ML20202F119
| ML20202F119 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 04/07/1986 |
| From: | Ebneter S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Corbin McNeil Public Service Enterprise Group |
| Shared Package | |
| ML20202F124 | List: |
| References | |
| NUDOCS 8604140107 | |
| Download: ML20202F119 (2) | |
See also: IR 05000272/1986007
Text
g-
+
-
d
APR
7 1986
Docket Nos.
50-272
License Nos. DPR-70
50-311
Public Service Electric and Gas Company
ATTN: Mr. Corbin A. McNeill, Jr.
Vice President - Nuclear
P. O. Box 236
Hancocks Bridge, New Jersey 08038
Gentlemen:
Subject:
Inspection Report Nos. 50-272/86-07 and 50-311/86-07
This refers to the routine inspection conducted by Mr. K. Manoly of this office
on February 24-28, 1986 of activities at the Salem Nuclear Generating Station
Unit 1 and 2 authorized by NRC License Nos. DPR-70 and DPR-75 and to the dis-
cussions of our findings held by K. Manoly with R. Patwell- of your staff at the.
conclusion of the inspection, and to a subsequent telephone discussion between
Mr. J. Wiggins and Mr. J. Zupko on March 4,1986.
Areas examined during this inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter. Within these areas, the
inspection consisted of selective exambations of procedures and representative
records, interviews with personnel,
...a observations by the inspector.
l
Our inspector also verified the steps you have taken to correct the violation
'
brought to your attention in the enclosure to our letter dated April 9, 1984.
We have no further questions regarding your action at this time.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
This violation has been
categorized by severity level in accordance with the revised NRC Enforcement
Policy (10 CFR 2, Appendix C) published in the Federal Register Notice (49 FR
'
8583) dated March 8, 1984. You are required to respond to this letter.
In
preparing your response, you should follow the instructions in Appendix A, and
!.
also indicate your assessment of the design control measures which led to the
'
use of design procedures that were not adequately verified prior to performing
evaluations of safety related pipe support systems.
.
The responses directed by this letter and the accompanying Notice are not
j
subject to the clearance procedures of the Office of Management and Budget
[
as required by the Paperwork Reduction Act of 1980, PL 96-511.
l
ts604140107 860407
ADOCK 0500
2
G
l
OFFICIAL RECORD COPY
CIR SALEM 86-07 - 0001.0.0
'
04/03/86
[E - C l
di
-
-
- -
-
.
.
-
-
-
- -
-
-
-
..
.
.
.--
'
Public Service Electric and Gas Co.
2
_.
-Your cooperation with us in this matter is appreciated.
Sincerely,
Origi::al Signed By:
Jacque P. Durr
Stewart D. Ebneter, Director
Division of Reactor Safety
Enclosure: Appendix A Notice of Violation
cc w/ encl:
J. M. Zupko, Jr., General Manager - Salem Operations
B. A. Preston, Manager, Licensing and Regulation
C. P. Johnson, Manager - Quality Assurance Nuclear Operations
General Manager - Nuclear Safety Review
M. J. Wetterhahn, Esquire
R. Fryling, Jr. , Esquire
Public Document Room (PDR)
Local Public Document Room (LPDR)
'
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New Jersey
bec w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
DRP Section Chief
,
l
L. Norrholm, DRP, Section Chief, #2P8
b
RI:DRS
I:DRS
RI:DRS
l
Manoly/ca
Wiggins
Durr
'
w niu ,p
OFFICIAL RECORD COPY
CIR SALEM 86-07 - 0002.0.0
03/21/86
,
<