ML20202C025

From kanterella
Jump to navigation Jump to search
Forwards Corrected Monthly Operating Rept for Mar 1986. Initiation Date for Sixth Refueling Outage Should Be 860321 & Not 22
ML20202C025
Person / Time
Site: Salem PSEG icon.png
Issue date: 07/02/1986
From: Zupko J
Public Service Enterprise Group
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20202C030 List:
References
NUDOCS 8607110058
Download: ML20202C025 (1)


Text

,

O PSEG Public Service Electric and Gas Company P.O. Box E Hancocks Bridge, New Jersey 08038 Salem Generating Station July 2, 1986 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Sir:

MONTHLY OPERATING REPORT SALEM NO. 1 DOCKET NO. 50-272 The Monthly Operating Summary (required per Section 6.9 of the Salem Technical Specifications) for March 1986 was in error.

The initiation date for the Unit 1 sixth refueling outage should be Ma.ch 21, 1986 not March 22, 1986.

A corrected copy of the Operating Sua: mary is attached.

Sincerely yours, J.

Zupko, J General Manager - Salem Operations JR:sl cc:

Dr. Thomas E. Murley Regional Administrator USNRC Region I 631 Park Avenue King of Prussia, PA 19406 Director, Office of Management U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Enclosures 8-1-7.R4 8607110058 860702 PDR ADOCK 05000272 R

PDR I l The Energy People 35-2189 (11 Mi f 2 8/

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _