HOPE CREEK GENERATING STATION MONTHLY OPERATING

SUMMARY

The Station continued to perform Technical Specifications Surveillances in preparation for initial criticality.

Initial criticality was achieved at 2318 on June 28, 1986.

The Power Ascension Group performed low power physics testing through the end of the month.

d i

OPERATING DATA REPORT DOCKET NO.

50-354 UNIT Hope Creek _ Gen. Station DATE 7/10/86 COMPLETED BY Mike _A.

Philliys TELEPHONE (609) 339-3738 OPERATING STATUS 1.

REPORTING PERIOD June GROSS HOURS IN REPORTING PERIOD 720 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt) 164.65 MAX. DEPEND. CAPACITY (MWe-Net)

_1067 DESIGN ELECTRICAL RATING (MWe-Net) 1067 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net) 53.35 4.

REASONS FOR RESTRICTION (IF ANY) 5%

THIS YR TO MONTH DATE CUMULATIVE 5.

NO. OF HOURS REACTOR WAS CRITICAL 31.5 31._ _5 31.5 6.

REACTOR RESERVE SHUTDOWN HOURS 0

O__

_0 7.

HOURS GENERATOR ON LINE O

O O

8.

UNIT RESERVE SHUTDOWN HOURS 0

0_

0 9.

GROSS THERMAL ENERGY GENERATED (MWH) 0_

0 0

19. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 0

0

11. NET ELECTRICAL ENERGY GENERATED (MWH) 0 0

0

12. REACTOR SERVICE FACTOR N/A
13. REACTOR AVAILABILITY FACTOR N/A
14. UNIT SERVICE FACTOR N/A I
15. UNIT AVAILAB1LITY FACTOR N/A
16. UNIT CAPACITY FACTOR (Using Design MDC)

N/A

17. UNIT CAPACITY FACTOR (Using Design MWe)

N/A

18. UNIT FORCED OUTAGE DATE N/A
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION):

4 (See attached) j

28. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 07/01/86 j

l

21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) :

FORECAST ACHIEVED INITIAL CRITICALITY

_6/15/86 6/28/86 INITIAL ELECTRICITY

_7/26/86 COMMERCIAL OPERATION

_11/24/86

SCHEDULED SHUTDOWNS (ITEM 19)

TYPE DATE-DURATION 1.

LOP Test.- Scram 8/12/86 2 days 2.

Shutdown Outside Control. 8/31/86 4.5 days

. Room - Scram i

3.

MSIV Isolation - Scram 11/12/86 2 days i

I I

4.

Load Rejection - Scram 11/17/86 4.5 days i

r i

f I

s t

5 J

J a

i l

I a

,,e-

,. +., - - - -,,, -,,

4-

.- - - + - -a

+c.,.

.-,-,--w-r.

~,, -.

m.,

.-e,-w w,,

,--c.,-,<----.

--r'.-,y

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-354 UNIT Hope Creek Gen. Station DATE 7/10/86 COMPLETED BY Mike Phillips TELEPHONE 609-339-3738 MONTH June 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

17 0

2 0

18 0

3 0

19 0

4 0

23 0

5 0

21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

13 0

26 0

11 0

27 0

12 0

28 0

13 0

29 0

14 0

30 0

15 0

31 16 0

v c-w

,n

. ~

d

OPERATING DATA REPORT UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-354 UNIT NAME Hope Creek Gen. Station DATE 7/10/86 COMPLETED BY Mike A.

Phillips REPORT MONTH June 1986 TELEPHONE (609)-339-3738 METHOD OF SHUTTING DOWN THE TYPE REACTOR OR F FORCED DURATION REASON REDUCING CORRECTIVE ACTION /

NO.

DATE S SCHEDULED (HOURS)

(1)

POWER (2)

COMMENTS 6/1 S

658 H

4 Hope Creek remain.ed in Operational Condition 4, Cold Shutdown until Startup commenc'ed at 1036 on 6/28/86.

1 6/29 F

9 G

3 Operator error in ranging an IRM down too soon resulting in an IRM upscale trip.

2 6/30 F

5 A

2 Shutdown to perform troubleshooting on the Reactor Manual Control System.

l

SUMMARY

O PSEG l

I

~

Public Service Electric and Gas Company P.O. Box L Hancocks Bridge, New Jersey 08038 Hope Creek Operations July 10, 1986 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Dear Sir:

MONTHLY OPERATING REPORT HOPE CREEK GENERATING STATION UNIT 1 DOCKET NO. 50-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for June are being forwarced to you.

Sincerely yours, f

R. S. Salvesen General Manager Hope Creek Operations KMH:bar Distribution CC Regional Administrator USNRC Region I 631 Park Avenue i

King of Prussia, PA 19406 Enclosures The Energy People 95 2173 it 1 M) 12-05