ML20203D506

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-416/97-21 on 971019-1129 & Notice of Violation Re Failure to Perform Engineering Evaluation Prior to Securing or Installing Items in Close Proximity to safety-related Equipment
ML20203D506
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 12/05/1997
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Hagan J
ENTERGY OPERATIONS, INC.
Shared Package
ML20203D508 List:
References
50-416-97-21, NUDOCS 9712160216
Download: ML20203D506 (5)


See also: IR 05000416/1997021

Text

. _ .- - - . - ~.

'

s a

l

'#WW. UNITE 3 STATES

/ , g NUCLEAR REGULATORY COMMISSION

t a REGsON iv

  • 4, *

611 RYAN PLAZA drive. SulTE 400

4, + AM LING ton, TEXAS 76048064

vecember 5, 1997 *

I

Joseph J. Hagan, Vice President

Operations Grand Gulf Nuclear Station

Entergy Operations, Inc.

P.O. Box 756

Port Gibson, Mississippi 39150

SUBJECT: NRC INSPECTION REPORT 50-416/97 21 AND NOTICE OF VIOLATION

Dear Mr. Hagan:

An NRC inspection was conducted October 19 through November 29,1997, at your Grand

Gulf Nuclear Station reactor facility. The enclosed report presents the scope and results of

that inspection.

During the 6 week period covered by this inspection period, your conduct of activities at

the Grand Gulf facility was generally characterized by safety-conscious operations, sound

engineering and maintenance practices, and careful radiological work controls. However,

the inspection identified one violation consisting of two examples involving the failure to

perform an engineering evaluation prior to securing or installing items in close proximity to

safety-related equipment.

This violation is cited in the enclosed Notice of Violation (Notice) and the circumstances

surrounding the violation are described in detailin the enclosed report. Please note that

you are required to respond to this letter and should follow the instructions specified in

enclosed Notice when preparing your response. The NRC will use your response, in part,

to determine whether further enforcement action is necessary to ensure compliance with

regulatory requirements.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,

its enclosure (s), and your response will be placed in the NRC Public Document Room

(PDR). To the extent possible, your response should not include any personal privacy,

proprietary, or safeguards information so that it can be placed in the PDR without

redaction.

Should you have any questions concerning this inspection, we will be pleased to discuss

them with you.

Sincerely,

W 3

Dennis F. Kirset7 Chief, Project Branch F >

Division of Reactor Projects

% M, g

-

9712160216 971205

ADOCK 05000416

as a

j,. llliml lis

a .e __--- Y .9//

PDR

G PDR lllll

asl

- s e mss.

l all s lll,als

'

C ~L

f

. -. -- .

..

- -- - - - . _ - - .- . _- -. ~ -.. - - . . _. -_

.. -.  ;

,

. Entergy Operations, Inc. -

2-

,

Docket No.: .50-416 -

License No.: NPF 29

Enclosures:

1. Notice of Violation

- 2. NRC inspection Report  ;

50 416/97 21

cc w/ enclosures:^

Executive Vice President

and Chief Operating Officer

Entergy Operations, Inc.

. P.O. Box 31995  !

Jackson, Mississippi 39286 1995

Wise, Carter, Child & Caraway

P.O. Box 651

Jackson, Mississippi 39205

Winston & Strawn

1400 L Street, N.W. - 12th Floor

Washington, D.C. 20005 3502

Sam Mabry, Director

Division of Solid Waste Management

Mississippi Department of Natural

Resources

P.O. Box 10385

Jackson, Mississippi 39209

President

Claiborne County Board of Supervisors

- Port Gibson, Mitsi>sippi 39150

- Manager of Operations

Bechtel Power Corporation

. P.O.' Box 2166

Houston, -Texas 77252-2166

General Manager

Grand Gulf Nuclear Station

Entergy Operations, Inc.

P.O. Box 756

Port Gibson, Mississippi 39150

1

. , + - ..--,w -c., .- ., , , . ~ , .. . -. , .-- ~ , . + , r,-r

-

-w.- - - - - - , v v - - - - . <-- , - - , - --, -r- = ~,,-,e ,

_ _ _ _ _ _ ___

-

.

Entergy Operations, Inc. 3-

The Honorable William J. Guste, Jr.

Attorney General

Department of Justice

State of Louisiana

P.O. Box 94005

Baton Rouge, Louisiana 70804 9005

Office of the Governor

State of Mississippi

Jackson, Mississippi 39201

,

Mike Moore, Attorney General

Frank Spencer, Asst. Attorney General

State of Mississippi

P.O. Box 22917

Jackson, Mir sissippi 39225

Dr. F. E. Thompson, Jr.

State Health Officer

State Board of Health

P.O. Box 1700

Jackson, Mississippi 39205

,

Robert W. Goff, Director

State Liaison Officer

Division of Radiation Health

Mississippi Depa1 ment of Health

P.O. Box 1700

Jackson, Mississippi 39215 1700

Vi':e President

Operations Support

Entergy Operations, Inc.

P.O. Box 31995

Jackson, M' **sippi 392861995

Director, Nucie Safety

and Regulatocy Affairs

Entergy Operations, Inc.

P.O. Box 756

Port Gibson, Mississippi 39150

i

.

+

r

Entergy Operations, Inc. -4

Vice President, Operations

Grand Gulf Nuclear Station

Entergy Operations, Inc.

P.O. Box 756

Port Gibson, Mississippi 39150

l

o

-n --,m -e

_ r. ~ c 1 me n _ . -

.

Entergy Operations, Inc. -5-

E Mail report to T. Frye (TJF)

E-Mail report to T. Hiltz (TGH)

E Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bec to DCD (IE01)

boc distrib. by RIV:

Regional Administrator Senior Resident inspector (River Bend)

DRP Director DRS PSB

Branch Chief (DRP/F) MIS Systern

Project Engineer (DRP/F) RIV File

Branch Chief (DRP/TSS) Senior Resident inspector (Grand Gulf)

DOCUMENT NAME: R:\_GG\GG721 RP.JLD

To receive copy of document, Indicate in box: "c" = Copy without enclosures *E" = Copy wtth enclosures "N" = No copy

RIV:SRl:DRP/F _,

RI:DRP/F C:DRP/F

JLDixon HernMM KDWeaver$ DFKirsch $LF/4

12f/97 6*jleit&A 12/4/97 Py7#W 12/,5/97 12/ /97 12/ /97

'DTFlClAL RECORD CO?Y

,