Forwards List of Ref Matl to Be Furnished by Util in Order to Conduct Requalification Exams During Wk of 860915.Ref Matl Should Be Provided by 860804
ML20202F383
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 07/10/1986
From: Hehl C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
References
NUDOCS 8607150155
Download: ML20202F383 (3)


Text

__ . . . . . . _ - .- - .- .- - -

1 ..

l

\

JUL 10 1986 Docket No. 50-254 Docket No. 50-265 Comonwealth Edison Company ATT : Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690

Dear Mr. Reed:

SUBJECT:

REQUALIFICATION PROGRAM EVALUATION In a telephone conversation between Mr. W. Graham, Principal Instructor, and '

Mr. D. Hills, NRC Region III Examiner, arrangements were made for an evaluation of the requalification program at the Quad Cities Nuclear Power Station. The evaluation visit is scheduled for the week of September 15, 1986. ,

1

' " Tui this visit, the NRC examiner will administer NRC-prepared written and oral examinations. When the NRC examiner arrives at the site, he will meet with the appropriate facility personnel to review the schedule for those examinations. I For the examiner to adequately prepare for this visit, it will be necessary for '

the facility to furnish the approved reference material listed in Enclosure 1,

" Reference Material Requirements for Requalification Program Evaluations," by August 4, 1986. Mr. W. Graham has been advised of our reference material requirements and where they are to be sent.

This request for informaticn was approved by the Office of Management and Budget under Clearance Number 3150-0101, which expires May 31, 1989. Comments on burden and duplication may be directed to the Office of Management and Budget, Reports Managerrent Room 3208, New Executive Office Building, Washington, D. C. 20503.

Thank you for your consideration in this matter. If you have any questions on the evaluation process, please contact D. Hills at 312-790-5600.

Sincerely, 1

8607150155 860710 ,.J mi C. U. H hl PDR ADOCK 05000254 MT"hm O,' "

V PDR Charles W. Hehl, Chief Operations Branch

Enclosure:

As stated 4

See Attached Distribution Ves RIII RIII RIII RIII DEA 7)oyc Hills /mab RQ BurdiSk

f. '

Boyd f

Hehl 07/10/86 7/fo Ik\

SFV3

l Commonwealth Edison Company 2 JUL 10 $36 l l

l l

l Distribution  ;

1 cc w/ enclosure; {

D. L. Farrar, Director of Nuclear Licensing R. L. Bax, Station Manager J. Neal, Training Manager )

DCS/RSB (RIDS)

Licensing Fee Management Branch Resident Inspector, RIII .

Phyllis Dunton, Attorney l General's Office, Environmental Control Division l l

cc w/o enclosure:

R. B. Bevan, Project Manager, NRR B. A. Boger, Branco Chief, OLB l

, 6.

J ENCLOSURE 1 REFERENCE MATERIAL REQUIREMENTS FOR REQUALIFICATION PROGRAM EVALUATION

1. All administrative procedures (as applicable to reactor operation or

- safety)

2. All integrated plant procedures (normal or general operating procedures)
3. Emergency procedures (emergency instructions, abnormal, or special procedures)
4. Standing orders (important orders which are safety-related to and may supersede the regular procedures)
5. Fuel-handling and core-loading procedures (initial core-loading procedure, when appropriate)
6. Annunciator procedures (alarm procedures, including set points)
7. Radiation protection manual (radiation centrol mar.ual or procedures) i 8. Emergency plan
9. Technical Specifications
10. Lesson plans (training manuals, plant orientation manual, systems

, descriptions)

11. Systems operating procedures
12. Piping and instrumentation diagrams, electrical single-line diagrams, or flow diagrams
13. Copies of facility R0 and SR0 requalification examinations administered during the past 2 years
14. An index of administrative, operating, abnormal and eaergency procedures
15. Plant technical data (curve) book All of the above referenced material should be approved, final issues and should be so marked. Uncontrolled, preliminary, or other such issues will not be acceptable. All procedures and reference material should be bound or in the form used by the control room operators, with appropriate indexes or tables of contents to ensure efficient use. ,