i TROJAN NUCLEAR PLANT

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO: 50-344 LATE: 2-7-86 COMPLETED BY: F. J. Ulmer TELEPHONE: 503-556-3713

OPERATIONS

The plant entered January at full power and maintained full power throughout the month, except for about 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> at 85% for testing.

The 'C' steam generator primary-to-secondary tube leakage increased from approximately 130 gallons / day to 200 gallons / day while reactor coolant system activity remained constant at approximately 18% of the Dose Equivalent Iodine Limit. Condensate oxygen was reduced to about 4 ppb in each train when an air leak was found in the 'N' main feed pump rupture disk.

MAJOR SAFETY RELATED MAINTENANCE:

1. 'A' Train ESF outage occurred for monthly preventive maintenance and various scheduled work items.
2. 'B' Train ESF outage occurred for monthly preventive maintenance.
3. Reactor Coolant Post Accident Sampling System was worked.
4. Service Water Pump 'C' impeller was replaced and pump inspected.

MISCELLANEOUS MAINTENANCE:

1. Spent fuel pool bridge crane maintenance, and wheel replacement.

j 2. Overhauled 'A' spent fuel pool cooling pump.

1 l

3. Repaired 'N' main feed pump seal water line.
4. Incore/Excore nuclear instruments calibration.
5. Auxiliary Building drain tank drain line inlet line unclogged.
6. NaOH additive tank level indication system repair.

! Installed temporary domineralizers in steam generator blowdown system.

8. Installed a bypass line around stator cooling water filters.

LICENSE CHANGES:

No changes were issued this month.

1 MISCELLANEOUS:

NRC onsite review of control room ventilation surveillance procedure.

8604240070 60131 U PDR R

ADOCK 05000344 .Ab~=cn

^ CN PDR Qq\

O OPERATING DATA REPORT DOCKET NO. 50-344 DATE 2-7-86 COMPLETED BY F- .T - filmer TELEPHONE 503-ss6-3713 Ext. 495 OPERATING STATUS Notes

1. Unit Name: Troian Nm i nne Plant January 1986 Maximum dependable capacity

. 2. Reporting Period:

3411 factor changed to 1050Mwc

3. Licensed Thermal Power (MWt): net based on summer of
4. Nameplate Rating (Gross MWe): 1216 1130 1985 data and feedwater
5. Design Electrical Rating (Net MWe): f1 w element fouling.

00

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

1050

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

n/a

9. Power Level To Which Restricted. If Any (Net MWe): n/a n L,
10. Reasons For Restrictions. If Any: -

This Month Yr. to Dste Cumulative

!!. Hours in Reporting Period 7aa 744' 82560

12. Number Of Hours Reactor Was Critical 744 744 50294 0 0 3887
13. Reactor Reserve Shutdown Hours
14. Hours Generator On Line 744 744 49798
15. Unit Reserve Shutdown Hours 0 0 3249
16. Gross Thermal Energy Generated (MWH) 2533984 2533984 157488789
17. Gross Electrical Energy Generated (MWH) 814290 _,

814290 51632606

18. Net Electrical Energy Generated (MWH) 776707 776707 48868011
19. Unit Service Factor 100 100 60.3
20. Unit Availability Factor 100 100 64.3
21. Unit Capacity Factor (Using MDC Net) 99.4 99.4 54.8
22. Unit Capacity Factor iUsing DER Net) 92.4 92.4 52.4 23.' Unit Forced Outage Rate 0.0 0.0 15.5
24. Shutdowns Scheduled Over Next 6 MonthsiType. Date,and Duration of Each):

Cycle 8/9 Refueling Outage is scheduled for April 24, 1986

25. If Shut Down At End Of Report Period. Estimated Date of Startup: n/a
26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY n/a n/a INITIAL ELECTRICITY n/a n/a COMMERCIAL OPERATION n/a n/a (9/77)

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-344 UNIT: TROJAN DATE: 2-7-86 COMP:.ETED BY:_P. J. Ulmer TELEPHONE: 503-556-3713 Ext. 495 MONTH January 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1na6 17 1040 2 1045 ,. 18 1037 3 987 19 1046 4 1043 20 1046 5 1044 1045 21 6 1044 1046

- - . 22 7 1045 1046

_ . . 23 8 1043 1046 24 9

1043 1049 25 10 1043 26 1051 11 1043 27 1050 12 1044 28 1051 13 1051 29 1051 14 1051 30 1049 15 1050 31 1043 16 1045 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

t UNITSIIUIDOWNS AND POWER REDUC 110NS DOCKET NO. 50-344 UNIT NAME ' Pen t, n DATE 2 7196 January 1986 COMPLE1ED HY P 1_ ril mn v.

REPORT MONill TELErilONE 503-556-1711

' Ext. 495 e.

= re '3 25 '*"'"

E

% Daic 2 5_I E g

75U gge Event g7

  • o.

pg Cause & C nrective gt,go, ,,

[ E .E 6= m g p, g Report a mu yO . Prevent Recurrence 6

NONE I 2 3 4 F: Forced Reason: Method: Exhibit G Instructions 5: Scheduled A Equipment Falture(Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3 Automatic Se:am. Event Reporn (LER) Fife tNUREG.

D Regulatory Restriction 4-Other (Explain) 0161)

E Operatur Training & Ucense Examination F-Administrative 5

, G. Operational Errug (Explain) Exhibit i . Same Simrec

, t'J/77) Il-Otim (Ewplains) 4 s

e k

/.

E Portland General Electric Company Trojan Nuclear Plant P.O. Box 439 Rainier, Oregon 97048 (503) 556-3713 February 7, 1986 WSO-046-87 Office of Resource Management US Nuclear Regulatory Commission j Washington, DC 20555 j i

Gentlemen:

In accordance with the Trojan Nuclear Plant Technical Specifications reporting requirements, the monthly  ;

operating data report is submitted for January, 1986.

Sincerely, W. S. Orser General Manager Attachments l

l l

fh i I

l i