Text
m, O 'av t
GENuclearEnergy Gef'eralEkstne Concany W
hilectros Nuclear Center i
6705 Vallsvias Rwd Sunal. CA 94586 January 21,1999 n
.b N
Director, Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, D.C. 20555 1
References:
- 1. License SNM-960, Docket 70-754.
- 2. Letter Request for Revision to SNM 960, B. M. Murray to Michael F. Weber, dated July 9,1998.
- 3. Request for AdditionalInformation for Changes to Appendices A & B (TAC I
No. L31098), Charles E. Gaskin to Ben M. Murray, dated October 22,1998.
- 4. Reply to Request for AdditionalInformation for Changes to Appendices A & B (TAC No. L31098), B. M. Murray to Charles E. Gaskin, dated November 20,1998.
- 5. Docket 70-754," Safety Evaluation Report: Application Dated April 21,1989, Revision Dated December 9,1992, and Supplement December 8,1993, Re Renewal", United States Nuclear Regulatory Commission, February 7,1994.
l l Gentlemen:
l The General Electric Company, Vallecitos Nuclear Center (VNC) requests the renewal of License SNM-960. Revisions to the License Conditions (Appendix A) and Demonstration for Special Nuclear Material License Renewal for the Vallecitos Nuclear Center (Appendix B) were submitted and clarified in references 2 and 4. These revisions reflect the current operations and facilities at the VNC.
4 The Safety Evaluation Report (SER) [Ref. 5], with minor changes, is an accurate representation of the limits, controls, precautions, and potential hazards associated with VNC operations. The changes to the SER include:
/
'l.
Eliminate the e.xception to the maximum preset alarm point of 20 millirems per hour for the criticality monitor (item 2 in license condition S-7).
' 2.
Add the three violations to the compliance history:
a)
Inspection 70-754/94-02, Dec. 20,1994:
g (g
i)
Failure to perform sufficient air sampling for respirator use in the hot cell radiation locks.
ii)
Failure to provide annual training of firemen and bomb search teams.
.. b)
Inspection 70-754/96-01, June 19,1996:
i)
Failure to maintain HEPA filtering systems at the required 99.95 percent efliciency rating.
n400W 9902040166 9901'21 "
PDR ADOCK 07000754 C
PDRi
y m; UENRd January 21,1999 A consolidation of organizations in the Vallecitos & Morris Operations was recently implemented and is displayed in the enclosed revision to the organization chart on Page 2-14 of Appendix B, Figure 2.1. "Vallecitos Nuclear Center Administrative Organization Chart". This change combined the Radioactive Materials Services (RMS), the Remote llandling Operation (RHO), and the Engineering Projects components into a single components named Engineering and Materials Services.
If you or your staff have any questions concerning this application, please contact me at
-(925) 862-4455. Thank you.
Very truly yours, AN B. M. Murray Senior Licensing Engineer.
Enclosure
~(Six copies to NRC) cc:
W. L. Britz, Fuel Cycle Inspector U. S. NRC, Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, Texas ~ 76011-8064
O
~-
s g
G
~Q 3
GENERAL ELECTRIC COMPANY
.p.
f GE POWER SYSTEMS
&o GE NUCLEAR ENERGY 9
R
%a VNC - - - - - - - - - - -
,d!
VALLECITOS & MORRIS FUEL NUCLEAR 2
OPERATIONS ENGINEERING SERVICES A
g MATERIALS CHEMICAL ^
TECHNOLO N TECHNOLOGY PRODUCS &
PRODUC &
P MARKETING NTR*
R
- SERVICES SERVICES E
N N
3
[
g
- V&MO OPERATING COMPONENTS a
a hE REGULATORY FAC ENGINEERING &
COMPLIANCE MAINT.*
MATERIAL SERVICES
- FIGURE 2.1. VALLECITOS NUCLEAR CENTER ADMINISTRATIVE ORGANIZATION CHART y
t (Components shown below the dotted line are located at VNC)
-