April 23, 1986 Docket No.: 50-213 Mr. J. F. Opeka, Senior Vice President Nuclear Engineering and Operations Connecticut Yankee Atomic Power Company Post Office Box 270 Hartford, Connecticut 06141-0270
Dear Mr. Opeka:
SUBJECT:
ENVIRONMENTAL ASSESSMENT AND FINDING 0F NO SIGNIFICANT IMPACT - TEMPORARY EXEMPTION FROM GENERAL DESIGN CRITERION 35 Re:
Haddam Neck Plant I am enclosing the subject notice which relates to your April 22, 1986 request for a temporary exemption from the NRC regulatory requirements regarding the consideration of single failures in emergency core cooling system evaluations as set forth in both the General Design Criterion No. 35 of 10 CFR 50, Appendix A, and the Interim Acceptance Criteria.
This notice is being forwarded to the Office of the Federal Register for publication.
Sincerely, Original signed by: C. I. Grimes Christopher I. Grimes, Director Integrated Safety Assessment Project Directorate Division of PWR Licensing - B
Enclosure:
DISTRIBUTION Notice giDocket+ File 48!
MBoyle ISAP Reading AWang(10) cc w/ enclosure:
NRC PDR ACRS See Next Page Local PDR FMiraglia CGrimes EJordan FAkstulewicz BGrimes PAnderson JPartlow OELD NSIC ISAP:DPL-B ISAP:DP -
ISAP:DPL 0 ELD
- by pho FAkstulewicz:lt PAnderso CGrimes J. Somo k
r 04/g/86 04@/86 04Q3/86 04/3/86-hoj42904oo860423m p
ADOCK 05000213 PDR,a
+
Og UNITED STATES g
NUCLEAR HEGULATORY COMMISSION 5
l WASHINGTON, D. C. 20555 k..... p#
April 23, 1986 Docket No.: 50-213 Mr. J. F. Opeka, Senior Vice President Nuclear Engineering and Operations Connecticut Yankee Atomic Power Company Post Office Box 270 Hartford, Connecticut 06141-0270
Dear Mr. Opeka:
SUBJECT:
ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT - TEMPORARY EXEMPTION FROM GENERAL DESIGN CRITERION 35 Re:
Haddam Neck Plant I am enclosing the subject notice which relates to your April 22, 1986 request for a temporary exemption from the NRC regulatory requirements regarding the consideration of single failures in emergency core cooling system evaluations as set forth in both the General Design Criterion No. 35 of 10 CFR 50, Appendix A, and the Interim Acceptance Criteria.
This notice is being forwarded to the Office of the Federal Register for publication.
Sincerely, WT%RAAA 1 -
Christopher I. Grimes, Director Integrated Safety Assessment Project Directorate Division of PWR Licensing - B
Enclosure:
Notice cc w/ enclosure:
See Next Page
Mr. John F. Opeka Connecticut Yankee Atomic Power Company Haddcm Neck Plant cc:
Gerald Garfield, Esquire Kevin McCarthy, Director Day, Berry & Howard Radiation Control Unit Counselors at Law Department of Environmental City Place Protection Hartford, Connecticut 06103-3499 State Office Building Hartford, Connecticut 06106 Superintendent Haddam Neck Plant Richard M. Kacich, Supervisor RDF #1 Operating Nuclear Plant Licensing Post Office Box 127E Northeast Utilities Service Company East Hampton, Connecticut 06424 Post Office Box 270 Hartford, Connecticut 06141-0270 Edward J. Mroczka Vice President, Nuclear Operations Northeast Utilities Service Company Post Office Box 270 Hartford, Connecticut 06141-0270 i
q Board of Selectmen Town Hall Haddam, Connecticut 03103 State of Connecticut Office of Policy and Management ATTN: Under Secretary Energy Division 80 Washington Street Hartford, Connecticut 06106 Resident Inspector Haddam Neck Nuclear Power Station c/o U.S. NRC East Haddam Post Office East Haddam, Connecticut 06423 r
Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 I
i
- -. -