%e OPERATING DATA REPORT DOCKET HO. 50 - 352 y
DATE JUNE 15. 1986 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN e
ENGINEER.IN-CHARGE LICENSING SECTION HUCLEAR GENERATION DIVISION TELEPHONE (215) 641-502E OPERATING STATUS
- 1. UNIT NAME LIMERICK UNIT 1 l NOTES: UNIT 1 EXPERIENCED ONE l
l l
- 2. REPORTING PERIOct MAYe 1966 l
MANUAL SCRAM FOR I
l l
- 3. LICENSED THERMAL POWERIMWTil 3293 l
SURVEILLANCE TESTING. l l
l C. NAMEPLATE RATING (GROSS P94Els 1138 I
l l
l
- 5. DESIGH ELECTRICAL RATING (HET redEll 1955 l
l I
I
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS feitli 1992 l
l l
l
- 7. MAXIMUM DEPDCABLE CAPACITY (HET PSIEls 1055 l
1 j
- 8. IF CHANGES OCCUR IN CAPACITT RATINGS (ITEMS HUMBER 3 THROUGH 7) SINCE LAST REPORT, SIVE REASONSI
- 9. POWER LEVEL 70 letICH RESTRICTEDe IF ANY (HET P9dEls
'O. REASONS FOR RESTRICTIONSe IF ANYt THIS MONTH YR-TO-DATE CUMULATIVE
- 1. HOURS IN REPORTING PERICO 744 2.879 2.879
.t. HUMBER OF HOURS REACTOR WAS CRITICAL 43.6 2.157.7 2.157.7
- 3. REACTOR RESERVE SHUTD0604 HOURS 0.0 0.0 0.0 i
'4. HOURS SENERATOR OH-LINE 43.6 2.152.2 2.152.2
'5. UNIT RESERVE SHUTD0let HOURS 0.0 0.9 0.0
'6 SaOSS THERMAL ENERGY GENERATED (fleil 134.541 7.059.490 7.059.490 j
- 7. GROSS ELECTRICAL ENERGY SEHERATED (Ptoli 44.130 2.347,730 2,347.730
- 4. HET ELECTRICAL ENERGY SENERATED (Ptoll 39:087 tee 56.461 tee 54,861
- 19. Lei!T SERVICE FACTOR 5.9 74.4 74.8 8607160021 860531 PDR ADOCK 05000352 R
~
M.~
~ w,.w; =: n,
.~
- 3. UNIT AVAILABILITY FACTOR 5.9 7h8 74.8
- 1. UNIT CAPACITY FACTOR (USING M)C NET) 5.0 74.3 74.3 y 2. UNIT CAPACITY FACTOR (USING DER NET) 5.0 74.3 74.3
- 3. UNIT FORCED OUTACE RATE 0.0 1.2 1.2
- 4. SHUTD0be45 ECHEDULED DVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH)*
- 5. IF SHUTDobal AT EM3 OF REPORT PERIOD. ESTINATED DATE OF STARTUPt 6/15/86
- 6. UNITS IN TEST STATUS (PRIOR TO ComERCIAL OPERATION)*
FORECAST ACHIEVED INITIAL CRITICALITY 12/19/84 12/22/84 INITIAL ELECTRICITY MID APRIL 65 4/13/85 COMMERCIAL OPERATION IST QTR 86 2/01/86 V
6 Ne o
8
_~-
_ h g _& - - -_ w
___w
e AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 352 y
UNIT LINEAICK UNIT 1 1
DATE JUNE 15e 1966 i
COMPANY PHILADELPHIA ELECTRIC, COMPANY W.M.ALDEN ENGINEER-IN-CHARGE h
LICENSING SECTION MJCLEAR GENERATION DIVISION l
TELEPH0HE (215) 041-5022 l
'l
- DHTH MAY 1986 f
OAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL IPedE-NET 3 ItedE-NETI 1
104 17 0
1 005 10 0
3 0
19 0
V i
0
.0 0
5 0
21 0
6 0
tt 0
3 7
0 23 0
8 0
24 0
9 0
25 0
0 26 0
11 0
27 0
It 0
26 0
t 13 0
29 0
14 0
30 0
15 0
31 0
e 16 0
t 1
e UNIT SNUTDOINS AMA POWER REDUCTIONS DOCKET NO. 50 352 UNIT HAME LIMERICK UNIT 1 DATE JUNC 15. 1966 y
REPORT MONTH MAYe 1966 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY N.M.ALDEN ENGINEER.IN-CHARGE LICENSING SECTION NUCLEAR GENERATION DIVISION TELEPHONE t215) f41 5022
=........................................................................................................................
l l
l l
l METHOD OF l LICENSEE lSYSTEMICONPONENTl CAUSE AND CORRECTIVE l
ITYPElDURATIONlREASONISHUTTING 00WNl EVENT l CODE I CODE l ACTION TO C. l ' ATE I (131 (HOURSil (2) l REACTOR (3) l REPORT S l (4) l (5) l PREVENT RECURRENCE w...
