1 AVERAGE DAILY UNIT POWER LEVEL DOCKET N0. 50-423 UNIT Millstone Unit No. 3 DATE 2/10/86 COMPLETED BY A. Elms TELEPHONE (203) 444-5388 I

MONTH January 4

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

17 0

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

23 0

i o

8 0

24 0

9 0

25 0

l 10 0

26 0

11 0

27 0

t 12 0

28 0

13 0

29 0

14 0

30 0

15 0

31 0

16 0

l

,e(

i 8604240103 860131

/

f l

PDR ADOCK 05000423 PDR I il

\\

OPERATING DATA REPORT DOCKET NO. 50-423 DATE 2/10/86 COMPLETED BY A. Elms TELEPHONE (203) 444-5388 j.

OPERATING STATUS 1.

Unit Name: Millstone Unit 3 NOTES 2.

Reporting Period: January 1986 j

3.

Licensed Thermal Power (MWt): 3411 l

4.

Nameplate Rating (Gross MWe): 1208 5.

Design Electrical Rating (Net MWe): 1153 j

6.

Maximum Dependable Capacity (Gross MWe): 0 7.

Maximum Dependable Capacity (Net MWe): 0 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: Full Power License Obtained l

]

9.

Power Level To Which Restricted, If Any (Net MWe): N/A i

10.

Reasons For Restrictions, If Any: Initial Startup i

I j

This Month Yr To Date Cumulative

]

11.

Hours In Reporting Period N/A N/A N/A 12.

Number of Hours Reactor Was Critical N/A N/A N/A 13.

Reactor Reserve Shutdown Hour N/A N/A N/A 14.

Hours Generator On Line N/A N/A N/A j

15.

Unit Reserve Shutdown Hours N/A N/A N/A 16.

Gross Thermal Energy Generated (MWH)

N/A N/A N/A 17.

Gross Electrical Energy Generated (MWH)

N/A N/A N/A i

18.

Net Electrical Energy Generated (MWH)

N/A N/A N/A j

19.

Unit Service Factor N/A N/A N/A i

20.

Unit Availability Factor N/A N/A N/A 21.

Unit Capacity Factor (Using MDC Net)

N/A N/A N/A i

j 22.

Unit Capacity Factor (Using DER Net)

N/A N/A N/A j

23.

Unit Forced Outage Rate N/A N/A N/A l

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

(See Attached)

I 25.

If Shut Down at End of Report Period, Estimated Date of Startup:

l 26.

Units in Test Status (Prior to Commercial Operation): Forecast Achieved Initial Criticality 1/23/86 1/23/86

]

Initial Electricity 2/12/86 l

Commercial Operation 5/1/86 i

1 Operating Data Report Attachment 3

24. Scheduled Shutdowns During Startup Testing l

February 19, 1986 Reactor Trip from 30% power during Ascension Testing' - 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> i

l duration.

i February 26, 1986 Reactor Trip from 50% power during power Ascension Testing - 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> duration.

i March 7, 1986 Reactor Trip from 20% power during power Ascension Testing - 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> duration.

March 22, 1986

)

Reactor Trip from 100% power during power Ascension Testing - 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> duration.

UNIT SHUTDOWNS AND POER REDUCTIONS DOCKET N0. 50-423 UNIT Millstone Unit No. -3 DATE 1/10/86 COMPLETED BY A. Elms TELEPHONE (203) 444-5388 i

REPORT MONTH January Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to No.

Date Type (1)

(Hours)

Reason (2)

Down Reactor (3) Report #

Code Code Pr cent Recurrence N/A N/A S

N/A H

N/A N/A N/A N/A Initial Plant Startup 1

2 3

4 F: Forced Reason:

Method:

Exhibit G - Instructions S: Scheduled A - Equipment Failure (Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Sheets for C - Refueling 3 - Automatic Scram Licensed Event Report D - Regulatory Restriction 4 - Continued from (LER) File (NUREG-0161)

E - Operator Training & License previous month Examination 5'- Power Reduction 5 F - Administrative (Duration = 0)

Exhibit 1 - Same Source G - Operational Error (Explain) 9 - Other (Explain)

H - Other (Explain)

I I*

NORTHEAST tmLmES 1

l

{s[J[ijji}i[5C.

h,$h""E""

t <L ::===:

February 11) 1986 MP-8703 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Reference:

Facility Operating License No. NPF-49 Docket No. 50-423

Dear Sir:

This letter is forwarded to provide the report of operating and shutdown experience relating to Millstone Unit 3 Monthly Operating Report 86-2 in accordance with Technical Specifications, Section 6.9.1.5.

One additional copy of the report is enclosed.

Yours truly, NORTHEAST NUCLEAR ENERGY COMPANY FOR: Wayne D. Romberg Station Superintendent Millstone Nuclear Power Station D

BY:

ignature James J. Kelley Station Services Superintendent Millstone Nuclear Power Station WDR/DM:se Attachment Regional Administrator, Office of Inspection and Enforcement, Region I cc:

Director, Office of Inspection and Enforcement, Washington, D.C. (10)

U. S. Nuclear Regulatory Commission, c/o Document Management Branch, Washington, D. C. 20555 I "4 9

1' n!