Text
,
.
.
.
JUL 2 51986
Docket No. 50-456
Docket No. 50-457
Comonwealth Edison Company
ATTN: Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the special safety inspection conducted by Messrs. W. C. Liu
and J. A. Gavula of this office on July 1-3 and 8-9, 1986, of activities at
Sargent & Lundy Chicago Office and on July 10-11, 1986, of activities at
Braidwood Station, Units 1 and 2, authorized by NRC Construction Permits No.
CPPR-132 and No. CPPR-133, and to the discussion of our findings with
Mr. E. Fitzpatrick at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
&-
.
on, Chief
, 7 J. J. Harr
Engineerin Branch
Enclosure:
Inspection Reports
No. 50-456/86035 DRS ;
No. 50-457/86027 DRS
See Attached p,i_s,tr,ibu_t_ ion
Rlll
Rlli
Rlli
Rill
R
1
/t
b,10
bhyd
bfj}
b
()8
-
1
ison
MLiu/lc
avula
Danielson
Gardne/
/
7/Jf/86
N jJ
!/J6-
8607310169 060725
g
ADOCK0500g6
DR
r-______________
. - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ . ___ __________ ___ _
. _ _ .
_
_.
. _ _
O
.
Co[nmonwealth Edison Company
2
JUL 2 51986
cc w/ enclosure:
D.. L. Farrar, Director
of Nuclear Licensing
M. Wallace, Project Manager
D. Shamblin, Construction
Superintendent
E. E. Fitzpatrick, Station
Manager
P. L. Barnes, Regulatory
Assurance Supervisor
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Braidwood
Resident Inspector, RIII Byron
Phyllis Dunton, Attorney
General's Office, Environmental
Control Division
D. W. Cassel, Jr., Esq.
J. W. McCaffrey, Chief, Public
Utilities Division
H. S. Taylor, Quality Assurance
Division
E. Chan, ELD
l
.J. Moore, ELD
G. Berry, ELD
J. Stevens, NRR
The Honorable Herbert Grossman, ASLB
The Honorable A. Dixon Callihan, ASLB
The Honorable Richard F. Cole, ASLB
l
.
{
l
i
l
i