ML20203B605
| ML20203B605 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 02/17/1998 |
| From: | Mccoy C SOUTHERN NUCLEAR OPERATING CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| LCV-1150, NUDOCS 9802240335 | |
| Download: ML20203B605 (2) | |
Text
_ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
C. K. McCoy Southern Nucimr j.2 president Operating Company. inc.
Vogtle Prt.;wt 40 invemess Center Parkway PO Box 1295 Birmingham Alabama 35201 Tel 205932.7122 Fax 205932 0403 SOUTHERN h COMPANY Enery to Serve) bur %rld" February 17, 1998 LCV ll50 Docket Nos.
50 424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 ladies and Gentlemen:
VOGTLE ELECTRIC GENERATING PLANT WITilDRAWAL OF PROPOSED CilANGE TO TECilNICAL SPECIFICATIONS As part of the conversion of the Vogtle Electric Generating Plant (VEGP) Unit I and Unit 2 Technical Speci6 cations (TS) to the improved Standard Technical Specifications, Southern Nuclear Operating Company (SNC) proposed an extended Completion Time of 14 days (versus 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />) for Limiting Condition for Operation (LCO) 3.6.6, Containment Spray and Cooling Systems. During the NRC review of the conversion, SNC agreed to separate the proposed extended Completion Time for LCO 3.6.6 from the conversion of the VEGP TS for later review by the NRC. The original basis for the proposed change was essentially risk based, and the NRC has recently indicated a need for a deterministic basis that was not a part of our original submittal. SNC is now in the process of reevaluating the basis and the need for the proposed extended Completion Time for LCO 3.6.6, and in the interim, SNC has elected to withdraw the subject proposed change. Should our reevaluation indicate a need for the proposed change, SNC will resubmit including a deterministic as well as a risk basis for the proposed change.
Sincerely,
)
C. K. McCoy CKM/NJS gg 9802240335 900217 PDR ADOCK 05000424 P
PDR S:\\VOOTLEVOGTL.E KVENIECllSPEC\\LCVil50 DOC
,U. S. Nuclear Reguhtory Commission LCV 1150 Page 2 xc:
Southern Nuclear Operating Comnany Mr. J. B. Ileasley, Jr.
Mr. M. Sheibani NORMS U. S. Nuclear Regulatory Commission Mr. L. A.11 eyes, Regional Administrator Mr. D.11. Jaffe, Senior Project Manager, NRR Mr. John Zeiler, Senior Resident inspector, Vogtle i
S.WOOT1.EW(XTT1.E.KVE\\TEC1 ISPIDI CVI I $ 0. DOC