Text
_ _ _ _ _ _ _ _ _ _ _ _ _
l
,
-
s
o
UNITED STATES
.
~,
8
NUCLEAR REGULATORY COMMISSION
n
j;;
p
WASHINGTON, D. C. 20553
%,, ....../
APR 0 2 ;ggg
Docket Nos. 50-455, 50-456 & 50-457
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed, Vice President
P. O. Box 767
Chicago, IL 60690
Dear Mr. Reed:
SUBJECT:
INSPECTION REPORT 50-455/85-047, 50-456/85-060, 50-457/85-056,
DESIGN VCRIFICATION ACTIVITIES FOR BYRON 2 AND BRAIDWOOD 1 & 2.
This letter conveys the results of the implementation inspection of the design
verification activities on Byron 2 and Braidwood 1&2. The inspection was con-
ducted by NRC's Office of Inspection and Enforcement (I&E) from November 18
through November 22, 1985 at the offices of Sargent & Lundy Engineers (S&L) in
Chicago, Illinois. The NRC team was composed of personnel from I&E and con-
sultants.
The specific object of this inspection was to ensure that applicable corrective
actions from the Byron 1 Integrated Design Inspection (IDI) and the Independent
Design Reviews (IDRs) of Byron 1 and Clinton 1 are being correctly implemented
on Byron 2 and Braidwood 1&2.
The NRC team concludes that these corrective actions are being implemented cor-
rectly on Byron 2 and Braidwood 182. However, the implementation of certain
items, although proceeding satisfactorily, is not yet completed. The NRC Region
III office will follow up and close out the open items identified in the enclosed
report.
Sincerely,
' ,A
F
rian K. Grimes, Director
,
'
Division of Quality Assurance, Vendor,
l
and Technical Training Center Programs
Office of Inspection and Enforcement
i
Enclosure: As stated
l
cc: See attached
N
A
a
_
- _ _ -
i
.
.
.
'
.
-
,
,
.
0 2 B86
Docket Nos. 50-455, 50-456 & 50-457
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed, Vice President
P. O. Box 767
Chicago, IL 60690
Dear Mr. Reed:
SUBJECT:
INSPECTION REPORT 50-455/85-047, 50-456/86-060, 50-457/85-056,
DESIGN VERIFICATION ACTIVITIES FOR BYRON 2 AND BRAIDWOOD 1 & 2.
This letter conveys the results of the implementation inspection of the design
verification activities on Byron 2 and Braidwood 1&2. The inspection was con-
ducted by NRC's Office of Inspection and Enforcement (I&E) from November 18
through November 22, 1985 at the offices of Sargent & Lundy Engineers (S&L) in
Chicago, Illinois. The NRC team was composed of personnel from I&E and con-
sultants.
The specific object of this inspection was to ensure that applicable corrective
actions from the Byron 1 Integrated Design Inspection (IDI) and the Independent
Design Reviews (IDRs) of Byron 1 and Clinton 1 are being correctly implemented
on Byron 2 and Braidwood 1&2.
The NRC team concludes that these corrective actions are being implemented cor-
rectly on Byron 2 and Braidwood 1&2.
However, the implementation of certain
items; although proceeding satisfactorily, is not yet completed. The NRC Region
III office will follow up and close out the open items identified in the enclosed
report.
Sincerely,
,
Originei ngnd DI
,
.
Brian K. Grimes, Director
Divisio'n of Quality Assurance, Vendor,
'
and Technical Training Center Programs
Office of Inspection and Enforcement
Enclosure: As stated
cc:
See attached
Distribution:
HJMiller, IE
JStevens, NRR
QAB Reading
GTAnkrum, IE
JMuffit, RIII
DQAVT Reading
JMTaylor, IE
EVImbro, IE
DDanielson, RIII
LPDR
EGGreenman, RIII
JMilhoan, NRR
, BKGrimes, IE
VNoonan, IE
L01shan, NRR
- SEE PREVIOUS PAGE FOR CONCURRENCE
/
- QAB:DQAVT:IE *QAB:DQAVT:IE *C:QAB:DQAVT:IE
DD:D KVT:IE
D
A :IE
HBWang
EVImbro
GTAnkrum
HJ 11er
r
s
03/ /86
03/ /86
03/ /86
/ /86
Oqt / /86
_ _ _ _ _ _ _ _ _ _ _ _ _
.
.
.
.
-
.
,
'
Docket Nos. 50-455, 50-456 & 50-457
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed, Vice President
l
P. O. Box 767
Chicago, IL 60690
1
Dear Mr. Reed:
l
SUBJECT:
INSPECTION REPORT 50-455/85-047, 50-456/85-060, 50-457/85-056,
DESIGN VERIFICATION ACTIVITIES FOR BYRON 2 AND BRAIDWOOD 1 & 2.
This letter conveys the results of the implementation inspection of the design
verification activities on Byron 2 and Braidwood 1&2.
