Advises of Planned Insp Effort Resulting from Licensee Plant Performance Review.Details of Insp Plan for Next 8 Months Encl
ML20202F111
Person / Time
Site: Pilgrim
Issue date: 11/26/1997
From: Conte R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Olivier L
BOSTON EDISON CO.
References
NUDOCS 9712090014
Download: ML20202F111 (4)


Text

-

4 t

November 26, 1997 Mr. Leon J. Olivier Vice President - Nuclear Boston Edison Company Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, Massachusetts 02360-5599

SUBJECT:

PLANT PERFORMANCE REVIEW (PPR) - PILGRIM On October 22,1997, the NRC staff completed the semlannual Plant Performance Review (PPR) of Pilgrim. The staff conducts these reviews for all operating nuclear power plants to develop an integreted understanding of safety performance. The results are used by NRC management to facilitate planning and allocation of inspection resources. The PPR for Pilgrim involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period April 1,1997 to October 1,1997. PPRs provide NRC management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) anr! senior management meeting (SMM) reviews.

This letter advises you of our planned inspection effort resulting from the Pilgrim PPR review. It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to De resolved in advance of inepector arrival onsite. The enclosure details our inspection plan for the next 8 months. Reaident inspections are not listed due to their ongoing and continuous nature.

We willinform you of any changes to the inspection plan. If you have any questions, please contact me at (610) 337-5183.

Sincerely, Original Signed By:

Richard J. Conte, Chief Reactor Projects Branch 8

- Division of Reactor Projects Docket Nos. 50-293

> hl

Enclosure:

Inspection Plan 1

\\

/1 80028 I5lO,5,lt$llll 9712090014 971126 PDR ADOCK 05000293 G

PDR g

I Mr. E. Thomas Boulette, Ph.D 2

cc w/ encl:

R. Ledgett, Executive Vice President - Operations t

C. Goddard, Plant Department Manager N. Desmond, Regulatory Relations D. Tarantino, Nuclear Information Manager R. Hallisey, Department of Public Health, Commonwealth of Massachusetts The Honorable Therese Murray The Honorable Joseph Gallitano B. Abbanat, Depadment of Public Utilities

- Chairman, Plymouth Board of Selectmen Chairman, Duxbury Board of Selectmen Chairman, Nuclear Matters Committee Plymouth Civil Defense Director 4

- P. Gromer, Massachusetts Secretary of Energy Resources

- J. Miller, Senior issues Manager

' J. Fleming A. Nogee, MASSPIRG Office of the Commissioner, Massachusetts Department of Environmental Quality Engineering Of' ice of the Attorney General, Commonwealth of Massachusetts T. Rapone, Massachusetts Executive Office of Public Safety Chairman, Citizens Urging Responsible Energy Commonwealth of Massachusetts, SLO Designse I

,r-r

--~

4 I

Mr. E. Thomas Boulette, Ph.D 3

~ Distribution w/ench Region i Docket Room (with concurrences)

Nuclear Safety Information Center (NSIC)

PUBLIC

, NRC Resident inspector DRS Director, Region l DRS Deputy Director, Region 1 DRS Branch Chiefs, Region i DRP Director, Region I -

DRP Deputy Director, Region i DRP Branch Chiefs, Region i E. Conner, DRP M. Oprendek, DRP C. O'Daniell, DRP -

L i

i Distribution w/enet (VIA E MAIL):

R. Eaton, NRR A. Wang, NRR K. Kennedy, OEDO R. Correia, NRR F. Talbot, NRR '

DOCDESK Inspection Program Branch, NRR (IPAS)

DOCUMENT NAME: G:\\ BRANCH 8\\PPR\\PG11971r.PPR To receive a copy of this document, Indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy OFFICE Rl/DRP l

Rl/DRP

,l j NAME EConner fQ(jp RConte M/

DATE 11/ /97 f //7,Cf11pg7977

' C OFFICIAL RECORD COPY J

.c e,

I PILGRIM INSPECTlON PLAN 1

INSPECTION TITLE / PROGRAM AREA PUWENED DATES INSPECTION TYPE / COMMENTS -

ll Tl 2515/109 Engineenng MOV Testing - GL 89-10 Temporary instructen 12 7

IP 37001.

Engineenng 10 CFR 50.59 Safety Evaluaton 1/20/98 Core inspection RI92303 Engmeeting Followup of AE Inspection 1/20/98 Pegenal ineconve IP 93801/93809 Engeneering SSFI Focusmg on AE issues - Team 1/20/98 Regional Irwaanve..

IP 81700-1 Physical Secunty Program 3/2/98 Core inspection J

)

IP 83724 Extemal Exposure Control and Dosimetry 3/23/98

' Core inspecnon IP 62706 -

Mamtenance Ri4e inspecten 4/27/98 Core inspecten pp=.ees Evaluaten se m W W am @ M h hy 6/ M 8

-IP 81700-2 Core inspecten 11/2/98 I

IP 86750 Radioactive Waste Transportation 6/22/98 Core inspection t

IP 86750 Solid Radweste Management & Trans Rad Monitoring 6/22/98 Core inspecten I

IP 84750-2 Radioactive Effluent and Environmental Monitoring 8/10/98 Core inspecten IP 83750 Occupational Radetson Exposure 10/5/98' Core inspecten IP64704 Fire Protection Program 11/2/98 Core inspecten IP 82701 Emergency Preparedness Program 10/19/98

. Core Inspecten l

IP 37550/40500 Engmeering/ Problem Resolution Team 10/12/98 Core tw

[

Legend:

IP ' - Inspection Procedure l

' Ti - Temporary Instruction Core inspection

. Minimum NRC Inspection Program j

(mandatory at all plants) l Regional Initiative - Additional Inspection Effort Planned by Region I 1

l 1

r

.... _.. ~.

.... -