Forwards App to SALP Board Repts 50-456/86-01 & 50-457/86-01 for Jul 1984 - Nov 1985 & Errata Sheet.Written Comments from 860411 Evaluated & Acceptable
ML20203F873
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 04/23/1986
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20203F877 List:
References
NUDOCS 8604280150
Download: ML20203F873 (2)


See also: IR 05000456/1986001

Text

- - - - - - -

- - - -

--

-

-_

Bms

-

-

e

APR 2 31oc8

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the NRC's Systematic Assessment of Licensee Performance (SALP 5)

Board Report for the Braidwood Station, our meeting of March 14, 1986, which

discussed in detail the contents of the report, and your written comments dated

April 11, 1986, relative to the report.

We have reviewed and evaluated your comments and find them acceptable. One

minor change to the SALP Board report is necessary and is identified on the

attached r.rrata sheet. Attached is an Appendix to the report which summarizes

the meeting and lists those in attendance.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter with the referenced

attachments, will be placed in the NRC's Public Document Room.

No reply to this letter is required; however, should you have questions on the

basis of conclusions reached by NRC, or if you need clarification on the

changes made to the SALP Report, please let us know and we will be pleased to

discuss them with you.

Sincerely,

O P I S I M 1 c i W ,! k .

Ar.rc 0.le <

James G. Keppler

'

Regional Administrator

Attachments:

1.

Appendix to SALP 5 Board

l

Report No. 50-456/86001;

I

No. 50-457/86001

2.

Errata Sheet

3.

Corrected Page to Report

-4.

Licensee's Response dated

g 4 ] O g e60

g56

April 11, 1986

o

PDR

See Attached Distribution

RIII

RyI ss

Peafn/kst ?r

$

RI}I

k

W

Ma

3

RIII

RII

n

aperYplio

Davisk!f

K

Yer

e ke

Littledf[

l

g

ch 1 nzg/

Gardner

N

s

Hind

f

,

,

k

lIG

l6@

e

-

..

APR 2 31988

Commonwealth Edison Company

2

L

'

Distribution

cc w/ attachments:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent

E. E. Fitzpatrick, Station

Superintendent

P. L. Barnes, Regulatory

Assurance Supervisor

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII-

Braidwood

Resident Inspector, RIII Byron

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr. , Esq.

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, ELD

J. Moore, ELD

G. Berry, ELD

J. Stevens, NRR

The Honorable Herbert Grossman, ASLB

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB

J. M. Taylor, Director, IE

H. R. Denton, Director, NRR

Regional Administrators

RI, RII, RIV, RV

N. J. Palladino, Chairman

J. K. Asselstine, Commissioner

F. M. Bernthal, Commissioner

T. M. Roberts, Commissioner

L. W. Zech, Commissioner

NRR Project Manager

H. L. Thompson, NRR

J. Axelrad, IE

RIII PRR

RIII SGA

State Liaison Officer, State

of Illinois

INP0

. _ _ - . . _ - - . _ - . _ . . . . . . _ ~ . _ _ - - , _ . . . _

-