ML20203A052
| ML20203A052 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 02/04/1998 |
| From: | Hood D NRC (Affiliation Not Assigned) |
| To: | Sylvia B NIAGARA MOHAWK POWER CORP. |
| References | |
| NUDOCS 9802230260 | |
| Download: ML20203A052 (5) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ - _
o o nog N O'O k
y I
yo UNITLJ STATES g
NUCLEAR REQULATORY COMMISSION WASHINGTON, D.C. 30006 0001 k.....
l Fdruary 4,1998 Mr. B. Ralph Sylvla Executive Vice President Generation Business Group and Chief Nuclear Omcor Nirgara Mohawk Power Corporation Nuclear Leaming Center 450 Lake Road Oswego, NY 13126
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE NINE MILE POINT NUCLEAR STATION UNIT NO. 2
Dear Mr. Sylvia:
By your application dated December 15,1997, and amdavit dated December 5,1997, executed by Glen A. Waterford of General Electric, you submitted *NMP 2 Cycle 7 SLMCPR," dated December 2,1997, and requested that it be withheld from public disclosure pursuant to 10 CFR 2.790. A nonproprietary version was also submitted.
You stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
1.
Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by General Electric's competitors without license from General Electric constitutes a competitive economic advantage over other companies; 2.
Information..hich, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product; 3.
The information identified is classified as proprietary because it contains details of GE's Baiety Limit MCPR analysis and the corresponding results which GE has applied to this specific plant and cycle's actual core design with GE's fuel.
7 0
The development of the methods used in these analysis, along with the testing, development and approval of the supporting critical power correlation was achieved at a significant cost, on the order of several million dollars, to GE.
,g/
We have reviewed your application and the materialin accordance with the requirements of 10 CFR 2.790 and, on the basis of your statements, have determined that the submitted information sought to be withhold contains proprietary commercial information.
Therefore, ihe version (s) of the submitted Information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
9002230260 980204 PDR ADOCK 05000410 1 7 p'r'(*.m qkg gggff y
P PDR Lhwu Gj
.; @ D
{'! ].,,,,.'
l.
{" ["
Fdruary 4,1998 B. Sylvia 2-Withholding from public inspection shal! not affect the right, if any, of persons property and directly concemed to inspect the documents, if the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information, if the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this
- determination in the future, for example, if the scope of a Freedom of Information Act request includes your informatico. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
Sincerely, Original Sigmd by:
Darl S. Hood, Senior Project Manager Project Directorate 11 Division of Reactor Projects - t/ll Office of Nuclear Reactor Regulation Docket No. 50-410 cc: See next page DISTRIBUTION.
Docket File PUBLIC PDI 1 R/F B. Boger S, Bajwa S. Little-D. Hood M.P. Siemien, OGC (email MPS)
C. - Hehl, Region i DOCUMENT NAME: G:\\NMP2\\ WITHHOLD.NM2 To receive a copy of. this document, indicate in the. box:
"C" = Copy without f
,t &
-attachment / enclosure "E" - Copy gith attachment / enclosure "N":= lio copy
/
ll,
OFFICE P91:P0l*1 lE LAtP0l* @ Y I
0 POI 1. f y1 l
I NAME Disood/rst E //
SLittLt
- Stejus 4 4-4 MP$lemien N M i
T %L((4/ 7 OttE 01/18(/98 01/L6/98 S/4 /9C OD R/98 de4/ h /_98 Official Record Copy 44 41 i
fdniary 4,1998 t
1 B. Sylvia 2-Withholding from public inspection shall not affect the right, if any, of persons property and directly concemed to inspect the documents. If the need arises, we may send copies of this info,mation to our consultants working in this area, We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information, if the basis for withholding this information from public inspection should change in the future
- uch that the information could then be made available for public inspection, you should promptly notify the NRC, You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes yourinformation. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
Sincerely, Original Signed by:
Darl S Hood, Senior Project Manager Project Directorate l*1 Division of Reactor Projects t/fl Office of Nuclear Reactor Regulation Docket No. 50-410 cc: See next page DISTRIBUTION:
Docket Flie PUBLIC PDI 1 R/F B Boger S, Bajwa S, Little D. Hood M.P. Siemien, OGC (email MPS)
C, Hehl, Region i DOCUMENT NAME: G:\\NMP2\\ WITHHOLD.NH2 To receive a copy of this document, indicate in the box:
"C" - Copy without attachment / enclosure
- E" - Copy 3with attachment / enclosure "N" - No copy
/ _,
,1 p 0FFICE PM PDI*1 IE LAtPDi* @ V l
OtPDI 1
.,O I
I WAME DNood/rst Jt.5//
SLittie" ~
5teJwe,M/%
MP$lemlen d M b
"I YCL( tk )
DAff 01/laff93 01/[$ /98 C/4 /98 O Q A /98 JM/ h /38 Official Record Copy L
pil
i B. Sylvla 2-Withholding from public inspection shall not affect the right, if any, of persons properly and directly concemed to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that tha consultants have signed the appropria's agreements for handling proprietary information.
