Forwards Insp Repts 50-455/85-47,50-456/85-60 & 50-457/85-56 on 851118-22.No Violations Noted.Corrective Actions Being Implemented W/Certain Items Still Incomplete.Region III Will Follow Up Open Items
ML20202B851
Person / Time
Site: Byron, Braidwood, 05000000
Issue date: 04/02/1986
From: Grimes B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20202B855 List:
References
NUDOCS 8604110294
Download: ML20202B851 (5)


See also: IR 05000455/1985047

Text

_ _ _ _ _ _ _ _ _ _ _ _ _

l

,

-

s

o

UNITED STATES

.

~,

8

NUCLEAR REGULATORY COMMISSION

n

j;;

p

WASHINGTON, D. C. 20553

%,, ....../

APR 0 2 ;ggg

Docket Nos. 50-455, 50-456 & 50-457

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed, Vice President

P. O. Box 767

Chicago, IL 60690

Dear Mr. Reed:

SUBJECT:

INSPECTION REPORT 50-455/85-047, 50-456/85-060, 50-457/85-056,

DESIGN VCRIFICATION ACTIVITIES FOR BYRON 2 AND BRAIDWOOD 1 & 2.

This letter conveys the results of the implementation inspection of the design

verification activities on Byron 2 and Braidwood 1&2. The inspection was con-

ducted by NRC's Office of Inspection and Enforcement (I&E) from November 18

through November 22, 1985 at the offices of Sargent & Lundy Engineers (S&L) in

Chicago, Illinois. The NRC team was composed of personnel from I&E and con-

sultants.

The specific object of this inspection was to ensure that applicable corrective

actions from the Byron 1 Integrated Design Inspection (IDI) and the Independent

Design Reviews (IDRs) of Byron 1 and Clinton 1 are being correctly implemented

on Byron 2 and Braidwood 1&2.

The NRC team concludes that these corrective actions are being implemented cor-

rectly on Byron 2 and Braidwood 182. However, the implementation of certain

items, although proceeding satisfactorily, is not yet completed. The NRC Region

III office will follow up and close out the open items identified in the enclosed

report.

Sincerely,

' ,A

F

rian K. Grimes, Director

,

'

Division of Quality Assurance, Vendor,

l

and Technical Training Center Programs

Office of Inspection and Enforcement

i

Enclosure: As stated

l

cc: See attached

N

A

a

_

- _ _ -

i

.

.

.

'

.

-

,

,

.

0 2 B86

Docket Nos. 50-455, 50-456 & 50-457

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed, Vice President

P. O. Box 767

Chicago, IL 60690

Dear Mr. Reed:

SUBJECT:

INSPECTION REPORT 50-455/85-047, 50-456/86-060, 50-457/85-056,

DESIGN VERIFICATION ACTIVITIES FOR BYRON 2 AND BRAIDWOOD 1 & 2.

This letter conveys the results of the implementation inspection of the design

verification activities on Byron 2 and Braidwood 1&2. The inspection was con-

ducted by NRC's Office of Inspection and Enforcement (I&E) from November 18

through November 22, 1985 at the offices of Sargent & Lundy Engineers (S&L) in

Chicago, Illinois. The NRC team was composed of personnel from I&E and con-

sultants.

The specific object of this inspection was to ensure that applicable corrective

actions from the Byron 1 Integrated Design Inspection (IDI) and the Independent

Design Reviews (IDRs) of Byron 1 and Clinton 1 are being correctly implemented

on Byron 2 and Braidwood 1&2.

The NRC team concludes that these corrective actions are being implemented cor-

rectly on Byron 2 and Braidwood 1&2.

However, the implementation of certain

items; although proceeding satisfactorily, is not yet completed. The NRC Region

III office will follow up and close out the open items identified in the enclosed

report.

Sincerely,

,

Originei ngnd DI

,

.

Brian K. Grimes, Director

Divisio'n of Quality Assurance, Vendor,

'

and Technical Training Center Programs

Office of Inspection and Enforcement

Enclosure: As stated

cc:

See attached

Distribution:

PDR

HJMiller, IE

JStevens, NRR

QAB Reading

DCS

GTAnkrum, IE

JMuffit, RIII

DQAVT Reading

JMTaylor, IE

EVImbro, IE

DDanielson, RIII

LPDR

RHVollmer, IE HBWang, IE

EGGreenman, RIII

JMilhoan, NRR

, BKGrimes, IE

VNoonan, IE

L01shan, NRR

  • SEE PREVIOUS PAGE FOR CONCURRENCE

/

  • QAB:DQAVT:IE *QAB:DQAVT:IE *C:QAB:DQAVT:IE

DD:D KVT:IE

D

A :IE

HBWang

EVImbro

GTAnkrum

HJ 11er

r

s

03/ /86

03/ /86

03/ /86

/ /86

Oqt / /86

_ _ _ _ _ _ _ _ _ _ _ _ _

.

.

.

.

-

.

,

'

Docket Nos. 50-455, 50-456 & 50-457

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed, Vice President

l

P. O. Box 767

Chicago, IL 60690

1

Dear Mr. Reed:

l

SUBJECT:

INSPECTION REPORT 50-455/85-047, 50-456/85-060, 50-457/85-056,

DESIGN VERIFICATION ACTIVITIES FOR BYRON 2 AND BRAIDWOOD 1 & 2.

