ML20203D450

From kanterella
Jump to navigation Jump to search
Forwards 1985 Refueling Outage Type B & C Local Leak Rate Test Summary
ML20203D450
Person / Time
Site: Fort Calhoun 
Issue date: 04/16/1986
From: Andrews R
OMAHA PUBLIC POWER DISTRICT
To: Thadani A
Office of Nuclear Reactor Regulation
Shared Package
ML20203D453 List:
References
LIC-86-117, NUDOCS 8604220112
Download: ML20203D450 (1)


Text

O Omaha Public Power District 1623 Harney Omaha. Nebraska 68102 2247 402/536-4000 l

April 16, 1986 LIC-86-ll7 Mr. Ashok C. Thadani, Project Director PWR Project Directorate #8 Division of PWR Licensing - B Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555

Reference:

Docket No. 50-285

Dear Mr. Thadani:

1985 Refueling Outage Type B and C Local Leak Rate Test Summary Pursuant to the requirements of Fort Calhoun Station Unit No.1 Technical Specification 5.9.3.e and 10 CFR 50, Appendix J, the Omaha Public Power District submits the attached report which summarized the Type B and Type C Local Leak Rate Tests conducted during the 1985 refueling outage. g Sincerely, R. L. Andrews Division Manager Nuclear Production RLA/TPM/me l

Attachment cc: LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Ave., N.W.

Washington, DC 20036 E. G. Tourigny, NRC Project Manager P. H. Harrell, NRC Senior Resident Inspector

$ %42gg y h g5 r

a o.

l sg 45 5124 Employmen htaualopponunay