ML20203J543

From kanterella
Jump to navigation Jump to search
Further Response to FOIA Request for Six Categories of Records Re Plants Issued OLs Since Accident at TMI in Mar 1979.Forwards Documents Listed on App F.App F & G Records Also Available in PDR
ML20203J543
Person / Time
Issue date: 07/25/1986
From: Grimsley D
NRC OFFICE OF ADMINISTRATION (ADM)
To: Evans L
INTERNATIONAL ENERGY ASSOCIATES, LTD.
Shared Package
ML20203J548 List:
References
FOIA-86-278 NUDOCS 8608050320
Download: ML20203J543 (7)


Text

s ,b .,\ UNITED STATES TD&ol6 -

E 1 NUCLEAR REGULATORY COMMISSION D p WASHINGTON, D. C. 20555

%*****/ JUL 2 51986 Ms. Lesley R. Evans Senior Consultant s International Energy Associates Limited '

2600 Virginia Avenue, NW IN RESPONSE REFER Washington, DC 20037 TO F0IA-86-278 s

Dear Ms. Evans:

This is in further response to your letter dated April 11, 1986, in which you requested, pursuant to the Freedom of Information Act (F0IA), six categories of records regarding plants that have been issued an operating license (0L) since the occurrence of the accident at the Three Mile Island (TMI) site in March 1979.

Because of the broao nature of category three of your request and because the staff was unsure about the correct interpretation of the scope of this category, Nina Toms, Jim Holloway, and Roger Mattson held a telephone conversation in your absence on June 17, 1986. On your behalf, Mr. Mattson agreed the following would be responsive to category three of your request:

The staff will provide records that contain data which represent, only the hours expended by the program offices that are subject to licensing fees; they do not represent total hours expended for each plant and are not available on a calendar or fiscal year basis.

Enclosed Appendix F is a list of those cases for which records subject to revised category three of your request are being provided. These records are being placed in the NRC's Public Document Room (PDR) in file folder F01A-86-278 under your name. Enclosed Appendix G is a listing of records subject to category four of your request, which the NRC has already made available for public inspection and copying at the PDR.

The staff has provided the following comments regarding category three. The records being provided to you represent the most current data available, which are categorized by the five offices referenced in your letter. For '

initial licenses issued prior to June 20, 1984, the effective date of the last revision to 10 CFR 170, the licensing fees are computed based on the costs expended from construction permit issuance to the issuance of the full power (100%) license with a maximum ceiling of $1,024,500. For initial licenses issued on or after June 20, 1984, licensing fees are based on the costs expended during a six-month cycle; i.e., June 23 through December 22 and December 23 through June 22 of each year up to the issuance of the full power license. The maximum licensing fee assessed for an OL issued on or after June 20, 1984, is $3,077,400. Further, cost data have not' teeen provided for Diablo Canyon 1 and Monticello. The Lice.ise Fee Management staff of the NRC does not yet have the finalized data for Diablo Canyon 1. With respect to Monticello, no professional staff hour data are available. The initic1.0L was issued prior to March 23, 1978. At that time, the OL fee assessed was a flat fee rather than one based on the professional staff hours expended to conduct the review.

8608050320 860725 PDR FOIA EVANS86-278 PDR

o Ms. Evans "

This response,' combined with our responses to you dated April 28, June 2, and June 27, 1986, completes NRC's action for categories one, two, three, four, and six of your request. As Ms. Toms informed Mr. Mattson during their conver-sation, the staff is continuing to search for records related to category five of your letter. We will notify you when this search is completed.

Sincerely, v1&-

Donnie H. Grimsley, Director

)

Division of Rules and Records Office of Administration

Enclosures:

As stated i

1

( ~'

l i

i i

s f

I

4. .

6 APPENDIX F F0IA-86-278 Item 3

1. Operating License Review Costs for Byron 1 (Docket No. 50-454) through 6/23/84
2. Operating License Review Costs for Callaway 1 (Docket flo. 50-483) through 10/18/84
3. Operating License Review Costs for Catawba 1 (Docket llo. 50-413) through 6/23/84
4. Operating License Review Costs for Catawba 1 (Docket lio. 50-413) from 6/24/84 through 1/17/85
5. Operaag License Review Costs for Catawba 2 (Docket llo. 50-414) through 6/23/84
6. Operating License Review Costs for Catawba 2 (Docket f!o. 50-414) from 6/24/84 through 12/22/84
7. Operating License Review Costs for Catawba 2 (Docket fio. 50-414) from 12/23/84 through 6/22/85 1
8. Operating License Review Costs for Diablo Canyon 2 (Docket No.

