VERMONT YANK E NUCLEAR POWER STATION-I MONTHLY STATISTICAL REPORT 86-01 4
j FOR THE MONTH OF JANUARY, 1986
.i 1
J I
4 4
i i
l 8604240074 860131 I'
PDR ADOCK 05000271 R
PDR (4v
OPERATING DAYA REPORT Docket No.
50-271 Date 869230 Completed by G.A. Wallin Telephone (802) 257-7711 OPERATING STATUS Notes:
1.
Unit Name:
Vermont Yankee 2.
Reporting Period:
January 3.
Licensed Thermal Power (MWt):
1593 4.
Nameplate Rating (Gross MWe):
540 5.
Design Electrical Rating (Net MWe):514(oc) 504(cc) 6.
Maximum Dependable Capacity (Gross MWe):
535 7.
Maximum Dependable Capacity (Net MWe):
504 8.
If changes occur in capacity ratings (Items Number 3 through 7) since last report, give reasons:
N/A 9.
Power level to which restricted, if any (Net MWe):
N/A
- 10. Reasons for restrictions, if any:
N/A This month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 744.00 744.00
- 12. Number of Hours Reactor was Critical 0.00 0.00 93111.06
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 0.00 0.00 90718.35
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Thermal Energy Generated (MWH) 0.00 0.00 132109630.50
- 17. Gross Electrical Energy Generated (MWH) 0.00
_0.00
_43955902.00
- 18. Net Electrical Energy Generated (MWH) 0.00 0.00 41700250.00
- 19. Unit Service Factor 0.00 0.00 77.44
- 20. Unit Availability Factor 0.00 0.00 77.44
- 21. Unit Capacity Factor (using MDC Net) 0.00 0.00 70.63
- 22. Unit Capacity Factor (using DER Net) 0.00 0.00 69.25
- 23. Unit Forced Outage Rate 0.00 0.00 6.92
- 24. Shutdowns scheduled over next 6 months (Type, Date and Duration of Each):
Refuelina outage began September 21, 1985 for 40 weeks.
- 25. If shut down at end of report period, estimated date of startup:
June 26, 1986
- 26. Units in Test Status (prior to commercial operation): N/A Forecast Achieved Initial Criticality Initial Electricity Commercial Operation
AVERAGE DAILY UNIT POWER LEVEL 0
1 Docket No.
50-271 Unit Vermont Yankee Date 860210 Completed by G.A. Wallin Telephone (802) 257-7711 MONTH January DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0-25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 0
16 0
INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
Docket No.
50-271 Unit Varmont Yankee UNIT SHUTDOWNS AND POWER REDUCTIONS Date 860210
~.
Completed by G. A. Wallin REPORT MONTH January Telephone (802) 257-7711 1
2 3
4 5
No.
Date Type Duration Reason Method of License System Component Cause and Corrective Action to (hours)
Shutting Down Event Code Code Prevent Recurrence Reactor Report #
85-14 860101 S
744 C
1 N/A N/A N/A 1985 Refueling / Maintenance /Recire (cont)
Pipe Replacement Outage in progress.
l 4
1 2
3 4
F-Forced A-Equipment Failure (Explain)
Method:
Exhibit G - Instructions S-Scheduled B-Maintenance or Test 1-Manual for Preparation of Data Entry C-Refueling 2-Manual Scram Sheets for Licensee Event D-Regulatory Restriction 3-Automatic Scram Report (LER) File (NUREG 0161)
E-Operator Training and License Examination 4-Other (Explain)
F-Administrative 5
G-Operational Error (Explain)
Exhibit I - Same Source H-Other (Explain)
~.
l l
Docket No.
50-271 Unit Varmont Yankee Date 860210 Completed by G.A. Wallin SAFETY-RELATED MAINTENANCE Telephone (802) 257-7711 l
EQUIPMENT NATURE OF LER OR OUTAGE MALFUNCTION CORRECTIVE ACTION MAINTENANCE NUMBER CAUSE RESULT NONE l
l l
l l
l
Dockat No.
50-271 Unit Varmont Yankst Date 860210 Completed by G.A. Wallin Telephone (802) 257-7711 REPORT MONTH January
SUMMARY
OF OPERATING EXPERIENCES Highlights Vermont Yankee operated at 0% of rated thermal power for the month.
Gross electrical generation was O
MWH, or 0% of design electrical capacity.
Operatina Summary The following is a chronological description of plant operations including other pertinent items of interest for the month:
Throughout the reporting period, the plant was shutdown for the 1985 Refueling / Maintenance /Recirc Pipe Replacement Outage.
L
2.-
VERMONT YANKEE NUCLEAR POWER CORPORATION P. O. BOX 157 GOVERNOR IIUNT ROAD VERNON, VERMONT 05354 VYV 86-026 February 10, 1986 l
U. S. Nuclear Regulatory Commission Director, Office of Management Information and Program Control Washington, D. C.
20555 Dear Sir Submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station for the month of January,1986.
i Very truly yours, VERM)NT YANKEE NUCLEAR POWER CORP.
A*s*---fM" Warren P. Murphy Vice President and Manager of Operations WPM /GAW/gmy:MSRl.lA4SR 4