Text
- -
.-.~
pann
=
1 UNITED STATES pp
}.
NUCLEAR REGULATORY COMMIS810N WASHINGTON, D.C. 30eeH001 o
_ february 17, 1998 l
1 DOCKET:
70 1113 LICENSEE:
General Electric Compcfiy 3
Wilmington, North Carolina 4
SUBJECT:
SAFEGUARDS EVALUATION REPORT: SUBMITTAL DATED NOVEMBER 13,1997, REVISION TO FUNDAMENTAL NUCLEAR MATERIAL CONTROL PLAN F
i BACKGROUND 1
By cover letter dated November 13,1997, General Electric (GE) submitted changes to its Fundamental Nuclear Mate ial Control (FNMC) Plan, none of which represented a decrease in effectiveness relative to the commitments in the existing approved Plan. Thus, the submitted FNMC Plan revisions qualify as changes permitted by 10 CFR 70.32(c).
E plSCUSSION The licenses submitted various changes to the FNMC Plan within Chapters 3.0 (Management Structure),4.0 (MC&A Measuremer.ts), and 7,0 (Identification and Resolution of Significant S5ipper-Receiver Differences). In all, the subject chapters of the FNMC Plan were submitted i
ih a new designated date. These Plan changes involved:
Correction of typographic errors throughout the subject chapters, o
A revision to address the handling of certain materials of very low uranium e
l concentration, and
-e Clarification of transforred material from other licensees and addition of enrichment confirmation measurement.
I All the ' proposed changes had been previously discussed with the NRC MC&A liceming reviewer and upon review were found to be acceptable.
CONCLUSION
- The staff concludes that the licensee's FNMC Plan revision does not decrease the effectiveness of the MC&A safeguards program and is, therefore, acceptable. The staff also determined that -
. the revised Plan coritains appropriate and necessary' commitments to satisfy applicable MC&A
. regulations specified in 10 CFR 74.31, The Operations Branch (FCOB) inspection staff has no objection to this proposed action.
g N
PRINCIPAL CONTRIBUTOR
_ Thomas N. Pham