50-323) through 6/23/84

9. Operating License Review Costs for Diablo Canyon 2 (Docket flo.

50-323) from 6/24/84 through 12/22/84

10. Operating License Review Costs for Diablo Canyon 2 (Docket flo.

50-323) from 12/23/84 through 6/22/85

11. Operating License Review Costs for Farley 2 (Docket f!o. 50-364) through 3/31/81
12. Operating License Review Costs for Fermi 2 (Docket flo. 50-341) through 6/23/84
13. Operating License Review Costs for Fermi 2 (Docket fio. 50-341) from 6/24/84 through 12/22/84
14. Operating License Review Costs for Fermi 2 (Docket flo. 50-341) from 12/23/84 through 6/22/85
15. Operating License Review Costs for Grand Gulf 1 (Docket flo. 50-416) through 8/31/84
16. Operating License Nview Cnsts for Hope Creek 1 (Doctet flo. 50-354) throuch 6/23/84

8 2

17. Operating License Review Costs for Hope Creek 1 (Docket No. 50-354) from 6/24/84 through 12/22/84
18. Operating License Review Costs for Hope Creek 1 (Docket No. 50-354) from 12/23/84 through 6/22/85
19. Construction Permit Review Costs for Jamesport 1 and 2 (Docket Nos.

STN 50-516 and 50-517) through 1/4/79

20. Operating License Review Costs for La Salle 1 (Docket No. 50-373) through 12/3/82
21. Operating License Review Costs for La Salle 2 (Docket No. 50-374) through 3/23/84
22. Operating License Review Costs for Limerick 1 (Docket No. 50-352) through 6/23/84
23. Operating License Review Costs for Limerick 1 (Docket No. 50-352) from 6/24/84 through 12/22/84
24. Operating License Review Costs for McGuire 1 (Docket No. 50-369) through 7/8/81
25. Operating License Review Costs for McGuire 2 (Docket No. 50-370) through 5/27/83
26. Operating License Review Costs for Millstone 3 (Docket No. 50-423) through 6/23/84
27. Operating License Review Costs for Millstone 3 (Docket No. 50-423) from 6/24/84 through 12/22/84
28. Operating License Review Costs for Millstone 3 (Docket No. 50-423) from 12/23/84 through 6/22/85
29. Operating License Review Costs for North Anna 2 (Docket No. 50-339) through 10/17/80
30. Operating License Review Costs for Palo Verde 1 (Docket No. STN 50-528) through 6/23/84
31. Operating License Review Costs for Palo Verde 1 (Docket No. STN 50-528) from 6/24/84 through 12/22/84
32. Operating License Review Costs for Palo Verde 1 (Docket No. STN 50-528) from 12/23/84 through 6/1/85
33. Operating License Review Costs for Palo Verde 2 (Docket No. STN 50-529) through 6/23/84

e 3

34. Operating License Review Costs for Palo Verde 2 (Docket No. STil

~50-529) from 6/24/84 through 12/22/84

35. Operating License Review Costs for Palo Verde 2 (Docket No. STN 50-529) from 12/23/84 through 6/22/85
36. Operating License Review Costs for Perry 1 (Docket No. 50-440) 3 through 6/23/84
37. Operating License Review Costs for Perry 1 (Docket No. 50-440) from 6/24/84 through 12/22/84
38. Operating License Review Costs for Perry 1 (Docket No. 50-440) from 12/23/84 through 6/22/85.
39. Operating License Review Costs for River Bend 1 (Docket No. 50-458) through 6/23/84
40. Operating License Review Costs for River Bend 1 (Docket No. 50-458) from 6/24/84 through 12/22/84
41. Operating License Review Costs for River Bend 1 (Docket No. 50-458) from 12/23/84 through 6/22/85
42. Operating License Review Costs for St. Lucie 2 (Docket No. 50-389) through 6/10/83 l
43. Operating License Review Costs for Salem 2 (Docket No. 50-311) through 5/20/81
44. Operating License Review Costs for San Onofre 2 (Docket No. 50-361) through 9/7/82
45. Operating License Review Casts for San Onofre 3 (Docket No. 50-362) through 9/16/83
46. Operating License Review Costs for Sequoyah 1 (Docket No. 50-327) through 9/17/80
47. Operating License Review Costs for Sequoyah 2 (Docket No. 50-328) through 9/15/81
48. Operating License Review Costs for Shoreham (Docket No. 50-322) through 6/23/84
49. Operating License Review Costs for Shoreham (Docket No. 50-322) from 6/24/84 through 12/22/84
50. Operating License Review Costs for Shorehan (Docket No. 50-322) from 12/23/84 through 6/22/85

a 4

51. Operating License Review Costs for Summer 1 (Docket No. 50-395) through 5/5/83
52. Operating License Review Costs for Susquehanna 1 (Docket No.