if the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to ieview this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information, in all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
Sincerely, Dart S. Hood, Senior Project Manager Project Directorate 11 Division of Reactor Projects.1/ll Office of Nuclear Reactor Regulation Docket No. 50 410 l
cc: See next page d
(-.
B. Ralph Sylvia Nine Mile Point Nuclear Stauon Niagara Mohawk Power Corporation Unit No. 2 oc:
l Mr. Richard B. Abbott Charles Donaldson, Esquire Vice President and General Manager Assistant Attomey General l
Nuclear. Acting Unit 1 Plant Mgr.
New York Department of Law Nine Mile Point Nuclear Station 120 Broadway P.O. Box 63 New York, NY 10271 l
Lycoming, NY 13093 Mr. Richard M. Kessel Mr. Carl D. Terry, Vice President Chair and Executive Director Nuclear safety Assessment state consumer Protection Board and Support 99 Washington Avenue
- Niagwa Mohawk Power Corporation Albany, NY 12210 P.O. Box 63 Lycoming, NY 13093 Mark J. Wetterhahn, Esquire Winston & Strewn Ms. Denise J. Wolniak 1400 L street. NW.
Manager Licensing Washington, DC 20005 3502-Niagara Mohawk Power Corporation Nine Mile Point Nuclear station Gary D. Wilson, Esquire -
P.O. Box 63 Niagera Mohawk Power Corporation Lycoming, NY 13093 -
300 Erie Boulevard West Syracuse, NY 13202 -
Mr. Kim A. Dahlberg Vice President Nuclear Operations Mr. F. William Valentino, President Acting Unit 2 Plant Manager -
New York State Energy, Research,-
Nine Mile Point Nuclear Station and Development Authority P.O. Box 63 Corporate Plaza West Lycoming, NY 13093 -
286 Washington Avenue Extension Albany, NY 12203-6349 Mr. John T. Conway Vice President Nuclear Engineering Supervisor Nine Mile Point Nuclear Station Town of Scriba Niagara Mohawk Power Corporation Route 8,' Box 382 P.O. Box 63 Oswego,NY 13126 Lycoming,' NY 13093 -
Mr. Richard Goldsmith Regional Administrator, i :.;;!on 1 Syracuse University U. 8. Nuclear Regulatory Commission College of Law 475 Allendale Road E. l. White Hall Campus King of Prussia, PA 19406 Syracuse, NY 12223 Resident inspector Mr. John V. Vinquist, MATS Inc.
Nine Mile Point Nuclear Station P.O. Box 63 P.O. Box 126 Lycoming, NY 13093 -
Lycoming, NY 13093 '
Mr. Jim Rettberg New York State Electric & Gas Corporation Corporate Drive Kirkwood industrial Park P.O. Box 5224 Binghamton, NY 13902 5224
_d