CLEVELAND ELECTRIC ILLUf41NATING COMPANY OPERATING LICENSE REVIEW COSTS THROUGH JUNE 23, 1984 FACILITY: PERRY l DOCKET NO.: 50-440 Costs Per Professional Program Office Professtonal .Sta ff-hours Staff-hour Contractual Total Review Staff-hour Expended Costs Costs Costs

1. NRR $39 29,951.5 $1,168,109 $426,659 $1,594,7E E s
2. IE HQ 36 711.0 25,596 -

25,59E

3. REGIONS 36 12,245.2 440,827 -

440,EI-

4. ACRS 50 330.7 16,535 b 16,535 c
5. NMSS 672.0 25,536

~

J 38 -

25,53f Total Cost:

$2,{03,2E2 Zweiosoet /

7d

,................................w..ro.2 -

Operating License Review Costs From 6/24/84 li. ough 12/22/84 FACILITY: Perry 1 DOCKET NO.: 50-440 Costs Per Professional '

Pr:grar Office Professional Sta f f-hours Review Staff-hour Contrac tual Total S ta f f-hour Expended Costs Costs Costs o n ,Igl .%. 6 kd)

1. NRR 562 1,563.5 596,937 5132,287 $229,224
2. IE-HQ 53 2,075.0 109,975 215,800 325,775
3. REGIONS 53 1,859.3 95,5:3 -- 9S,5 3 1 ACRS 62 3.2 198 --

198

5. N.ES 58 139.0 8,062 --

8,062 Total Cost: 5661,802 pan

+  : t t , / > > C, G fr

- AC) .

f"'

  • i 3, :. a ;

s44/f o

C')/f LLw f d

(

The< .ieveland Electric Illuminating tunpany Operating License Review Costs From 12/23/84 Through 6/22/85 FACILITY: Perry 1 DOCKET NO.: 50-440 Costs Per Professional Program Office Professional Staff-Hours Sta f f-hour Contractual Review Sta ff-hour _ Exoended Total Costs Costs _Cos ts

1. NRR $62 $4,268.4 $264,641 $194,010 $458,651
2. IE-HQ 53 971.0 51,463 76,030 127,493
3. REGIONS 53 5.188.2 274,975 41,836 316,811
4. ACRS 62 13.0 806 --

806

5. NMSS 58 221.0 12,818 --

12,818 TOTAL COST: $916,5791/

1/ Wh en the costs of $916,579 are added to the costs of $2,976,864 from the two previous billing periods, the cumulative costs through June 22, 1985 are $3,893,443.

This total exceeds by $816,043 the maximum fee of 3,077,400 as stated in 10 CFR 170.21. Accordi

$816.043 has been subtracted from the costs of $916,579, leaving a balance due of $100,536.

t F STATES UTILITIES COMPANY OPERATING LICENSE REVIEW GOSTS THROUGH JUNE 23, 1984 4

FACILITY: RIVER BEND l

DOCKET NO.: 50-458 l 1

Costs Per Professional Program Office Professional Staff-hours Staff-hour Contractual Total Review Staff-hour ' Expended Costs Costs Costs

1. NRR $39 23,970.3 $934,842 $468,754 $1.403,Eif.
2. IE-HQ 36 453.0 16,308 -

16,3:6

3. REGIONS 36 11,986.1 431,500 -

431,E::

4. ACRS 50 486.5 24,325 -

24,325

5. NMSS 38 310.5 11,799 -

11,795 Total Cost: $1,887,528 l

I l ApC4cfure.l

  1. 39

.'j g .ff '

Gulf States Utilities Company Operating License Review Costs From 6/24/84 Through 12/22/84 i

FACILITY: RIVER BEND 1

DOCKET NO.: 50-458 i

Costs Per Professional Program Office Professional Sta f f-Hours Staff-hour Review Staff-hour Expended Cont'ractual Total Costs Costs Costs

1. NRR $62 4,713.5 $292.237 $157,178 $449,415
2. IE-HQ 53 2,725.0 144,425 210,677 355,102-
3. REGIONS 53 3,637.0 192,761 14,881 207,642
4. ACRS 62 282.2 17,496 --

17,496

5. N'455 58 238.5 13,833 --

13,833 TOTAL COST: $1,043,488 NRR Cost Adjustment From Previous Period: -7,500 Revised Total Cost $1,035,988

