1 AVERAGE DAILY UNIT POWER LEVEL DOCKET N0. 50-423 UNIT Millstone Unit No. 3 DATE 2/10/86 COMPLETED BY A. Elms TELEPHONE (203) 444-5388 I
MONTH January 4
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
i o
8 0
24 0
9 0
25 0
l 10 0
26 0
11 0
27 0
t 12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 0
16 0
l
,e(
i 8604240103 860131
/
f l
\\
OPERATING DATA REPORT DOCKET NO. 50-423 DATE 2/10/86 COMPLETED BY A. Elms TELEPHONE (203) 444-5388 j.
OPERATING STATUS 1.
Unit Name: Millstone Unit 3 NOTES 2.
Reporting Period: January 1986 j
3.
Licensed Thermal Power (MWt): 3411 l
4.
Nameplate Rating (Gross MWe): 1208 5.
Design Electrical Rating (Net MWe): 1153 j
6.
Maximum Dependable Capacity (Gross MWe): 0 7.
Maximum Dependable Capacity (Net MWe): 0 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: Full Power License Obtained l
]
9.
Power Level To Which Restricted, If Any (Net MWe): N/A i
10.
Reasons For Restrictions, If Any: Initial Startup i
I j
This Month Yr To Date Cumulative
]
11.
Hours In Reporting Period N/A N/A N/A 12.
Number of Hours Reactor Was Critical N/A N/A N/A 13.
Reactor Reserve Shutdown Hour N/A N/A N/A 14.
Hours Generator On Line N/A N/A N/A j
15.
Unit Reserve Shutdown Hours N/A N/A N/A 16.
Gross Thermal Energy Generated (MWH)
N/A N/A N/A 17.
Gross Electrical Energy Generated (MWH)
N/A N/A N/A i
18.
Net Electrical Energy Generated (MWH)
N/A N/A N/A j
19.
Unit Service Factor N/A N/A N/A i
20.
Unit Availability Factor N/A N/A N/A 21.
Unit Capacity Factor (Using MDC Net)
N/A N/A N/A i
j 22.
Unit Capacity Factor (Using DER Net)
N/A N/A N/A j
23.
Unit Forced Outage Rate N/A N/A N/A l
24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
(See Attached)
I 25.
If Shut Down at End of Report Period, Estimated Date of Startup:
l 26.
Units in Test Status (Prior to Commercial Operation): Forecast Achieved Initial Criticality 1/23/86 1/23/86
]
Initial Electricity 2/12/86 l
Commercial Operation 5/1/86 i
1 Operating Data Report Attachment 3
- 24. Scheduled Shutdowns During Startup Testing l
February 19, 1986 Reactor Trip from 30% power during Ascension Testing' - 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> i
l duration.
i February 26, 1986 Reactor Trip from 50% power during power Ascension Testing - 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> duration.
i March 7, 1986 Reactor Trip from 20% power during power Ascension Testing - 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> duration.
March 22, 1986
)
Reactor Trip from 100% power during power Ascension Testing - 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> duration.
UNIT SHUTDOWNS AND POER REDUCTIONS DOCKET N0. 50-423 UNIT Millstone Unit No. -3 DATE 1/10/86 COMPLETED BY A. Elms TELEPHONE (203) 444-5388 i
REPORT MONTH January Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to No.
Date Type (1)
(Hours)
Reason (2)
Down Reactor (3) Report #
Code Code Pr cent Recurrence N/A N/A S
N/A H
N/A N/A N/A N/A Initial Plant Startup 1
2 3
4 F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A - Equipment Failure (Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Sheets for C - Refueling 3 - Automatic Scram Licensed Event Report D - Regulatory Restriction 4 - Continued from (LER) File (NUREG-0161)
E - Operator Training & License previous month Examination 5'- Power Reduction 5 F - Administrative (Duration = 0)
Exhibit 1 - Same Source G - Operational Error (Explain) 9 - Other (Explain)
H - Other (Explain)
I I*
NORTHEAST tmLmES 1
l
{s[J[ijji}i[5C.
h,$h""E""
t <L ::===:
February 11) 1986 MP-8703 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Reference:
Facility Operating License No. NPF-49 Docket No. 50-423
Dear Sir:
This letter is forwarded to provide the report of operating and shutdown experience relating to Millstone Unit 3 Monthly Operating Report 86-2 in accordance with Technical Specifications, Section 6.9.1.5.
One additional copy of the report is enclosed.
Yours truly, NORTHEAST NUCLEAR ENERGY COMPANY FOR: Wayne D. Romberg Station Superintendent Millstone Nuclear Power Station D
BY:
ignature James J. Kelley Station Services Superintendent Millstone Nuclear Power Station WDR/DM:se Attachment Regional Administrator, Office of Inspection and Enforcement, Region I cc:
Director, Office of Inspection and Enforcement, Washington, D.C. (10)
U. S. Nuclear Regulatory Commission, c/o Document Management Branch, Washington, D. C. 20555 I "4 9
1' n!