ML20203D755
| ML20203D755 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 04/18/1986 |
| From: | Paperiello C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20203D758 | List: |
| References | |
| NUDOCS 8604220323 | |
| Download: ML20203D755 (2) | |
See also: IR 05000254/1986006
Text
_
.
.-
APR 18 085
Docket No. 50-254
<
Docket No. 50-265
Commonwealth Edison Company
ATTN: Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago,'IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Mr. S. G. DuPont
and Ms. P. R. Rescheske of this office on March 19 through 26, 1986, of
activities at Quad Cities Nuclear Power Station authorized by NRC Operating
Licenses No. DPR-29 and No. DPR-30 and to the discussion of our findings with
Mr. T. Tamlim and others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
As stated-in the report the last two consecutive as-found Type A tests at Quad
Cities, Unit l'have been failures and, pursuant to 10 CFR 50, Appendix J,
Section III.A.6.(b), a Type A test shall be performed during each plant
shutdown for refueling until two consecutive as-found Type A tests meet the
acceptance criteria of Appendix J.
Accordingly, unless you request, and are
granted, an exemption from this requirement by the Office of Nuclear Reactor
Regulation, we expect you to conduct a Type A test during each refueling cutage
until two consecutive as-found Type A tests satisfy the Appendix J acceptance
criteria. Additionally, we request that you provide a response to this office
addressing your program for correcting the repetitive local leak rate failures.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
8604220323 e60418
ADOCK 05000254
G
,
hhl
I
-
-
-.
--
-
-
-
-
r-,
.
.
Commonwealth Edison Company
2
ppg i g 1993
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
'
"
g #,y
Carl J. iPape fello, Director
Division of eactor Safety
Enclosure:
Inspection Reports
No.
50-254/86006(DRS);
No.
50-265/86006(DRS)
cc w/ enclosure:
D. L. Farrar, Director
of Nuclear Licensing
N. Kalivianakis, Plant Manager
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Phyllis Dunton, Attorney
l
General's Office, Environmental
'
Control Division
!
l
l
MS
Ws
RIII
RIII
RIII
RIII
RIII
RIII7
J
@,.
.nS
5~
Y
01'
Pape)ello
uPont
Res heske
Rin
Boyd
yeh,1
gfYh
04/16/86
/(,/gr%,~
q
6
$
6lj )p y&
6
L \\
l
. - - -
- - - -
-