ML20203E099
| ML20203E099 | |
| Person / Time | |
|---|---|
| Site: | 07000036 |
| Issue date: | 02/12/1998 |
| From: | Ting P NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | Kaiser B ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY |
| Shared Package | |
| ML20203E103 | List: |
| References | |
| 70-0036-98-201, 70-36-98-201, NUDOCS 9802260262 | |
| Download: ML20203E099 (3) | |
Text
,pw ts,q g'
t UNITED STATES y
y
}
NUCLEAR REGULATORY COMMISSION 2
WAf HINGToN, D.C. 202H001 8
%,..... p February 12,19h ABB Combustion Engineering Nuclear Fuel Combustion Engineering, Inc.
ATTN: Dr. B.J. Kaiser, Vice President Fuel Operations Hematite Nuclear Fuel Manufacturing P.O. Box 107 3300 State Road P Hematite, MO 63047
SUBJECT:
INSPECTION REPORT 70-0036/98 201 AND NOTICE OF VIOLATION
Dear Dr. Kaiser:
l This refers to the Nuclear Criticality Safety (NCS) inspection by members of the Headquarters i
staff conducted on January 12 - 16,1998, at your facility in Hematite, MO. The purpose of this inspection was to determine whether activities authorized by your license were conducted safely and in accordance with NRC requirements. At the conclusion of the inspection, the findings were discussed with those members of your staff identified in the report.
Areas examined in the inspection are identified in the enclosed report. Within these areas, the inspection consisted of selective examination of relevant records, interviews with plant personnel, and observation of activities in progrt ts. Within the scope of this inspection, one cited and two non-cited violations were identified, as well as two unresolved items. Seven of nine previously opened inspector followup items were closed, and one was recategorized as a violation.
You are required to respond to the enclosed Notice of Violation and should follow the instructions specified in the enclosed Notice when preparing your response, in your response, you should document the specific actions taken and any additional actions you plan to prevent recurrence. After reviewing your response to this Notice, including your proposed correctivo actions and the results of future inspections, the NRC will determine whether further NRC enforcement action is necessary to ensure compliance with NRC regulatory requirements.
)I 1RU7 n pr, ~
9002260262 900212 PDR ADOCK 07000036 C
2 February 12, 1998 in accordance with the NRC's ' Rules of Practice,' a copy of this letter and its enclosures will be placed in the NRC Public Document Room. Should you have any questions concerning this inspection, we would be please to discuss them with you.
Sincerely,
')
{'
\\)
Philip Ting, Chief Operations Branch Division of Fuel Cycle Safety and Safeguards, NMSS l
Docket No. 70-0036 l
License No. SNM 33
Enclosure:
- 2. Inspection Report 98-201 cc w/ enclosures:
R.W. Sharkey, Manager, Regulatory Affairs ABB Combustion Engineering R. A. Kucera, Director Missouri Derartment of Natural Resources i
Ollt E, R ttsutr ~
Cf / 3 -)
, February 12, 1998 in accordance with the NRC's " Rules of Practice," a copy of this letter and its enclosures will be placed in the NRC Public Document Room. Should you have any questions concerning this i
inspection, we would be please to discuss hm with you.
Sincerely, (Original /s/ by)
Philip Ting, Chief Operations Branch 4
Division of Fuel Cycle Safety and Safeguards, NMSS Docket No. 70-0036 Licensa No. SNM 33 Enclosura:
- 2. Inspection Report 98 201 cc w/ enclosures:
Mr. R.W. Sharkey, Manager, Regulatory Affairs ABB Combustion Engineering R. A. Kucera. Director. Mo. Dept. of Natural Resources DISTRIBUTIOS:
Docket File 70-0036 NMSS r/f MRoders, PMDA (w/o encls.)
SSoong, FCLB PDR, LPDR (w/o encls.)
Case File FCSS r/f MMessler (w/o encls.)
MWeber, FCLB FCOB r/f WTroskoski, FCOB JDavis, FCOB a:\\Morey\\98 201.wpd FCOB b
I FCOB FCOB FCOB FCOB b
PHarich IN CTripp @'
DMorey Ib WSchk (k
2h 2/5/98 2A/98 2///98 th8 C = COVER E = COVER & ENCLOSURE N = NO COPY OFFICIAL RECORD COPY