This letter conveys the results of the implementation inspection of the design

verification activities on Byron 2 and Braidwood 1&2.

The inspection was con-

ducted by NRC's Office of Inspection and Enforcement (I&E) from November 18

through November 22, 1985 at the offices of Sargent & Lundy Engineers (S&L) in

Chicago, Illinois. The NRC team was composed of personnel from I&E and con-

sultants.

The specific object of this inspection was to ensure that applicable corrective

actions from the Byron 1 Integrated Design Inspection (IDI) and the Independent

l

3

Design Reviews (IDRs) of Byron 1 and Clinton 1 are being correctly implemented

!

on Byron 2 and Braidwood 1&2.

The NRC team concludes that these corrective actions are being implemented cor-

rectly on Byron 2 and Braidwood 1&2. However, the implementation of certain

items, although proceeding satisfactorily, is not yet completed.

The Office of

Inspection and Enforcement has requested that Region III follow-up and close-out

any open items identified in the attached report.

Sincerely,

Brian K. Grimes, Director

Division of Quality Assurance, Vendor,

,

and Technical Training Center Programs

.

Office of Inspection and Enforcement

cc:

See attached

Distribution:

PDR

HJMiller, IE

JStevens, NRR

QAB Reading

DCS

GTAnkrum, IE

JMuffit, RIII

DQAVT Reading

JMTaylor, IE

EVImbro, IE

  • DDanielson, RIII

LPDR

RHVollmer, IE HBWang, IE

EGGreenman, RIII

BKGrimes, IE

VNoonan, IE

L01shan, NRR

  • telephone concurrence

/

I

.

Q

Q

QAB:DQAVT:IE h

DQAVT:IE

DD:DQAVT:IE

DD:0QAVT:IE

-

H ang

EVImbro

GT

um

HJMiller

BKGrimes

03{ff/86

/03/A/86

0

86

03/ /86

03/ /86

.

.

.

'

.

,

.

.

,

'

Mr. Cordell Reed

Commonwealth Edison Company

Byron /Braidwood

cc:

Mr. William Kortier

Dr. Bruce von Zellen

Atomic Power Distribution

Department of Biological Sciences

Westinghouse Electric Corporation

Northern Illinois University

Post Office Box 355

DeKalb, Illinois 61107

Pittsburgh, Pennsylvania 15230

Joseph Gallo Esq.

U. S. Nuclear Regulatory Commission

Isham, Lincoln & Beale

Byron / Resident Inspectors Office

1120 Connecticut Ave., N. W.

4448 Gerwen Church Road

Suite 840

Byron, Illinois 61010

Washington, D. C. 20036

Ms. Diane Chavez

C. Allen Bock, Esquire

528 Gregory Street

Post Office Box 342

Rockford, Illinois 61108

Urbana, Illinois 61801

Mrs. Phillip B. Johnson

Thomas J. Gordon, Esquire

1907 Stratford Lane

Waaler, Evans & Gordon

Rockford, Illinois 61107

2503 S. Neil

Champaign, Illinois 61820

Douglass Cassel, Esq.

109 N. Dearborn Street

'

Ms. Bridget Little Rorem

Suite 1300

Appleseed Coordinator

Chicago, Illinois 60602

117 North Linden Street

Essex, Illinois 60935

Ms. Pat Morrison

5568 Thunderidge Drive

Mr. Edward R. Crass

Rockford, Illinois 61107

Nuclear Safeguards and Licensing

Division

David C. Thomas, Esq.

Sargent & Lundy Engineers

77 S. Wacker Drive

55 East Monroe Street

Chicago, Illinois 60601

i

Chicago, Illinois 60603

Elena Z. Kezelis, Esq.

U. S. Nuclear Regulatory Commission

Isham, Lincoln & Beale

,

Resident Inspectors Office

Three First National Plaza

'

RR#1, Box 79

Suite 5200

Braceville, Illinois 60407

Chicago, Illinois 60602

l

l

.__

_

_ _

.

. - _ .

_ . _ _ -

. _ . . . _ , _ _ _ _ - _ . . . . _ , . . . . . - _ . . , _ . _ , _ , _ , _ . _ . _ . _ _ - . , .

.

.

.

'

.

,

i

-

,

'

2-

Byron /Braidwood

'

-

cc:

Regional Administrator

U. S. NRC, Region III

799 Roosevalt Road

Glen Ellyn, Illinois 60137

Erie Jones, Director

Illinois Emergency Services

and Disaster Agency

110 East Adams

Springfield, Illirois 62705

Ms. Lorraine Creek

Rt.1, Box 182

Manteno Illinois 60950

Mr. Michael C. Parker, Chief

Division of Engineering

-

Illinois Department of

Nuclear Safety

1035 Outer Park Drive

Springfield, Illinois 62704

Michael Miller

Isham, Lincoln & Beale

One First National Plaza

42nd Floor

Chicago, Illinois 60603

Jane M. Whicher, Esq.

109 N. Dearborn Street

Chicago, Illinois 60602

.

.

..,,n..

,.--.---w.-

--- - < . . . .

.,.a

-e--

+, . , - . , -

,,,e,

--,

.n.

,.v..

-,,

e

a

,,