Forwards Insp Rept 99900373/85-01 on 851021-23 & Notice of Nonconformance
ML20203D391
Person / Time
Issue date: 04/18/1986
From: Zech G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Lenz H
COOPER ENERGY SERVICES
Shared Package
ML20203D397 List:
References
REF-QA-99900373 NUDOCS 8604220100
Download: ML20203D391 (2)


Text

-

?

g / o g UNITED STATES

! o NUCLEAR REGULATORY COMMISSION

y WASHINGTON. D. C. 20555

\ *****

/ April 18, 1986 Docket No. 99900373/85-01 Cooper Energy Services En-Tronic Controls Division ATTN: Mr. H. D. Lenz Manager, Engineering North Sandusky Street Mount Vernon, OH 43050 Gentlemen:

This refers to the inspection conducted by E. H. Trottier of this office on October 21-23, 1985, of your facility in Mount Vernon, Ohio and to the discussions of our findings with you af ^ members of your staff at the conclusion of the inspection.

This inspection was performed as a result of the false RPM indication experienced by Cooper-Bessemer standby diesel engines at Byron Station on September 26, 1984 and July 6, 1985. The inspection also sought to establish the adequacy of your quality assurance program and your adherence to the requirements of 10 CFR Part 21. Areas examined during the inspection and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.

During the inspection it was found that there was no objective evidence to show the internal audits were conducted in calendar year 1983, and no evidence was found to establish that En-Tronic exercised adequate control over purchased material, equipment and services (no list of approved vendors). The specific findings and references to the pertinent requirements are identified in the enclosures to this letter.

Please provide us within 30 days from the date of this letter, a written statement containing: (1) a description of steps that have been or will be taken to correct the item of nonconformance; (2) a description of steps that have been or will be taken to prevent recurrence; and (3) the dates your corrective actions and preventive measures were or will be completed.

Consideration may be given to extending your response time for good cause shown.

The responses requested by this letter are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

hh 99900373 h l h ll

i E

Cooper Energy Services April 18, 1986 4

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's

. Public. Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, '

Original Signed iff Gary G. Zach Gary G. Zech, Chief Vendor Program Branch Division of Quality Assurance, Vendor and Technical Training Center Programs Office of Inspection and Enforcement

Enclosures:

1. Appendix A-Notice of Nonconformance
2. Appendix B-Inspection Report No. 99900373/85-01
3. Appendix C-Inspection Data Sheets (5 pages)

Distribution:

A B:lE:09 VPB Reading DQAVT Reading RVollmer JStone EMerschoff ETrottier(2)

LParker WHaass 1

  • Se previous page for concurren
VT SC/VPB:DQAVT /VPB:00AVT ETrottier:tt* EMerschoff" 6HiGZech 03/05/86 03/14/86 4 / lif86 a OM^ 36 W

.. - . . .- .. . - _ - -- -- . . - _ _ _ -