50-387) through 11/11/82

53. Operating License Review Costs for Susquehanna 2 (Docket No.

50-388) through 6/27/84

54. Operating License Review Costs for WNP-2 (Docket No. 50-397) through 4/13/84
55. Operating License Review Costs for Waterford 3 (Docket No. 50-382) through 6/23/84
56. Operating License Review Costs for Waterford 3 (Docket No. 50-382) from 6/24/84 through 12/22/84 ,
57. Operating License Review Costs for Wolf Creek 1 (Docket No. 50-482) through 6/23/84
58. Operating License Review Costs for Wolf Creek 1 (Docket No. 50-482) from 6/24/84 through 12/22/84 ,
59. Operating License Review Costs for Wolf Creek 1 (Docket No. 50-482) from 12/23/84 through 6/4/85 t

e o

9 F01A-86-278 Appendix G Item 4

1. Catawba Nuclear Plant I and 2 LBP-84-24, 19 NRC 1418 Acc. No. 8407030223

. LBP-84-37, 20 NRC 933 Acc. No. 8409200123 LBP-84-52, 20 NRC 1484 Acc. No. 8411290384

2. Fermi-2 Nuclear Plant LBP-82-96, 16 NRC 1408 Acc. No. 8211030353
3. Perry Nuclear Plant LBP-85-35, 22 NRC 514 Acc. No. 8509050178 LBP-83-77, 18 NRC 1365 Acc. No. 8312050094
4. McGuire Nuclear Plant LBP-79-13, 9 NRC 489 (in Docket 369-370)

LBP-81-13, 13 NRC 652

5. Summer Nuclear Plant LBP-82-55, 16 NRC 2555 Acc. No. 8207210301 LBP-82-57, 16 NRC 477 Acc. No. 8208050472 l

i-c

- ~ - ~ ~ - -

INTERNAT ONAL '

ENERGY I ASSOCIATES LIMITED April 11, 1986 FREEDOM OF INFORMA110N Mr. Donnie Grimsley, Director A T REQUEST Division of Rules and Records Office of Administration 1 -[h -27 3 U. S. Nuclear Regulatory Commission Washington, D.C. 20555

/ f /_. ,

l 7 -

Dear Mr. Grimsley.

l Pursuant to the Freedom of Information Act (FOIA), I would like to request the following information:

1. The names of all plants that have received an operating license (OL) since the accident at Three-Mile Island (TMI) i in March 1979. '
2. For each of these post-TMI OLs, please provide: ,

(a) the Low Power OL issuance date (b) the Full Power OL issuance date. I

3. For each of these post-TMI OLs, please provide the number of NRC staff man-hours expended per calendar or fiscal '

year on license reviews from receipt of CP to receipt of .

Full Power OL (or to date if the Full Power OL is pending). Please provide these hours according to the following five program offices: (1) NRR, (2) IE-DO, (3)

Regions, (4) ACRS, and (5) NMSS.

4. For each of these post-TMI OLs, please provide the number l

of NRC hearing days expended per year, subdivided according to safety or environmental hearings.

5. t'or each of these post-TMI OLs, please identify whether or not they were subjected to any of the following appraisals j (if appropriate, how many of each of these appraisals): '

(a) Construction Appraisal Team (CAT)

(b) Integrated Design Inspection (IDI)

(c) Independent Design Verification Program (IDVP)

(d) Inspection by NRC's Nondestructive Examination Van (e) Other special design or construction verification program required or conducted by NRC l (f) INPO Construction Appraisal. j 2600 VIRGINIA AVENUE, N W ,

2 67W '

Telem 89-2600 CatWe IEAL WASHDC

  • IE AL se an ERC Int.matenal Company _ __ _. . _ _ . _ . . . _ _ _ _ . _ _ _ _ _ _

4 e

6. For each of these post-TMI OLs, please list the number, value, and date of all civil penalties issued by NRC for design, construction and startup (before full power) activities.

Thank you for your assistance. Please do not hesitate to call me if there any question regarding this request or if you think there may be more readily available information that would help me to characterize any of the six areas I have identified herein.

Si . e ,

f .

'l w

Les z R. Evans Senior Consultant 342-6751

/yy l

l l

l

!