Forwards Insp Repts 50-272/86-07 & 50-311/86-07 on 860224-28 & Notice of Violation.Steps Taken to Correct Violation Noted in Verified
ML20202F119
Person / Time
Site: Salem  PSEG icon.png
Issue date: 04/07/1986
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Corbin McNeil
Public Service Enterprise Group
Shared Package
ML20202F124 List:
References
NUDOCS 8604140107
Download: ML20202F119 (2)


See also: IR 05000272/1986007

Text

g-

+ -

d

APR 7 1986

Docket Nos. 50-272 License Nos. DPR-70

50-311 DPR-75

Public Service Electric and Gas Company

ATTN: Mr. Corbin A. McNeill, Jr.

Vice President - Nuclear

P. O. Box 236

Hancocks Bridge, New Jersey 08038

Gentlemen:

Subject: Inspection Report Nos. 50-272/86-07 and 50-311/86-07

This refers to the routine inspection conducted by Mr. K. Manoly of this office

on February 24-28, 1986 of activities at the Salem Nuclear Generating Station

Unit 1 and 2 authorized by NRC License Nos. DPR-70 and DPR-75 and to the dis-

cussions of our findings held by K. Manoly with R. Patwell- of your staff at the.

conclusion of the inspection, and to a subsequent telephone discussion between

Mr. J. Wiggins and Mr. J. Zupko on March 4,1986.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective exambations of procedures and representative

records, interviews with personnel, ...a observations by the inspector.

l Our inspector also verified the steps you have taken to correct the violation

'

brought to your attention in the enclosure to our letter dated April 9, 1984.

We have no further questions regarding your action at this time.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation, enclosed herewith as Appendix A. This violation has been

categorized by severity level in accordance with the revised NRC Enforcement

'

Policy (10 CFR 2, Appendix C) published in the Federal Register Notice (49 FR

8583) dated March 8, 1984. You are required to respond to this letter. In

preparing your response, you should follow the instructions in Appendix A, and

!.

'

also indicate your assessment of the design control measures which led to the

use of design procedures that were not adequately verified prior to performing

evaluations of safety related pipe support systems. .

The responses directed by this letter and the accompanying Notice are not

j subject to the clearance procedures of the Office of Management and Budget

[ as required by the Paperwork Reduction Act of 1980, PL 96-511.

l

ts604140107 860407 2

PDR ADOCK 0500

G

l

'

OFFICIAL RECORD COPY CIR SALEM 86-07 - 0001.0.0

04/03/86

[E - C l

di

. .

.--

'

_. Public Service Electric and Gas Co. 2

-Your cooperation with us in this matter is appreciated.

Sincerely,

Origi::al Signed By:

Jacque P. Durr

Stewart D. Ebneter, Director

Division of Reactor Safety

Enclosure: Appendix A Notice of Violation

cc w/ encl:

J. M. Zupko, Jr., General Manager - Salem Operations

B. A. Preston, Manager, Licensing and Regulation

C. P. Johnson, Manager - Quality Assurance Nuclear Operations

General Manager - Nuclear Safety Review

M. J. Wetterhahn, Esquire

R. Fryling, Jr. , Esquire

Public Document Room (PDR) '

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Jersey

bec w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

, DRP Section Chief

L. Norrholm, DRP, Section Chief, #2P8

l

RI:DRS I:DRS

b

RI:DRS

l Manoly/ca Wiggins Durr

'

w niu ,p *

OFFICIAL RECORD COPY CIR SALEM 86-07 - 0002.0.0

03/21/86

,

<