^

(

Gulf States Utilities Company Operatin9 License Review Costs From 12/23/84 Through 6/22/85 FACILITY: River Bend 1 DOCKET NO.: 50-458 Costs Per Professional Program Office Professional Staff-Hours Staff-Hour Contractual Total Review Staff-Hour Expended Costs Costs Costs

1. NRR $62 6,906.8 5428,222 $286,723 $714,S45
2. IE-HQ 53 338.5 17,941 69,347 87,288
3. REGIONS 53 8,511.2 451,094 49,937 501,031
4. ACRS 62 -- -- -- --
5. NMSS 58 281.5 16,327 -- 16,327 TOTAL COST: $1,319,591 U When the costs of $1,319,591 are added to the costs of $2,923,516 from the previous billing periods, the cumulative costs through June 22,1985 are $4,243,107. This total exceeds by $1,165,707 the maximum fee of $3,077,400 as currently stated in 10 CFR 170.21. Accordingly, $1,165,707 has been subtracted from the costs of $1,319,591 leaving a total of $153,884 to be assessed. In accordance with Footnote 2 of 10 CFR 170.21 and since the licensee received an operating license (5% power) on August 29, 1985, only $153,884 may be assessed for the OL review.

3 Florida Power &. Light Company

' St. Lucie 2 100% Power License June 10, 1983 Dccket 50-389, License NPF-16 Professional Costs Per Program Office Staff-hours Professional Staff-hour Contractual Total Review Expended Staff-hour Costs Costs Costs NRR 33,563 $39 $1,308,957 $334,888 $1,643,845 IE 12,836.1 36 462,100 - 462,100 ACRS 369 50 18,450 - 18,450 NMSS 112.5 38 4,275 - 4,275 Total Cost: $2,128,670 1/

The total cost of $2,128,670 exceeds the maximum fee of $1,024,500 as stated in Section 170.21 A.1 of Part 170. In accordance with Footnote 3 of 170.21, no additional OL fee is due from the licensee.

YYA .

O o Public Service Electric & Gas Company I Salem 2 Full Power (100%) License Issued 5/20/81 Custom Design - Concurrent Review Docket 50-311 License DPR-75 Program Office Professional Cost of Professional Manpower Contractual Total Review Man-hours Expended Manpower /hr. Cost Support Costs Unit 1 NRR 19,793 E $ 39 $771,927 $39,299 $811,226 IE 15,453.8 36 556,337 - 556,337 ACRS 249.5 50 12,475 - 12,475 ASLBP Contested Case - -

ASLAP None -

Total Cost $1,380,038 2_C if We have not included 1,799 staff hours of effort expended in preparation of the contested hearing. No hearing was actually held because the Board dismissed the intervenor. See 9/4/81 memo from Berkow to Miller.

2_/ The total cost of $1,380,038 exceeds the maximum fee of $302,800 as stated in 170.21 A.1 of Part 170. In accordance with Footnote 3 of 170.21 no additional OL fee is due from the licensee.

F/ %

Southern California Edison Company San Onofre 2

. 100% Power License September 7,1982 Docket .50-361, License NPF-10 Program Office Professional Cost of Professional Manpower Contractual Total Review Man-hours Expended Manpower /hr. Cost Support Costs NRR 46,742 1 $39 $1,822,938 $574,125 $2,397,063 IE 13,381.6 36 481,738 - 481,738 ACRS 570 50 28,500 - 28,500 NMSS 261 .5 38 9,937 - 9,937 Total Cost: $2,917,238 2_/

L/ There were 4,659 hours0.00763 days <br />0.183 hours <br />0.00109 weeks <br />2.507495e-4 months <br /> consumed for contested hearings. This was not included in the NRR staff effort.

1/ The total cost of $2,917,238 exceeds the maximum fee of $1,024,500 as stated in Section 170.21 A.1 of Part 170. In accordance with Footnote 3 of 170.21, no additional OL fee is due from the licensee.

