Provides Guidelines for Emergency Exercise Objective/ Scenario Package for Exercise Scheduled on 861105.Package Should Be Submitted to Region IV & Bnwl for Review Prior to Exercise.Contact for Evalution of Exercise Requested
ML20203F916
Person / Time
Site: Crane Constellation icon.png
Issue date: 07/23/1986
From: Lazarus W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Hukill H
GENERAL PUBLIC UTILITIES CORP.
References
NUDOCS 8607310205
Download: ML20203F916 (4)


Text

1 a

5

\\

JUL 2 31986 Docket No: 50-289 GPU Nuclear Corporation ATTN: Mr. H. D. Hukill Vice President and Director of TMI-1 P. O. Box 480 Middletown, Pennsylvania 17057 Gentlemen:

In order for the Region to fully support the TMI emergency exercise scheduled for November 5, 1986, an adequate review of the exercise objectives and scenario is essential.

The guidelines identified below will be used for the submittal and review of the objectives and scenario packages prior to the exercise. You will note that the schedule is similar to the least restrictive submittal schedule noted in FEMA Guidance Memorandum No.17, Revision 1, for comparable milestones.

Region I has found that licensees generally comply with these guidelines, however, we recognize the need to stress the importance of both completeness and timeliness.

The following schedule should be used for all exercises:

Days in Advance Information to be Submitted 75 Days Description and scope of exercise, and the objectives to be fulfilled should be received in the Region I office.

The objectives should include specific objectives to demonstrate, where appropriate, the effectiveness of corrective actions taken in regard to problem areas which have been previously identified during NRC inspections, emergency exercises and drills and your internal evaluation process.

60 Days NRC will provide comments in writing, based on our review of your submittal.

45 Days Complete exercise scenario package with modified objectives, schedules, exercise rules, all controller, contingency and simulation informa-tion, all data, including plant data, radiation level and release rate data, and samples of the data to be presented should be received in the Region I office.

OFFICIAL RECORD COPY k

0607310205 860723

/

\\

[hb DR ADOCK 0500 9

~

s d

b q

Public Service Electric & Gas 2

s Company 30 Days NRC will provide comments in writing, based on our (and our contractor's) review of your submittal.

In order to protect the scenario from disclosure to participants, please send two copies to the Chief, Emergency Preparedness Section at the Letterhead address, marked, " EMERGENCY EXERCISE SCENARIO /0BJECTIVES."

In addition, please send two copies directly to Battelle Pacific Northwest Laboratory, Technical Leader, Emergency Preparedness Group, Health Physics Department, 2125 George Washington Way, Richland., WA 99352, in order to expedite the review process.

If you anticipate that the deadline will not be met, we recommend you use overnight mail.

The NRC emergency preparedness specialist responsible for evaluation of your exercise is Mr. Craig Gordon.

Please identify the name, address and phone number of the individual on your staff with whom we should interface.

Your continued cooperation in this matter is greatly appreciated.

If you have any concerns or questions, please contact Mr. Gordon at 215-337-5372.

Sincerely, Original Signed By:

William J. Lazarus, Chief Emergency Preparedness Section Division of Radiation Safety and Safeguards cc:

R. J. Toole, Operations and Maintenance Director, TMI-1 C. W. Smyth, Manager, TMI-1 Licensing R. J. McGoey, Manager, PWR Licensing Ernest L. Blake, Jr., Esquire TMI-1 Hearing Service List G. Simonetti, TMI EP Manager G. Giangi, EP Manager Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector Commonwealth of Pennsylvania OFFICIAL RECORD COPY J

1 s

i GPU Nuclear Corporation 3

bcc:

Region I Docket Room (with concurrences)

W. D. Travers, Director, THI-2 Cleanup Project Directorate J. Goldberg, OELD:HQ John Thoma, PM, NRR K. Abraham, PA0 Robert J. Bores, DRSS DRP Section Chief P. Gaul C. Gordon RI:

g RI:DRSS RI:DRSS Gaul Gordo Lazarus 7/g86 7/p/

7g/86 0FFICIAL RECORD COPY k

...s TMI-1 HEARING SERVICE LIST l

Sheldon J. Wolfe, Chairman Bruce W. Churchill, Esquire Administrative Judge Shaw, Pittman, Potts & Trowbridge Atomic Safety & Licensing Board Panel 1800 M Street, N.W.

U.S. Nuclear Regulatory Commission Washingto'n, D.C.

20036 Washington, D.C.

20555 Dr. Oscar H. Paris Atomic Safety & Licensing Board

~

Administrative Judge Panel Atomic Safety & Licensing Board Panel U.S. Nuclear Regulatory. Commission U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Washington, D.C.

20555 Frederick J. Shon Atomic Safety & Licensing Appeal Administrative Judge Board Panel Atomic Safety & Licensing Board Panel U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Washington, D.C.

20555 Joanne Doroshow Docketing & Service Section The Christic Institute Office of the Secretary 1324 North Capitol Street U.S. Nuclear Regulatory Commission hashington, D.C.

2002 Washington, D.C.

20555 Louise Bradford 1011 Green Street Harrisburg, PA 17102 i