ML20203H705
| ML20203H705 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 07/30/1986 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Campbell G ARKANSAS POWER & LIGHT CO. |
| References | |
| IEB-85-003, IEB-85-3, NUDOCS 8608050067 | |
| Download: ML20203H705 (2) | |
Text
c
~
. o, NN In Reply Refer To:
Docke' : 50-313 50-368 Arkansas Power & Light Company
)
. ATTN: Mr. Gene Campbell Vice President, Nuclear.
Operations P. O. Box 551 Little Rock, Arkansas 72203 Gentlemen:
Thank you for your letter of May 14, 1986, in response to IE Bulletin No. 85-03 dated November 15, 1985. As a result of our preliminary review, we find that additional information is needed.
l Specifically, we request that you provide us with the following:
^
Your method to determine the differential pressure (DP) across the valves.
Your method to estimate switch settings, A; detailed step-by-step. program to verify the switch settings.
Included in this:is'how will the valves be verified operable if not tested at full operation.
Please provide the supplemental information within 30 days of the date of this letter.
Sincerely,
///
C608050067 860730 PDR ADOCK 05000313 PDR g
J. E. Gagliardo, Chief Reactor Projects Branch cc:
J. M. Levine, Director Site Nuclear Operations Arkansas Nuclear One P. O. Box 608 Russellville, Arkansas 72801 Arkansas Radiation Control Program Director bec:
(see,nextpage) f[
h RIV:RPf C:RPB,fB C:RPB RPMylli in/tw DRHun' r
JEGa 1 ip do A p /86 4AA/86 7/ f 61 r y lgl
2-Arkansas Power & l.ight Company 1
'bcctoDMB(IEll) bec distrib. by RIV:
- R&SPB
- Section Chief (RPB/B).
R. D. Martin, RA
- RPB
-
- Resident Inspector M. Murphy
- *RIV File DRSP
- RSB 1.
E 1
4