ML20203C450
| ML20203C450 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 12/09/1997 |
| From: | Tam P NRC (Affiliation Not Assigned) |
| To: | NRC (Affiliation Not Assigned) |
| References | |
| TAC-M98863, NUDOCS 9712150312 | |
| Download: ML20203C450 (3) | |
Text
.,
Js# V%f**4.
UNITED STATES y
lj-
' [~
NUCLEAR REGULATORY COMMISSION r
WASHINGTON, D.C. 2066H001
^q V,
December 9,1997 as MEMORANDUM FOR:
Docket File
- m FROM:
Peter S. Tam, Senior Project Manager Project Directorate ll-2 4
- M Division of Reactor Projects - 1/II Office of Nuclear Reactor Regulation
~
SUBJECT:
CATAWBA UNIT 2 -IMPLEMENTATION OF AMENDMENT 154 TO OPERATING LICENSE (TAC M98863)
The attached 2-page document, transmitted by fax from Duke Energy Corporation, signifies the implementation of operating license Amendment 154 on November 25,1997.
Docket Numbem 50-414 Distribution Docket file PUBLIC H. Berkow l
D P D I'i i em uuo er t,a:a_ag; ggpy lllll llllll l lll ll n.ua 9712150312 971209 PDR ADOCK 05000414 P
I v;
bedeer Policy Massal Valone 2 Ns0 Apg.enda D. 221. Implemadatice $best APPENDIX D. 221. FACILITY OPERATING LICENSE / TECHNICAL SPECIFICATIONS AMENDMENT IMPLEMENTATION SHEET FACILffY OPERATING LICENSETI'ECHNICAL SPECIFICAllONS AMENDMENT IMPLEM13TATION SIIELT CNS O MSS O ONS UNIT NO. O ik2 0 3 N. M Ecua DATE RECEIVED NlMl97 1s No.
AMENDMENT.NO. l 5 h DESCRIPTION Mtdo kb h. Eh C'* e n To % b *. g o N S CA. R N w e6 W t.
- 1. IMPLEMENTATION DATIS A. NRC ISSUE DATE (Date of NRC Cover Letter):
Il[ l 3 /*l 7 II I3}TI B. NRC EFFECTIVE DATE (From Ten of NRC letter):
C. STATION IMPLEMENTATION G4 mm u.u GC Eh,"48 iL 12.l9 7
- 2. PLANT NOTIFICATION INtialt date AhMsMia E Mail D.stribution; include S:te Tech:tical Contacts BCL_/nbsbffC imp ementation iterns (Items 1 5) l
- 3. RCC TECHNICAL CONTINT REVIEW CRITERIA O
A. All Discrepancies Have Been Resolved Via NRC Intetface.
4 O 4 B. No inadvertent Chantes Were Made Tn TS Wets Invnived K C, TS Change Was issued A Requested By DPC.
b de$
UM 7
TECHNICAL REVIEWER:
(Ust Discrepan 'es On Attae Pay-)
h Date ll!&'J[17-CHECKED BY:
144s '
d
/
(Ust Discrepancies On Attached Page)
Date
- 4. PIP NUMBER (If generatod): __1"(D 7 ' 377 4 g $ O ALL CORRECTIVE ACTIpNS FROM AaiSIGNED P!P COMPLLM VERIFIED BY; N/
N A
N Regulatory Cornpliance Date Wf N--h o.cki we ik
@gp - h4pq 5
b (3e JLK 19n) 0 221 27 200 3 XIKGY VEnV1Y3 9Ztc ICS COSG ST*9I 16/90/IT
y..* ' ~
c 1
N5D Appenex D. 221. Implestatdan Sheet Nedar Po% Manual.Yh 2 FACILITY OPERATING LICENSETTECHNICAL SPECinCATiONS AMENDMENT IMPLEMENTAT10N SHt;LT
- 6. T'INAL IMPLEML'NTATION APPROYAL RS m
- uWh, Manaest. RegWmory Comphance \\)
Date
~
&du
%ubMau o
Mannaer, safety Auurance
' Date
~
- Approval may be waived (see 221.8 hem 6).
- 7. ADVANCE 1MPLEMESTATION YNb
/A/,lo G1tespo#UE Lie 6eds: Ind.vidual Date SCOkOOM/ WORK CONTROL NOTIFICATION ul. In 6.2
- ResporMee%nsing Individual Date 6.2.1 INSTRUCTIONS TO OSM/SWMICRSROlWCSRO (if needed)
_ V,I,A i
6.2.2 ACKNOWLEDOMENT OF RECEIPT OF ADVANCE COPIES BY OPERATIOSS PERSONNEL
[97 h
d[
1A W (5d -
' ' ~
W4
/ i Ciste L
Date
- 8. DOCL* MENT CONTROL DISTRIBLTION A copy of the Techrucal specif*ation packat bu been forwarded to Document Management for statir tribution.
Q Qld b l AITNb0 W M
ResponsINe tleeneing IndMdual
' Date
- 9. ITNAL REGULATORY COMPLJANCE SIGNOFT Manager. Regulatory Ccmpliance Date D 22128 (30 JL'N 1m)
- _-__________________