1 I
I I
I i
i l
I 21 0502 1 5 1 700.4 l 5 l 2
l N/A l ZZ l ZZZZZZ l REQUIRED SURVEILLANCE TEST OUTAGE.
fI I
i ---.. I I
I I
I I
I I
I 70s.4 I I
I I
I i
1
)
'I (2)
(3)
(4) v 7I CEO REASON METH00 EXNIBIT G. INSTRUCTIONS h. *
- EDULED A. EQUIPMENT FAILURE (EXPLAIN) 1. MANUAL FOR PREPARATION OF DATA B. MAINTENANCE OR TEST 2 - MANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE C REFUELING 3 - AUTOMATIC SCRAM.
EVENT REPORT (LER)
)
D = REGULATORY RESTRICTION 4. OTHER (EXPLAIN)
FILE INUREG-0161)
E. OPERATOR TK\\INING + LICENSE EXAMINATION
,F - ADMINISTRATIVE (5)
G. OPERATIONAL ERROR (EXPLAIN)
H - OTHERIEXPLAIN)
EXNIBIT I. SAME SOURCE 4
9 e
i
=s
+
e 0
t
- --e
=
. ~ ~.:
m_.;
Docket No. 50-352 Attachment to Monthly Operating Report for May, 1986 Limerick Generating Station Unit 1 May 1 through May 31, 1986 I.
Narrative Summary of Operating Experiences The unit began the month at 100% power.
On May 2, the unit was manually shutdown for a six-week survaillance tecting program necessary to comply with NRC Technical Specifications.
Some maintenance and modification work is scheduled off critical path.
During the manual shutdown, reactor power gradually decreased until a manual scram was inserted at 301 power.
An unplanned challenge to the Reactor Protection System, resulting in a scram with the unit shutdown, occurred during a level transient when the reactor water level dropped below'the scram setpoint.
Reactor water level was immediately restored and the scram was reset.
The plant achieved hot shutdown at 0611 hours0.00707 days <br />0.17 hours <br />0.00101 weeks <br />2.324855e-4 months <br /> on May 3 and the unit was placed in shutdown cooling on the same day.
c The outage work is centered on Locil Leak Rate Testing, Diesel Generator Modifications & Testing, Main Steam Relief Valve change outs, snubber testing and modifications to the Standby Gas Treatment. System, j
Major activities completed during May associated with the surveillance testing and maintenance outage consisted of the following:
all diesel surveillance testing and 4 KV i
, logic system functional testing, replacement of the Main I
Control Room chlorine detectors, flushing of the floor and equipment drain sumps throughout the plant, and preliminary modifications to the EVAC system to, provide the refueling floor with the Standby Gas Treatment System capability required for reactor refueling.
The Main Control Room chlorine detector replacement began on May 2.
The replacement of existing detectors with an Anacon model is an attempt to reduce the number of spurious chlorine isolations which have resulted from failure of the existing detectors.
E
~ - - -
Docket No. 50-352 Attachment to Monthly Operating Report for May, 1986 The unit ended the month shutdown with performance of system check-off lists in progress, The unit is scheduled to return to service June 15.
II.
Challenges to Main Steam Safety Relief Valves During the month, there were no challenges to the main steam safety-relief valves.
e 6
l l
e 3
90
~
t i
4 l
cc: Troy B. Conner, Jr., Esq.
Arut P. Hodgdon, Esq.
,t Mr. Frank R. Romano
[
Mr. Robert L. Anthony Ms. Phyllis Zitzer Charles W. Elliott, Esq.
Barry M. Hartman, Esq.
Mr. Thomas Gerusky Director, Penna. Emergency Management Agency l
Angus Love, Esq.
David Wersan, Esq.
'j Robert J. Sugarman, Esq.
{j Kathryn S. Lewis, Esq.
~
Spence W.. Perry, Esq.
j, Jay M. Gutierrez, Esq.
Atomic Safety 4 Licensing Appeal Board i
Atomic Safety 4 Licensing Board Panel Docket 4 Service Section Pl E..M. Kelly L
Timothy R. S. Campbell E
r!
Ll t
t
- \\
C
'e k
l-
.\\
- l IR
- i.
e '1
~
8 t.
I t
- ~
e
(
l 5
~ ~ _.. -
- ~
.,, _ ~...- n
~ K:
RELh1EDGotu L rp yg g a.
46 PHILADELPHIA ELECTRIC COMPANY 23ol MARKET STREET P.O. BOX 8699 TfD PHILADELPHI A. PA.191o1 (2151841 4000 j
k k*-f ff h'$
Docket No.' 50-352 CL 00h'((Tf[3EUdIAT<Y BR, hcf'Y
~~
Director Office of Resource Management US Nuclear Regulatory Commission Washington, DC 20555
SUBJECT:
Limerick Generating Station Monthly Operating Report Gentlemen:
l Enclosed is the monthly operating report for Limerick Unit 1 for the month of May, 1986, forwarded pursuant to Technical Specification 6.9.1.6.
Very trul y
s, ye -
R. H. Logue Superintendent Nuclear Services l
Attachment cc:
Director, Office of Inspection & Enforcement, USNRC (12 copies)
Dr. T. E. Murley, NRC E. M. Kelly, Senior Resident Site Inspector Mr. David E. Ney, PA Dept. of Envir. Resources Mr. P. A. Ross, NRC (2 copies)
INPO Records Center See Attached Service List I