FM4

I,

, , ~*

Southern California Edison Company San Onofre 3 100% Power License September 16, 1983 Docket 50-362, License NPF-15 O

Professional Costs Per Program Office Staff-hours Professional Staff-hour Contractual Total Review Expended Staff-hour Costs Costs Costs NRR 3,606 $39 $140,634 $185,590 $326,224 IE 7,092 36 255,312 - 255,312 ACRS 294.3 50 14,715 - 14,715 NMSS -

38 - - -

Total Costs: $596,251 E

)

Y The total cost of $596,251 exceeds the maximum fee of $302,800 as stated in Section 170.21 A.1 of Part 170 for a concurrent review. In accordance with Footnote 3 of 170.21, no additional OL fee is due from the licensee.

l l

1 ff - - -

Enclosure 5 REVISED Tennessee Valley Authority Sequoyah 1 100% Power License Issued on 9/17/80 Custom Review First Unit Docket 50-327 License DPR-77 Program Office Profess. Man-Hours Cost of Profess. Manpower Contractual Total Review Expended Manpower /Hr. Cost Support Costs Unit 1 NRR 39,331 $39 $1,533,909 $345,112E $1,879,021 IE 16,227.5 36 584,190 - 584,190 ACRS 1,215.7 50 60,785 - 60,715 ASLBP (No Hearing Held) - - -

ASLAP None - - -

TOTAL: $2,523,99EE-If We have not included an estimated $100,000 to be spent by the Division of Systems Integration on the ice condenser problem before Sequoyah is granted an unconditional full power license. See January 22, 1981 memorandum from Berkow to Miller.

y The total cost of $2,523,996 exceeds the maximum fee of $1,024,500 as stated in section 170.21, A.l. of Part 170. In accordance with Footnote 3 of 170.21, no additional OL fee is due from the licensee.

F/44

tnciosure a

(

TennessenValleyAuthority[

S quoyah 2

. .. r Docket 50-328, License DPR-79 Full Power Issued September 15, 1931 Concurrent Review with Unit 1 170.21 A.l. Custom Design

/ .

Program Office m Professional Cost of Professional Manpower Contractual Total Review Man-hours Expended Manpower /hr. Cost Support Costs NRR 5,692 $ 39 $221,988 $94,298 $316,286 IE 10,222.5 36 368,010 -

368,010 NtiSS 25 38 950 -

950 ACRS ,

533.1 50 26,655 -

26,655 ASLBP No Hearing -

ASLAP None -

Total $711,901 l

1/ Th3 total cost of $711,901 exceeds the maximum fee of $302,800 as stated in Section 170.21 A l. of Part 170 for a concurrent review. In accordance with Footnote 3 of'170.21, no additional OL fee is due from the licensee.

F//7

r ,. .

\ s Long Island Lighting Company Operating Licensing Review Costs Through kne 23, 1984 FACILITY: SHOREHAM DOCKET N0.: 50-322 .

Costs Per Professional Program Office Pro fessional Sta f f-hours Sta ff-hour Contractual Total Review Sta f f-hour Expended Costs Costs Costs

1. NRR $39 52,696.4 $2,055,160 $966,512 $3,021,672
2. IE-HQ 36 1.583.0 56,988 20,552 77,540
3. REGIONS 36 28,353.0 1,020,708 -

1,020,708

4. ACRS 50 700.9 35,045 -

35,045

5. NMSS 38 457.5 17,385 - 17,385 Total Cost: $4,172,350 U 1/ The cost of the OL review through June 23, 1984 exceeds the maximum fee of

$3,077,400 as stated in 10 CFR 170.21. In accordance with Footnote 2 of 170.21 and since the licensee received an operating license (fuel load and cold criticality testing) on December 7,1984, only $3,077,400 may be assessed for the OL review through issuance of the 100% power license.

Enclosure 1

v .

f

t Long Island Lighting Company Operating License Review Costs From 6/24/84 Through 12/22/84 FACILITY: SHOREHAM DOCKET NO.: 50-322 Costs Per Professional Program Office Professional S taff-Hours Review Staff-hour Contractual Total Staff-hour Expended Costs Costs

  • Costs
1. NRR $62 2,528.8 $156,786 $293,600

/

$450,386

2. IE-HQ 53 624.0 33,072 3,400 36,472
3. REGIONS 53 2,502.0 132,606 66 132,672
4. ACRS 62 1.7 105 --

105

. 5. M4SS 58 143.0 8,294 --

8,294 r

l l

TOTAL COST: $627,929 l

l

s ('

l

, Long Island Lighting Company l Operating License Review Costs From 12/23/84 Through 6/22/85 '

