ML20203A036
| ML20203A036 | |
| Person / Time | |
|---|---|
| Site: | Zion File:ZionSolutions icon.png |
| Issue date: | 07/11/1986 |
| From: | Hehl C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| References | |
| NUDOCS 8607170165 | |
| Download: ML20203A036 (3) | |
Text
\\v JUL 11 19S6 Docket No. 50-295 Docket No. 50-304 Conmonwealth Edison Company ATTN: Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690
Dear Mr. Reed:
SUBJECT:
REQUALIFICATION PROGRAM EVALUATION In a telephone conversation between Mr. M. Carnahan, Zion Generating Station, and Mr. R. L. Higgins, Region III, arrangements were made for an evaluation of the requalification program at the Zion Generating Station. The evaluation visit is scheduled for the week of October 13, 1986.
For this visit, the NRC examiner will administer NRC prepared written, oral, and simulator examinations. When the NRC examiner arrives at the site, he will meet with the appropriate facility personnel to review the schedule for those examinations. For the examiner to adequately prepare for this visit, it will be necessary for the facility to furnish the approved reference material listed in Enclosure 1, " Reference Material Requirements for Requalification Program Evaluations," to EG&G Idaho, Inc., attention Frank Jaggar, Box 1625/TSB, 1580 Sawtelle Street, Idaho Falls, Idaho 83415, and Pacific Northwest Laboratory, attention Leo Defferding, Sigma 3 Building, Box 999, Richland, Washington 99352 by August 18, 1986. Mr. Carnahan has been advised of our reference material requirements and where they are to be sent.
This request for information was approved by the Office of Management and Budget under Clearance Number 3150-0101, which expires May 31, 1989.
Conments on burden and duplication may be directed to the Office of Management and Budget, Reports Management Room 3208, New Executive Office Building, Washington, D. C. 20503.
Thank you for your consideration in this matter.
If you have any questions on the evaluation process, please contact R. L. Higgins at 312-790-5651.
Sincerely, Url"E n1 U r d 117 C. W. IIshi Charles W. Hehl, Chief Operations Branch
Enclosure:
As stated e60717o165 e60711 See Attached Distribution
[
N RL II Rp :IMM V
RIII RIII Ui w f~k a
Burpic gie Hehl Higgins/mab 07/11/86
?/ DIM Q$g qh y m
feux
I l-Comanwealth Edison Company 2
JUL 11 1936 l
-Distribution cc w/ enclosure:
D. L. Farrar, Director of Nuclear Licensing G. J. Plim1, Station Manager M. Carnahan, Training Supervisor DCS/RSB (RIDS)
Licensing Fee Management Branch Resident Inspector, RIII Phyllis Dunton, Attorney General's Office, Environmental Control Division Mayor, City of Zion cc w/o enclosure:
J. A. Norris, Project Manager, NRR B. A. Boger, Branch Chief, OLB l
f l
l
ENCLOSURE 1 REFERENCE MATERIAL REQUIREMENTS FOR REQUALIFICATION PROGRAM EVALUATION 1.
All administrative procedures (as applicable to reactor operation or safety) 2.
Al~1 integrated plant procedures (normal or general operating procedures)
I 3.
Emergency procedures (emergency instructions, abnormal, or special procedures) 4.
Standing orders (important orders which are safety-related to and may supersede the regular procedures) 5.
Fuel-handling and core-loading procedures (initial core-loading procedure, when appropriate) 6.
Annunciator procedures (alarm procedures, including set points) 7.
Radiation protection manual (radiation control mar.ual or procedures) 8.
Technical Specifications
- 10. Lesson plans (training manuals, plant orientation manual, systems descriptions)
- 11. Systems operating procedures
- 12. Piping and instrumentation diagrams, electrical single-line diagrams, or flow diagrams
- 13. Copies of facility R0 and SR0 requalification examinations administered during the past 2 years
- 14. An index of administrative, operating, abnormal and emergency procedures
- 15. Plant technical data (curve) book
- 16. Simulator malfunction list with descriptive suurary of malfunction effects.
All of the above referenced material should be approved, final issues and should be so markeri. Uncontrolled, preliminary, or other such issues will not be acceptable. All procedures and reference material should be bound or in the form used by the control room operators, with appropriate indexes or tables of contents to ensure efficient use.
,