Text
_
DUKE POWER GOMPANY P.O. BOX 33189 CHARLOTTE, N.C. 28242 HAL B. TUCKER POM GNM vice Pmesment NLELE4m PRODUCTIOle July 2, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Nuclear Regulatory Comission Washington, D.C.
20555 ATTENTION:
Mr. B.J. Youngblood, Director PWR Project Directorate No. 4 1
i Re: Catawba Nuclear Station Docket Nos. 50-413 and 50-414 i
Dear Mr. Denton:
On June 24, 1985 we responded to the staff's request for additional information dated June 4,1985, concerning periodic maintenance of the Reactor Trip Breakers (Item 4.2.1 of Generic Letter 83-28).
The staff's position as stated in the June 4,1985 letter was that the peiodic maintenance program should include measurement and recording of breaker response time for the undervoltage trip on a refueling interval basis (or at 500 breaker operations, whichever comes first).
We regret that in the preparation of our response of June 24, 1985, which para-lleled that of the corresponding response for McGuire, we failed to note the differences between stations on this particular item. The frequency given in our response applies to McGuire's program. We do measure and record response times at Catawba, but on an every other month, staggered basis for each main breaker.
These measurements are also taken after the six month breaker maintenance rather than before and after.
Since the frequency of these measurements performed at Catawba greatly exceed that required by the staff in its position, the present program is considered adequate and no changes are required.
We have reexamined our submittal of June 24, 1985 for any other instances where l
y 8607110210 860702 Os
~~
PDR ADOCK 05000413 l
t lg P
PDR a
_ - _ _ _ _ _., _ - -, _. _ - _ _. _.. - _. _ ~ _. _ _, _ _ _ _. _., _. - _,, _.. _
- .s Mr. Harold R. Denton July 2, 1986 Page 2 the Catawba periodic maintenance program differs from that of McGuire and none were found.
Very truly yours, JMBLJ tw Hal B. Tucker LTP/06/jgm i
xc: NRC Resident Inspector Catawba Nuclear Station i