ML20202H063

From kanterella
Jump to navigation Jump to search
Submits List of Delivery Confirmations in Accordance W/ Requirements of Convention on Physical Protection of Nuclear Matls
ML20202H063
Person / Time
Site: 07001252
Issue date: 01/12/1998
From: Condrey D
EDLOW INTERNATIONAL CO.
To: Bennington G
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
NUDOCS 9802200284
Download: ML20202H063 (1)


Text

_..

M wad

,mmet IMlow Intemational Company I

i 1666 Connecticut Asc., N.W., Suite 201

~ kIlk7R gQ Washington, D.C. 2(XXN ILS A.

,.)

Tel(202) 483-4959 l

~

ft. 202)483 4840 e mail: edlowcoGr ol.com a

FACSIMILE MESSAGE g

TO:

Ms. Gloria M. Bennington January 12, 1998 U.S. Nuclear Regulatory Commission Page 1 of 1 Mail Stop O-6 F 18 Fax # 301-415-8555 FROM:

Mr. Daren Condrey Edlow International REF:

Delivery confirmation In accordance with the requirements of the Convention on the Physical Protection of Nuclear Materials we hereby provide the following delivery confirmations:

OUR REF SHIPMENT DESCRIPTIOl_.

CONSIGNEE DATE OF DELIVERY l

TRNB-ENI-001 71 KG: UO2 (e)

Framatome Cogema 11/25/97 KLKX-ENE-121 18,911 KGs UF6 (e)

Japan Nuclear 12/10/97

,NCSX-ENI-028 2,300 KGs UF6 (e)

Siemens 12/03/97

-SAMD-ENE-033 10,567 KGs UF6 (e)

Korea Nuclear 12/17/97 i

SIEM-NUI-001 41,000 KGs UO2 (e)

Siemens 12/28/97 CENO-ENF-024 1,580 KGs UO2 (e)

ABB Atom 12/24/97 PALM-ENX-001 27,128 KGs UF6 (e)

Korea Electric 12/19/97 CENO-ENE-020 38,102 KGs UO2 (e)

Korea Nuclear 12/20/97 CENO-ENE-019 14,075 KGs UO2 (e)

ABB CE 01/05/98 CENO-ENE-022 370 KGs UO2 (e)

ABB CE 01/09/98 NCSX-ENI-030 18,861 KGs UF6 (e)

GE 01/09/98 USEC-ENI-033 79,800 KGs UF6 (e)

USEC 01/09/s8 1 SIKM-FFI-001 93,500 KGs UO2 (a)

Siemens 01/09/98 i

The original notice will be mailed today.

(o

{

7

  • 2s n.~.um'mia 9802200284 980112 s
  • o a

PDR ADOCK 07001252 C

PDR

.. =.

_ _.