4 Walsir El.EC'l MIC AND POWIW CmWANY Hn:numn, buis:4 uni December 10, 1997
- United States Nuclear Regulatory Commission Serial No.97-718 Attention: Document Control Desk MPW/ETS Washington, D.C. 20555 Docket Nos. 50-338, 50-339 License Nos. NPF-4, NPF-7 Gentlemen:
EiDINIA ELECTRIC AND POVLER COMPANY RORTH ANNA POWER STATION UNITS 1 AND 2 BEGQMMENDATIONS FROM THE SAFETY AUDIT OF THE
_SLAVICE WATER RESERVOIR DAM AT NORTH ANNA j
On February 12,1997 Federal Energy Regulatior. Commission (FERC) performed an inspection of the Service Water Peservoir Dam. The results of the inspection were l
provided to Virginia Electric and Power Company (Virginia Power) by the NRC in an l
inspection report dated November 13, 1997. The results of the dam safety audit l
identified recommendations with corrective actions to be taken immediately (within 30 l
days), short term (with:n 90 days), and inte mediately (within 120 days). After reviewing the audit it was noted that information regarding stability calculations may have been misinterpreted. Initial conversations between Virginia Power and the Federal Energy Regulatory Commics:on confirmed this assumption.
Subsequently, conversations between Virginia Power and the NRC Project Manager identified tho need for a meeting between the three parties to discuss the recommended actions and applicable corrective action dates.
l A meeting between the NRC, Virginia Power, and FERC has been tentatively scheduled for early January 1996. It is our understanding that the recommendations and corrective action completion dates will be established at this time. Should you l
have any questions regardilig this letter, please contact us.
Very truly yours,
,I y
. K n er ce ident - Nuc' ear Operations
- Commitments mada in this letter:
None
,',4' I.ILi.l llll1.11..Ill.i
~
, m u,w ea m m 7 m amp;e
l0 l
o
'cc:
U. S. Nuclear Regulatory Commiss!on Reg'on 11 Atlanta Federal Center 61 Forevth St., SW, Suite 23T85 Atlanta, Gorgia 30303 Mr. M. J. Morga, NRC Senior Resident inspector North Anna P wer Station o
Mr. Jerrold W. Got:mer, Director Federal Energy Regulatory Commission Atlanta Regional Office Parkridge 85 North Building 3125 Presidential Parkway - Suite 300 Atlanta, Georgia 30340 i