Requests Addl Info Re 860514 Response to IE Bulletin 85-003, Including step-by-step Outline Verifying Switch Settings,Per Item E.Response Requested within 30 Days of Receipt of Ltr
ML20203H990
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 07/30/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Andrews R
OMAHA PUBLIC POWER DISTRICT
References
IEB-85-003, IEB-85-3, NUDOCS 8608050149
Download: ML20203H990 (2)


Text

t In Reply Refer To:

JUL 30 55 Docket: 50-285 Omaha Public Power District ATTN:

R. L. Andrews, Division Manager-Nuclear Production 1623 Harney Street Omaha, Nebraska 68102 Gentlemen:

Thank you for your letter of May 14, 1986, in response to IE Bulletin No. 85-03 dated November 15, 1985. As a result of our preliminary review, we find that additional information is needed. Specifically, Action Item e requests submittal of a program to accomplish Actions Items b through d.

While your letter states ~that Omaha Public Power Dit,trict intends to accomplish the Action Item, it does not outline a detailed step-by-step program to verify the switch settings.

Please provide the supplemental information within 30 days of the date of this letter..

f Sincerely,

/S/

J. E. Gagliardo, Chief

~ '

Reactor Projects Branch cc:

W. G. Gates, Manager Fort Calhoun Station-P.

0.- Box 399 Fort Calhoun, Nebraska 68023 Harry H. Voigt, Esq.

LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Aveaue, NW Washington, DC 20036 Kansas Radiation Control Program Director Nebraska Radiation-Control Program Director bcc:

(seenextpage)

RIV:RPB C:R C:RPB

/

RPMulli n/tw DRH er JEGap do

'\\ A6 /86 g/t /86 7/q hg N

$tSeogggggg8ggs G

r 1

~0maha Public Power District.

g bec to DM8 (IEll) bec distrib. by RIV:

  • RPB
  • Resident Inspector R. D. Martin, RA
  • R&SPB
  • Section Chief (RPB/B)

M. Murphy

  • RIV File DRSP
  • RSB i

1 L

l l

1 l'

l l

1 L