FACILITY: Shoreham DOCKET NO.: 50-322 Costs Per Professional Program Office Professional Staff-Hours Staff-Hour Contractual Total Review Staff-Hour Expended Costs Costs Costs

1. NRR $62 883.5 $54,777 $211,865 $266,642
2. IE-HQ 53 665.0 35,245 --

35,245

3. REGIONS 53 -- --

12 12

4. ACRS 62 5.0 310 --

310

5. NMSS 58 11.0 638 --

638 TOTAL COST: $302,847 r/ro

-m-- 7-y*s-y-m w w-owr "g-+.--s- + -..-,-,-r- - - . - - - y- y ey p -p-~m-=- w--+eee - -n.-- -----+*---v - - - - - -

c.

South Carolina Electric & Gas Summer 1 100% Power License May 5, 1983 Docket 50-395, License NPF-12 Professional Costs Per Program Office Staff-hours Professional S taff-hour Contractual Total Review _ Expended Staff-hour Costs Costs Costs NRR 43,325 $39 $1,689,675 $55,493 $1,745,168 IE 21,133.5 36 760,806 -

760,806 ACRS 574.3 50 28,715 - 28,715 NMSS 766 38 29,108 - 29,108 Total Costs: $2,563,797

-1/

The total cost of $2,563,797 exceeds the maximum fee of $1,024,500 as stated in Section 170.21 A.1 of Part 170. In accordance with Footnote 3 of 170.21, no additional OL fee is due from the licensee.

F/r/

. 7 Pennsylvania Power & Light Company Susquehanna Unit 1 100% Power License November ll, 1982 Docket 50-387, License NPF-14 Program Office Professional Cost of Professional Manpower Contractual Total Review Man-hours Expended Manpower /hr. Cost Support Costs NRR 32,906 dl $39 $1,283,334 $1,075,870 $2,359,204 IE 18,999 35 683,964 _

683,964 ACRS 402.5 50 20,125 _

20,125 NMSS 181.5 38 6,897 _

6,897 1

TOTAL COST: $3,070,190 2_/

_1/

There were 4,256 hours0.00296 days <br />0.0711 hours <br />4.232804e-4 weeks <br />9.7408e-5 months <br /> consumed for contested hearings. This was not included in the NRR staff effort.

2/

The total cost of $3,070,190 exceeds the maximum fee of $1,024,500 as stated in Section 170.21 A.1 of Part 170. In accordance with Footnote 3 of 170.21, no additional OL fee is due from the licensee.

JUL 6 1983 f/F2

c' Pennsylvania Power & Light Cor ' ny Operating License Review Costs From 11/2/73 li..ough 6/27/84 (100% power)

~

FACILITY: Susquehanna 2 DOCKET NO.: 50-388 Costs Per Professional Program Office Professional Staff-hours Staff-hour Contractual Total Review Staff-hour Expended Costs Costs Costs

1. NRR $39 4,550.9 $177,485 $91,988 $269,473
2. IE-HQ 36 61.0 2,196 20,907 23,103
3. REGIONS 36 11,973.2 431,035 - 431,035
4. ACRS 50 208.7 10,435 - 10,435
5. NMSS 38 345.0 13,110 - 13,110 4

Total Cost: $747,156 1

1 F/rn-

Washington Public Power Supply _jstem Operating License Review Costs Through April 13, 1984 FACILITY: WNP-2 DOCKET NO.: 50-397 Costs Per Professional Program Office Professional Staff-hours Staff-hour Contractual Total Review Staff-hour Expended Costs Costs Costs

1. NRR $39 45,433.9 $1,771,922 $1,477,282 $3,249,204
2. IE-HQ 36 834.0 30,024 --

30,024

3. REGIONS 36 21,523.1 774,832 --

774,832

~

4. ACRS 50 683.8 34,190 --

34,19:

5. NMSS 38 464.5 17,651 --

17,651 Total Cost: $4,105,901

e

, Louisiana Power & Light Company Operating License Review Costs Through June 23, 1984

%M '

FACILITY: Waterford 3 DOCKET NO.: 50-382

~

Costs Per Professional Pr: gram Office Professional Staff-hours Staff-hour Contractual Total Review Staff-hour Expended Costs Costs Costs

