Informs That in Util 980126 Results of SG Tube Insps Conducted During Unit End of Cycle 10 Refueling Outage Incorrectly Reported.Correct Number of Tubes Inspected Listed as Follows
ML20203B003
Person / Time
Site: Catawba 
Issue date: 02/12/1998
From: Gordon Peterson
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9802240182
Download: ML20203B003 (2)


Text

i Duke Power Company A skar f a,y Compnes Cauwba Nrclear Ss.stien nE,w, %

4800 Concord Road s

York. SC 29745 Gnry R. Veterson (803) d31-4251 omcr Vuel>nid,m (803) 8313s.6la February 12, 1998 U.S. Nuclear Regulatory Commissio..

Document Control Desk Washington, D.C.

20555

Subject:

Catawba Nuclear Station, Unit 1 Docket No. 50-413 Revision to Special Report Steam Generator Tube Inspection In my letter of January 26, 1998 the results of the steam generator tube inspections conducted during the Unit 1 End of Cycle 10 refueling outage were reported.

In that letter, the number of tubes inspected was incorrectly reported.

The correct number of tubes inspected is as follows:

Tubes Inspected Steam Generator Full Length A

6625 B

6633 C

6626 D

6629 There is no change to the information provided in my Jar.uary 26, 1998 letter on size and location of tube imperfections.

If additional information on this matter is required, please contact G.A.

Copp oc (803)831-3622.

Ver tr y y tirs I

l m'.

/

G. R.

Peterson

/\\vot

t./ J "O ll ll ll 11llllllll 9802240182 980212

            • o PDR ADOCK 05000413 P

PDR

U.S. Nuclear Regulatory Commission

.F,ebruary 12, 1998

'Page 2 xc:

Mr.

P.S.

Tam, NRC Project Manager Office of Nuclear Reactor Regulation Mr.

L.A.

Reyes, Regionel Adm :istrator 4

U.S. Nuclear Regulatory Cominission, Region II Mr.

D.J.

Roberts, Senior Resident Inspector Catawba Nuclear Station