ML20203E333

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-277/86-05 & 50-278/86-05 on 860216-0404 & Notice of Violation.Response to Failure to Properly Assess Status of Heat Trace Sys & Unavailability of up-to-date Site Storm Drain Drawings Requested
ML20203E333
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 07/17/1986
From: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20203E338 List:
References
NUDOCS 8607240130
Download: ML20203E333 (3)


See also: IR 05000277/1986005

Text

.

.

47 JUL 1986

Docket Nos. 50-277/DPR-44

50-278/DPR-56

Philadelphia Electric Company

ATTN: Mr. S. L. Daltroff

Vice President

Electric Production

2301 Market Street

Philadelphia, Pennsylvania 19101

Gentlemen:

Subject: Combined Inspection 50-277/86-05; 50-278/86-05

This transmits the findings of the special safety inspection associated with

the Unit 3 condensate storage tank (CST) spill on February 16, 1986 conducted

by Messrs. J. H. Williams, R. K. Struckmeyer, and T. P. Johnson on February 16

- April 4,1986, at the Peach Bottom Atomic Power Station, Delta, Pennsylvania.

These findings were based on the observation of activities, interviews,

measurements and document reviews, and have been discussed with Mr. D. C. Smith

and other members of your staff.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Based on the results of

this inspection, it appears that several of your activities were not in full

compliance with NRC requirements as set forth in the Notice of Violation,

enclosed herein as Appendix A. These violations have been categorized by

'

severity level in accordance with the " General Statement of Policy and

{ Procedure for N3C Enforcement Actions",10 CFR Part 2, Appendix C (1985). You

I

are required to respond to this letter and in preparing your response, you

l should follow the instructions in Appendix A.

i

t

During this inspection it was determined that the information available to

! operators regarding heat tracing for the condensate storage tank was not

! adequate to properly assess the status of the heat trace system. We are

l concerned that this condition apparently has existed since plant startup. It

was also determined that a contractor dug holes in the Unit 3 CST dike in

February 1984 which effectively prevented the dike from performing its design

function to prevent the release of potentially radioactive liquids to the

environment. The holes remained in the dike until February 1986, which indicates

(

a problem regarding control and oversight of changes to the facility.

,

8607240130 860717

PDR ADOCK 05000277

G PDR

l

OFFICIAL RECORD COPY CIR PB 86-05 - 0001.0.0

l 07/14/86

,O\

.

Philadelphia Electric Company 2 ilif JllL 1986

The unavailability of up-to-date facility drawings of the site storm drain

system was a major contributor to your sampling of the incorrect storm drain

system discharge into the river during the February 16, 1986, CST overflow event.

We are concerned that other site drawings which are not controlled by adminis-

trative procedures may not be up-to-date.

In addition to your response to Appendix A, you are requested to address these

concerns.

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

A copy of this letter and its enclosures will be placed in the NRC Public

Document Room.

Your cooperation with us is appreciated.

Sincerely,

meimi==1 Signed By:

w-

Richard W. Starostecki, Director

Division of Reactor Projects

Enclosures:

1. Appendix A, Notice of Violation

2. NRC Region I Combined Inspection Report No. 50-277/86-05 and

50-278/86-05

cc w/encls:

R. S. Fleischmann, Manager, Peach Bottom Atomic Power Station

John S. Kemper, Vice President, Engineering and Research

W. H. Hirst, Director, Joint Generation Projects Department, Atlantic

Electric

G. Leitch, Superintendent, Nuclear Generation Division

Troy B. Conner, Jr. , Esquire (Without Report)

Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)

Raymond L. Hovis, Esquire (Without Report)

Thomas Magette, Power Plant Siting, Nuclear Evaluations (Without Report)

W. M. Alden, Engineer in Charge, Licensing Section

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

0FFICIAL RECORD COPY CIR PB 86-05 - 0001.1.0

07/11/86

.

-

Philadelphia Electric Company 3

g7Jg g

bcc w/encis:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encis)

R. Gallo, Section Chief, DRP

i

,

'

bcc w/encls:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encis)

R. Gallo, Section Chief, DRP

R R P RI:DRSS/d R . P RI:

Wi ib Johd Gallo fBellamy C Std tecki

7/ 86 7/@/86 7/ /86 7//o /86 7/\ /86 7) /86

!

l OFFICIAL RECORD COPY CIR PB 86-05 - 0002.0.0

j 07/10/86

i

. , - . , - . . _