Forwards Insp Repts 50-454/97-24 & 50-455/97-24 on 971202-980112 & Nov.Violations Involved Failure to Control Transient Combustible Matl IAW Station Procedures & Were Identified by NRC
ML20202B961
Person / Time
Site: Byron  Constellation icon.png
Issue date: 02/03/1998
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kingsley O
COMMONWEALTH EDISON CO.
Shared Package
ML20202B965 List:
References
50-454-97-24, 50-455-97-24, NUDOCS 9802120132
Download: ML20202B961 (4)


See also: IR 05000454/1997024

Text

.

4.

( , UNITED STATES

/ja af og% NUCLEAR RETULATORY COMMDSION

8

REGION til

5 801 WARRENvlLLE ROAD

g LISLE. ILUNOIS 60532-4351

  • %

o...*

j February 3,1998

Mr. Oliver D. Kingsley

President, Nuoloar Generation Group

Commonwealth Edison Comosny

ATTN: Regulatory Services

'

Executive Towers West lll

1400 Opus Place, Suite 500

Downers Grove,IL 60515

SUBJECT: NOTICE OF V!Ot.ATION AND NRC INSPECTION REPORT

NO 50-454/97024(DRP); 50-455/97024(DRP)

Dear Mr. Kingsley

On January 12,1998, the NRC completed an inspection at your Byron 1 and 2 reactor facilities.

The enclosed report presents the inspection results.

During the inspection period, your conduct of activities at the Byron facility was generally

characterized by safety-conscious operations. Main control room activities were performed well,

including annunciator alarm response, communications between operators, and supervisory

oversight. Operators also maintained an awareness of activities that could influence the safety

of each unit. The large number of activities associated with the Unit i steam generator

replacement project did not impact Unit 2 operation. Your staff maintained easy access to

structures, systems and components for operators. Common area housekeeping was also good

with equipment appropriately staged or secured. Outage related material was property controlled

with the exception of two separate failures to control transient combustibles.

Based on results of this inspection, the NRC has determined that two violations of NRC

requirements occurred. The violations are cited in the enclosed Notice of Violation (Notice) and

the cltcumstances surrounding them are described in detailin the subject inspection report. Both

violations involved the failure to control tlansient combustible materialin accordance with station

procedures and were identified by the NRC. The violations are of concem because cor: trol of

combustible materialis a significant part of fire prevention and mitigation.

You are required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response. The NRC will use your response, in part, to

determine whether further enforcement action is necessary to ensure compliance with regulatory i

requirements. \

\

/

120008 \1A

/

I" ll. lll !! il!I ll ll

9002120132 980203

PDR ADOCK 05000454

0 PDR

_ _ _ _ _

_

.

O

O. Kingsley 2

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosurosc and your response will be placed in the NRC Public Document Room.

Sincerely,

/s/ M. L. Dapas for

Geoffrey E. Grant, Director,

Division of Reactor Projects

Docket Nos. 50-454; 50-455

License Nos. NPr 37; NPF-66

Enclosures: 1. Notice of Violation

2. Inspection 3eport

, No. 50 454/97024(DRP);

50 455/97024(DRP)

cc w/ encl.: M. Wallace, Nuclear Services

S9nlor Vice President

G. Stanley, PER Vice President

J. Perry, BAR Vice President

D. Fairer, Regulatory

Services Manager

1. Johnson, Licensing Director

DID Licensing

K. Grassler, Site Vice President

K. Kofron, Station Manager

D. Brindle, Regulatory Assurance

Supervisor

Richard Hubbard

Nathan Schloss, Economist

Office of the Attomey General

State Liaison Officer a

State Liaison Officer, Wisconsin

Chairman, Illinois Commerce

Commission

DOCUMENT NAME: G:\BYRO\BYR97024.DRP SEE PREVIOUS CONCURRENCES

. ..py .: thi. enven.ni. in,me. . in ih. b. *c . c.py nhevi enuh nvend... t* nv. ace.

g,,...i c.py iih .ti.ch

OFFICE Rlli Rlli Rui Rill - 6 Rlli

NAME Tongualco Gardner Shear Jordan

Violation &

Sect F1.1

Sect RI.2 f [GrantM

,z

DATE Oli /98 01/ l98 01/ /98 01/36/98 M/5/98

OFFICIAL llECORD COPY

l

a .

,

.

O. Kingsley 2

I

In accordance with 10 CFR 2.790 of the NRC's ' Rules of Practice," a copy of this letter, its

enclosures, and your response will be placed in the NRC Public Document Room.

Sincere',,

Geoffrey E. Grant, Director,

Division of Reactor Projects

Docket Nos. 50-454; 50-455

License Nos. NPF 37; NPF46

Enclosures: 1. Notice of Violation

2. Inspection Report

No. 50-454/97024(DRP);

50-455/97024(DRP)

cc w/ encl: M. Wallace, Nuclear Services

Senior Vice President

G. Stanley, PWR Vice President

J. Perry, BWR Vice President

D. Farrar, Regt,latory

Services Manager

1. Johnson, Licensing Director

DCD - Licensing

K. Groosser, Site Vic.e f-resident

K. Kofron, Station Manager

D. Brindle, Regulatory Assurance

Supervisor

Richard Hubbard

Nathan Schloss, Economist

Office of the Attomey General

State Liaison Officer

State Liaison Officer, Wisconsin

Chairman, Illinois Commerce

Commission

DOCUMENT NAME: G:\BYR0\BYR97024.0RP

g, . ..n .i me ,w. e . w4. w ih. w. e . c.n ah.m .n=h, .v. w. r con eh .nwhenenVemb.we

,

OFFICE Rlli Rilg gqg Rlll Rlli Rlli

NAME Tongue dardNor Shear Jordan Grant

g Violation &

Sect F1.1

opp

SectHl.2

DATE 01%I98 01/)//98 01/h/98 Oil /98

OFFICIAL RECORD COPY

l

<

.

4

4

0. Kingsley 3-

.

i

Distribution:

Docket File w/encls DRP w/encls

PUBlic 1G01 w/encls TSS w/encls

A. Beach w/ encl DRS (2) w/encle

-

>

Deputy RA w/encls Rlli PRR w/encls

Rlli Enf. Coord, w/encls RAC1 (E Mall)

SRI Byron w/encle CAA1 (E Mall)

Project Mgr. NRR w/ enc!s DOCDESK (E Mail)

4

'I

.

4

1

-.--

,-w--- ,c-,y *- ,-g --mg,_ y-me,__ ,.w,., ,.,5 , , , _ ., _ . , , ,.9, , , - - --_w-.9 .,, ,_f.y7