The inspection was con-
ducted by NRC's Office of Inspection and Enforcement (I&E) from November 18
through November 22, 1985 at the offices of Sargent & Lundy Engineers (S&L) in
Chicago, Illinois. The NRC team was composed of personnel from I&E and con-
sultants.
The specific object of this inspection was to ensure that applicable corrective
actions from the Byron 1 Integrated Design Inspection (IDI) and the Independent
l
3
Design Reviews (IDRs) of Byron 1 and Clinton 1 are being correctly implemented
!
on Byron 2 and Braidwood 1&2.
The NRC team concludes that these corrective actions are being implemented cor-
rectly on Byron 2 and Braidwood 1&2. However, the implementation of certain
items, although proceeding satisfactorily, is not yet completed.
The Office of
Inspection and Enforcement has requested that Region III follow-up and close-out
any open items identified in the attached report.
Sincerely,
Brian K. Grimes, Director
Division of Quality Assurance, Vendor,
,
and Technical Training Center Programs
.
Office of Inspection and Enforcement
cc:
See attached
Distribution:
HJMiller, IE
JStevens, NRR
QAB Reading
GTAnkrum, IE
JMuffit, RIII
DQAVT Reading
JMTaylor, IE
EVImbro, IE
- DDanielson, RIII
LPDR
EGGreenman, RIII
BKGrimes, IE
VNoonan, IE
L01shan, NRR
- telephone concurrence
/
I
.
Q
Q
QAB:DQAVT:IE h
DQAVT:IE
DD:DQAVT:IE
DD:0QAVT:IE
-
H ang
EVImbro
GT
um
HJMiller
BKGrimes
03{ff/86
/03/A/86
0
86
03/ /86
03/ /86
.
.
.
'
.
,
.
.
,
'
Mr. Cordell Reed
Commonwealth Edison Company
Byron /Braidwood
cc:
Mr. William Kortier
Dr. Bruce von Zellen
Atomic Power Distribution
Department of Biological Sciences
Westinghouse Electric Corporation
Northern Illinois University
Post Office Box 355
DeKalb, Illinois 61107
Pittsburgh, Pennsylvania 15230
Joseph Gallo Esq.
U. S. Nuclear Regulatory Commission
Isham, Lincoln & Beale
Byron / Resident Inspectors Office
1120 Connecticut Ave., N. W.
4448 Gerwen Church Road
Suite 840
Byron, Illinois 61010
Washington, D. C. 20036
Ms. Diane Chavez
C. Allen Bock, Esquire
528 Gregory Street
Post Office Box 342
Rockford, Illinois 61108
Urbana, Illinois 61801
Mrs. Phillip B. Johnson
Thomas J. Gordon, Esquire
1907 Stratford Lane
Waaler, Evans & Gordon
Rockford, Illinois 61107
2503 S. Neil
Champaign, Illinois 61820
Douglass Cassel, Esq.
109 N. Dearborn Street
'
Ms. Bridget Little Rorem
Suite 1300
Appleseed Coordinator
Chicago, Illinois 60602
117 North Linden Street
Essex, Illinois 60935
Ms. Pat Morrison
5568 Thunderidge Drive
Mr. Edward R. Crass
Rockford, Illinois 61107
Nuclear Safeguards and Licensing
Division
David C. Thomas, Esq.
Sargent & Lundy Engineers
77 S. Wacker Drive
55 East Monroe Street
Chicago, Illinois 60601
i
Chicago, Illinois 60603
Elena Z. Kezelis, Esq.
U. S. Nuclear Regulatory Commission
Isham, Lincoln & Beale
,
Resident Inspectors Office
Three First National Plaza
'
RR#1, Box 79
Suite 5200
Braceville, Illinois 60407
Chicago, Illinois 60602
l
l
.__
_
_ _
.
. - _ .
_ . _ _ -
. _ . . . _ , _ _ _ _ - _ . . . . _ , . . . . . - _ . . , _ . _ , _ , _ , _ . _ . _ . _ _ - . , .
.
.
.
'
.
,
i
-
,
'
2-
Byron /Braidwood
'
-
cc:
Regional Administrator
U. S. NRC, Region III
799 Roosevalt Road
Glen Ellyn, Illinois 60137
Erie Jones, Director
Illinois Emergency Services
and Disaster Agency
110 East Adams
Springfield, Illirois 62705
Ms. Lorraine Creek
Rt.1, Box 182
Manteno Illinois 60950
Mr. Michael C. Parker, Chief
Division of Engineering
-
Illinois Department of
Nuclear Safety
1035 Outer Park Drive
Springfield, Illinois 62704
Michael Miller
Isham, Lincoln & Beale
One First National Plaza
42nd Floor
Chicago, Illinois 60603
Jane M. Whicher, Esq.
109 N. Dearborn Street
Chicago, Illinois 60602
.
.
..,,n..
,.--.---w.-
--- - < . . . .
.,.a
-e--
+, . , - . , -
,,,e,
--,
.n.
,.v..
-,,
e
a
,,