e4 e

VIHotNIA ELECTRIC ANI) Powna COMPANY Hicstwoxn,Vinotw1A 20201 February 4, 1998 i

United States Noclear Regulatory Commission _

Serial No.

98 015 Attention: Document Control Desk NL&OS/ETS Washington, D.C. 20555

. Docket No.

50 338 50-339 License No. NPF-4 NPF-7

Dear Sir:

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 ANNUAL STEAM GENERATOR TUBE INSERVICE INSPECTION

SUMMARY

REPORT Pursuant to Technical Specifications 6.9.1.5.b for North Anna Units 1 and 2, Virginia Electric. and Power Company is submitting the steam generator tube inservice inspections performed during 1997. There were no steam generator tube inspections.

conducted on Unit 2 in 1997. The steam generator tube inspections conducted on Unit 1 during the Spring 1997 refueling outage are included in the attachment to this letter.

This letter does not establish any new commitments. Should you have any questions or require additional lnformation, please contact us.

Very truly yours,

[m (O

/-

(

vm

~~D J. H. McCarth)\\ng and Operations Support

, Manager Nuct'eafLicens Attachment cc:

U. S. Nuclear Regulatory Commission j

Region ll _

U 101 Marietta Street, N. W.

q Atlanta, Georgia 30323 1.. s v 0 i fkCl f

I Suite 2900 Mr. M. J. Morgan NRC Senior Desident inspector North Anna Power Station

)\\$ \\ \\$} !kkk g21jo $ $

o e

P

.<s.-

e

+-

ATTACHMENT 1 NORTH ANNA UNIT 1, MayT1997 RFO-

-. STEAM GENERATOR "A",' EDDY CURRENT EXAMINATION-

SUMMARY

In steam generator "A"

1804 tubes were inspected full length with bobbin-probes.- Three hundred-twenty,six tubes were also inspected

-at the hot leg " top _of-tubesheet" transition-with RPC probes.

No reportable indicationsf were revealed by' this ' inspection. There are_.-

.no plugged tubes in this steam-generator, p.y i