ML20203D473
| ML20203D473 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 07/14/1986 |
| From: | Tucker H DUKE POWER CO. |
| To: | Harold Denton, Youngblood B Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20203D477 | List: |
| References | |
| NUDOCS 8607210224 | |
| Download: ML20203D473 (3) | |
Text
e e
DUKE POWER GOMPANY P.O. DOX 33180 CHARLOTTE, N.O. 28242 vw. re aT July 14, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555 ATIENTION: Mr.iB.J'.j Youngblood, _-Director PWR Directorate No. 4
Subject:
McGuire Nuclear Station Docket Nos. 50-369, 50-370 Technical Specification Amendment for Containment Penetrations
Dear Mr. Denton:
By letter dated May 14, 1986, Duke Power proposed changes to relocate tables listing containment isolation valves (Table 3.6-2) from the Technical Specifi-cations into the Bases and to change the tables to reflect planned modifications.
As the result of a recent internal audit, it was determined that several changes are needed.
Additionally, per discussions between our respective staffs, it has been deter-mined that the Outage Service Penetrations need not be added to the table as these penetrations terminate in the annulus. This would exhaust any leakage from the penetrations through the annulus ventilation system, thus eliminating these penetrations as secondary containment bypass leakage paths.
The affected pages are included in Attachment 1; a summary of the changes and the justification are included in Attachment 2. provides an analysis conforming to the standards contained in 10CFR 50.92 as required by 10CFR 50.91 which concludes that the proposed changes do not involve a significant hazards consideration.
This request supplements an earlier proposal, thus no fees are enclosed.
3 per:188M 828Mr Aoo1 e
i n
i
l Mr. Harold R. Denton, Director July 14, 1986 Page 2 P
1 Please feel free to contact us if you require any additional information.
1 Very truly yours, i
x Hal B. Tucker JBD/44/jgm Attachment xc:
Dr. J. Nelson Grace i
Regional Administrator U.S. Nuclear Regulatory Cosmaission Region II i
101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 i
Mr. W.T. Orders i
NRC Resident Inspector 1
McGuire Nuclear Station Mr. Darl Hood, Project Manager Division of Licensing 1
U.S. Nuclear Regulatory Commaission Washington, D.C.
20555
,t i
Mr. Dayne Brown, Chief Radiation Protection Branch j
Division of Facility Services j
Department of Human Resources j
P.O. Box 12200 Raleigh, North Carolina i
i 1
f I
.--.w.
.._....,_.._,e.,.-.,....-_m-_,...
_.,-w.
.~ r
,.w.,...,_
-.~,7.,-,,,.,
,-, =
J Y
t I
ATTACHMENT 1 a
l J
t 1
i i
I I
4 E
f 6
B i
I t
1 i
f f
i I
'I l
4 f
ll a
1 1
I k
l 4
i i
i 4
a t
-w=-
- -wm-
-m w.
,s,,-
- w,.
.-w wm-