ML20202H029

From kanterella
Jump to navigation Jump to search
Forwards Revs to Fundamental Nuclear Matl Control Plan.Revs Withheld (Ref 10CFR2.790(d))
ML20202H029
Person / Time
Site: 07001113
Issue date: 06/23/1986
From: Winslow T
GENERAL ELECTRIC CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
27159, NUDOCS 8607160177
Download: ML20202H029 (1)


Text

DESIGNATED ORIGINAL 76- ///3 GENERALh ELECTRIC NMSS DOCKET FILE PDR: LETTER ONLY

[

[ NUCLEAR FUEL & COMPONENTS MANUFACTURING GENERAL ELECTRIC COMPANY + P.O. BOX 780. WILMLNGTON, NCRTH CARO.UNA 28402 OI g.

June 23, 1986

%Cb S

g33 L m

~y Dr. J. Nelson Grace, Regional Director JUL ggioRi d L.,

gsuG%ss.oM h

U.

S. Nuclear Regulatory Commission, RI

.~ g w

@ggss, P. O. Box 2203 9

C p

n Atlanta, Georgia 30301 tpA
  • =

o 4

4 o 'r3 "7

Dear Dr. Grace:

CJ1 M

Reference:

NRC License SNM-1097, Docket #70-1113 m

Subject:

FUNDAMENTAL NUCLEAR MATERIAL CONTROL PLAN REVISIONS General Electric Company hereby submits revisions (dated 6/23/86) to the Fundamental Nuclear Material Control Plan (FNMCP) for the fuel fabrication facility in Wilmington, North Carolina. contains a descriptive listing of the changes made which do not require NRC approval prior to implementation, and contains the revised pages.

Pursuant to 10 CFR 2.790(d), General Electric requests this information be withheld from public disclosure as this material identifies General Electric procedures for safeguarding licensed special nuclear material.

Genera'l Electric personnel would be pleased to discuss this matter furtner with you and your staff as you may deem necessary.

Very truly yours, GENERAL ELECTRIC COMPANY M

T. Preston Winslow, Manager

' Licensing & Nuclear Materials Management M/C J88 TPW:bsd Attachments cc:

Director, ONMSS g.

e SGD-L a

E*J b

f pW**

vs 3\\)Sb p g.

0

]

8607160177 860623 3

/

'0[g 3

PDR ADOCK 0700 3

h' b

a > g v>

Q3vm

..,r

., 4 i