ML20203E333
| ML20203E333 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 07/17/1986 |
| From: | Starostecki R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Daltroff S PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20203E338 | List: |
| References | |
| NUDOCS 8607240130 | |
| Download: ML20203E333 (3) | |
See also: IR 05000277/1986005
Text
.
.
47 JUL 1986
Docket Nos. 50-277/DPR-44
50-278/DPR-56
Philadelphia Electric Company
ATTN: Mr. S. L. Daltroff
Vice President
Electric Production
2301 Market Street
Philadelphia, Pennsylvania 19101
Gentlemen:
Subject: Combined Inspection 50-277/86-05; 50-278/86-05
This transmits the findings of the special safety inspection associated with
the Unit 3 condensate storage tank (CST) spill on February 16, 1986 conducted
by Messrs. J. H. Williams, R. K. Struckmeyer, and T. P. Johnson on February 16
- April 4,1986, at the Peach Bottom Atomic Power Station, Delta, Pennsylvania.
These findings were based on the observation of activities, interviews,
measurements and document reviews, and have been discussed with Mr. D. C. Smith
and other members of your staff.
Areas examined during this inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter. Based on the results of
this inspection, it appears that several of your activities were not in full
compliance with NRC requirements as set forth in the Notice of Violation,
enclosed herein as Appendix A.
These violations have been categorized by
severity level in accordance with the " General Statement of Policy and
'
{
Procedure for N3C Enforcement Actions",10 CFR Part 2, Appendix C (1985). You
I
are required to respond to this letter and in preparing your response, you
l
should follow the instructions in Appendix A.
i
During this inspection it was determined that the information available to
t
!
operators regarding heat tracing for the condensate storage tank was not
!
adequate to properly assess the status of the heat trace system. We are
l
concerned that this condition apparently has existed since plant startup.
It
was also determined that a contractor dug holes in the Unit 3 CST dike in
February 1984 which effectively prevented the dike from performing its design
function to prevent the release of potentially radioactive liquids to the
(
environment. The holes remained in the dike until February 1986, which indicates
a problem regarding control and oversight of changes to the facility.
,
8607240130 860717
ADOCK 05000277
G
l
OFFICIAL RECORD COPY
CIR PB 86-05 - 0001.0.0
l
07/14/86
,O\\
.
ilif JllL 1986
Philadelphia Electric Company
2
The unavailability of up-to-date facility drawings of the site storm drain
system was a major contributor to your sampling of the incorrect storm drain
system discharge into the river during the February 16, 1986, CST overflow event.
We are concerned that other site drawings which are not controlled by adminis-
trative procedures may not be up-to-date.
In addition to your response to Appendix A, you are requested to address these
concerns.
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
A copy of this letter and its enclosures will be placed in the NRC Public
Document Room.
Your cooperation with us is appreciated.
Sincerely,
meimi==1 Signed By:
w-
Richard W. Starostecki, Director
Division of Reactor Projects
Enclosures:
1.
Appendix A, Notice of Violation
2.
NRC Region I Combined Inspection Report No. 50-277/86-05 and
50-278/86-05
cc w/encls:
R. S. Fleischmann, Manager, Peach Bottom Atomic Power Station
John S. Kemper, Vice President, Engineering and Research
W. H. Hirst, Director, Joint Generation Projects Department, Atlantic
Electric
G. Leitch, Superintendent, Nuclear Generation Division
Troy B. Conner, Jr. , Esquire (Without Report)
Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)
Raymond L. Hovis, Esquire (Without Report)
Thomas Magette, Power Plant Siting, Nuclear Evaluations (Without Report)
W. M. Alden, Engineer in Charge, Licensing Section
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
0FFICIAL RECORD COPY
CIR PB 86-05 - 0001.1.0
07/11/86
.
Philadelphia Electric Company
3
g7Jg g
-
bcc w/encis:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encis)
R. Gallo, Section Chief, DRP
i
,
bcc w/encls:
'
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encis)
R. Gallo, Section Chief, DRP
R
R
P
RI:DRSS/d R .
P
RI:
fBellamy
Wi
ib
Johd
Gallo
C
Std
tecki
7/
86
7/@/86
7/ /86
7//o /86
7/\\ /86
7)
/86
!
l
OFFICIAL RECORD COPY
CIR PB 86-05 - 0002.0.0
j
07/10/86
i
. , - . , - . . _