1. NRR $39 40,140.2 $1,565,468 $1,377,548 $2,943,016
2. IE-HQ 36 580.0 20,880 41,551 62,43:

3 REGIONS 36 28,827.7 1,037,797 --

1,037,797

4. ACRS 50 921.7 46,085 --

46,085 5 38 785.0 29,830 -- 29,83:

9.NMSS 7 ,, '. a. ', , , y, , , c,

't ,% o p Total Cost: $4,119,15d/

1I The cost of the OL review through June 23, 1984 exceeds the maximum fee of

$3,077,400 as stated in 10 CFR 170.21. In accordance with Footnote 2 of 170.21 and since the licensee received a 5% power license on December 18, 1984, only $3,077,400 may be assessed for the OL review through issuance of

[

\

the 100% power license.

Enclosure 1 flff

  • i Louisiana Power & Light Company Operating, License Review Costs from 6/24/84 thraugh 12/22/84 FACILITY: Waterford 3 DOCKET NO.: 50-382 Costs Per Professional Program Office Professional Staff-hours Staff-hour Contractual Total Review Staff-hour Expended Costs Costs Costs
1. NRR 562 4,177.8 $ 259,024 $210,595 / $469,619
2. IE-HQ 53 1,063 56,339 -

56,339

3. REGI0 tis 53 3,786.9 200,706 -

200,706

4. ACRS 62 16.0 992 -

992

5. NMSS 58 - - - -

Total Cost: $ 727,656 e

v

)

- Kansas Gas & Electric Co. .any Operating License Revicw Costs Through June 23,1984 i

FACILITY: WOLF CREEK 1 i i

DOCKET NO.: 50-482 Costs Per Professional Program Office Professional Staff-hours staff-hour Contractual Total Review Staff-hour Expended Costs Costs Costs

1. NRR $39 19,715.4 $768,901 $583,958 $1,352,859
2. 36 657.0 23,652 18,797 42,449 IE-HQ
3. REG 10fi5 36 16,422.3 591,203 - 591 ,2:3
4. ACRS 50 964.8 48,240 - 4E,2*:

1,008.0 38,304 - 38,3%

5. NM55 38 Total Cost: $2,073,055 Mye w ers /

$ff

Kansas Gas & Electric Company Operating License Review Costs From 6/24/84 - 12/22/84 FACILITY: WOLF CREEK 1 DOCKET NO.: 50-482 Costs Per Professional Program Office Professional Sta f f-Hours Review Staff-hour Contractual Total Staff-hour Expended _ Costs Costs Costs

1. NRR $62 2,508.0 $155,496 574,063 5229,559
2. IE-HQ 53 1,862.0 98,686 51,400 150,086
3. REGIONS 53 10,157.0 538,321 40,551 578,872
4. ACRS 62 2.0 124 --

124

5. M4SS 58 254.0 14,732 --

14,732 TOTAL COST: 5973,373 l

F/rr

4 Kansas Gas & Electric Company Operating License Review Costs From 12/23/84 - 6/4/85 (100% Power)

FACILITY: Wolf Creek 1 DOCKET N0.: 50-482 Costs Per Professional Program Office Professional Staff-Hours Staff-Hour Contractual Total Review Staff-Hour Expended Costs Costs Costs

1. NRR $62 1,914.0 $118,668 $21,803 $140,471
2. IE-HQ 53 143.0 7,579 15,100 22,679
3. REGIONS 53 3,408.4 180,645 5,400 186,045 4 ACRS 62 3.0 186 -- 186
5. NMSS 58 16.0 928 --

928 TOTAL COST: $350,309 U EWhen the costs of $350,309 are added to the costs of $3,046,428 from the previous billing periods, the cumulative costs through June 4,1985, the date the full (100%)

power license was issued are $3,396,737. This total exceeds by $319,337 the maximun fee of $3,077,400 as stated in 10 CFR 170.21. Accordingly,$319,337 has been subtracted from the costs of $350,309 leaving a balance due of $30,972. In accordance with Footnote 2 of 10 CFR 170.21 and since the licensee received an operating license (5%

power) on March 11,1985, only $30,972 may be assessed for the OL review during this period.