ML20203F873
| ML20203F873 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 04/23/1986 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20203F877 | List: |
| References | |
| NUDOCS 8604280150 | |
| Download: ML20203F873 (2) | |
See also: IR 05000456/1986001
Text
- - - - - - -
- - - -
--
-
-_
Bms
-
-
e
APR 2 31oc8
Docket No. 50-456
Docket No. 50-457
Commonwealth Edison Company
ATTN: Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the NRC's Systematic Assessment of Licensee Performance (SALP 5)
Board Report for the Braidwood Station, our meeting of March 14, 1986, which
discussed in detail the contents of the report, and your written comments dated
April 11, 1986, relative to the report.
We have reviewed and evaluated your comments and find them acceptable. One
minor change to the SALP Board report is necessary and is identified on the
attached r.rrata sheet. Attached is an Appendix to the report which summarizes
the meeting and lists those in attendance.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter with the referenced
attachments, will be placed in the NRC's Public Document Room.
No reply to this letter is required; however, should you have questions on the
basis of conclusions reached by NRC, or if you need clarification on the
changes made to the SALP Report, please let us know and we will be pleased to
discuss them with you.
Sincerely,
O P I S I M 1 c i W ,! k .
Ar.rc 0.le <
James G. Keppler
'
Regional Administrator
Attachments:
1.
Appendix to SALP 5 Board
l
Report No. 50-456/86001;
I
No. 50-457/86001
2.
Errata Sheet
3.
Corrected Page to Report
-4.
Licensee's Response dated
g 4 ] O g e60
g56
April 11, 1986
o
See Attached Distribution
RIII
RyI ss
Peafn/kst ?r
$
RI}I
k
W
Ma
3
RIII
RII
n
aperYplio
Davisk!f
K
Yer
e ke
Littledf[
l
g
ch 1 nzg/
Gardner
N
s
Hind
f
,
,
k
lIG
l6@
e
-
..
APR 2 31988
Commonwealth Edison Company
2
L
'
Distribution
cc w/ attachments:
D. L. Farrar, Director
of Nuclear Licensing
M. Wallace, Project Manager
D. Shamblin, Construction
Superintendent
E. E. Fitzpatrick, Station
Superintendent
P. L. Barnes, Regulatory
Assurance Supervisor
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII-
Braidwood
Resident Inspector, RIII Byron
Phyllis Dunton, Attorney
General's Office, Environmental
Control Division
D. W. Cassel, Jr. , Esq.
J. W. McCaffrey, Chief, Public
Utilities Division
H. S. Taylor, Quality Assurance
Division
E. Chan, ELD
J. Moore, ELD
G. Berry, ELD
J. Stevens, NRR
The Honorable Herbert Grossman, ASLB
The Honorable A. Dixon Callihan, ASLB
The Honorable Richard F. Cole, ASLB
J. M. Taylor, Director, IE
H. R. Denton, Director, NRR
Regional Administrators
RI, RII, RIV, RV
N. J. Palladino, Chairman
J. K. Asselstine, Commissioner
F. M. Bernthal, Commissioner
T. M. Roberts, Commissioner
L. W. Zech, Commissioner
NRR Project Manager
H. L. Thompson, NRR
J. Axelrad, IE
RIII PRR
RIII SGA
State Liaison Officer, State
of Illinois
INP0
. _ _ - . . _ - - . _ - . _ . . . . . . _ ~ . _ _ - - , _ . . . _
-