ML20202B817

From kanterella
Jump to navigation Jump to search
Forwards Changed Pages 2.5-1 & 2.6-1 Describing Changes to Emergency Plan Section in Accordance w/860513 Telcon.Revised Pages VI & Vii,Reflecting Changes in Schedule of Revs & Rev Records,Respectively,Also Encl
ML20202B817
Person / Time
Site: Westinghouse
Issue date: 05/14/1986
From: Nardi A
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To: Bidinger G
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
27025, LA-86-42, NUDOCS 8607100423
Download: ML20202B817 (6)


Text

m 76-//5/

/

8 kETURN TO 396-SS

,j,,, %

(-

)

V pg RECEND 1'

Westinghouse Water Reactor S

MAY 2 91986 > b

$3,55p e e s230a3ss Electric Corporation Divisions u.s. NUCLEAR REGULAW couuission q

,s1

/

LA 86-42 k.4 M,

May 14, 1986 U. S. Nuclear Regulatory Commission Division of Fuel Cycle and Material Safety Office of Nuclear Material Safety and Safeguards Washington, DC 20555 Attention: Mr. G. H. Bidinger Mail Stop SS 396 Gentlemen:

Reference:

May 13, 1986 Telephone Conversation Between G. H. Bidinger (NRC) and E. K. Reitler (Westinghouse) Concerning Site Emergency Plan Attached are changed pages 2.5-1 and 2.6-1 describing changes to the Emergency Plan section in accordance with the above referenced telephone conversation.

Attached also are revised pages vi and viii reflecting changes in the Schedule of Revisions and Revision Record respectively.

If you have any questions concerning this submittal, please contact me at the above address or telephone (412) 246-6054.

Very truly yours, fhm -

L ~

[o r A. J. Nardi, Manager NES License Administration lb WP1065E:3p.1 b.

%g nocxam MAY 29 M

  • g uma g

7' t 3

,tg

{dE[sOlKC@!"f

~~

S umWon y

fds mu em i,

1ug 2 ~.

s EE"A808R 8988(f p

p7gpf

,2.4.2 Nonroutine and emergency operations involving SNM shall be performed only after the particular operation has been approved by the appropriate line management function and the Radiation Protection Component, consistent with the urgency of the situation in the event of an emergency.

All equipment specified as necessary to the operation by the line management function and radiation protection function shall be provided and operative.

2.4.3 A continuing program of surveillance, air sampling and smear sampling which is adequate to detect ventilation deficiencies and assure compliance with 10 CFR 20 limits, shall be conducted.

2.4.4 UF6 cylinders shall have valve covers in place when being moved except for those which have been processed and evacuated.

In the event that it is not practical to attach a valve cover to the cylinder, they may be transported without the valve covers provided that a supervisor or designee escort is provided (in addition to the individual operating the transport equipment), and the personnel involved with the transfers shall be knowledgeable in emegency actions to be taken in event of damage to the cylinder valve during the transfers.

2.4.5 Unless specifically exempted by license conditions, Westinghouse shall comply with the provisions of Title 10, Chapter 1, Code of Federal Regulations, Parts '

and 20.

2.4.6 A Site Physical Security Plan and implem

.ing procedures shall be maintained in accordance with 10 CF 73.67.

2.5 Emergency Plan Westinghouse shall implement,

maintain, and execute the response measures of the Radiological Contingency
Plan, submitted to the Commission on September 30,
1981, and supplemented on July 20, 1983, February 24, June 1, July 24, and September 11, 1984, and July 18, 1985.

Westinghouse shall also maintain implementing procedures for the Radiological Contingency Plan as necessary to implement the Plan.

This Radiological Contingency Plan and associated implementing procedures supersede the emergency planning requirements of 10 CFR 70.22(1) as they refer to onsite planning and notification procedures.

Westinghouse shall make no change in the Radiological Contingency Plan that would decrease the response offectiveness of the Plan without prior Commission approval as evidenced by a license amenoment.

Westinghouse may make changes to the Radiological Contingency Plan without prior Commission approval if the changes do not decrease the response effectiveness of the Plan. Westinghouse shall Docket No. 70-1151 Initial Submittal Date:

4/30/83 Page No.

2.5-1 License No. SNM-1107 Revision Submittal Date:

5/14/86 Revision No.

4

2.5 (Continued) furnish the Chief, Uranium Fuel Licensing Branch, Division of Fuel Cycle and Material Safety, NMSS, U. S. Nuclear Regulatory Commission, Washington, DC 20555, a report containing a description of each change within six months after the change is made.

2.6 Operating Procedures Special nuclear material processing shall be conducted in accordance with approved written procedures or instructions.

2.6.1 Adopting and Issuing Procedures 2.6.1.1 Safety-related procedures and procedural changes shall be issued and distributed by department managers in accordance with written policies, including preparation, review and applicable approvals.

Line managers shall be responsible for assuring that safety-related procedures are made available to appropriate personnel through posting of limits, training programs and other appropriate written or verbal notifications.

2.6.1.2 Radiation protection ano nuclear criticality safety parameters shall be incorporated into policies and procedures which are issued by the Radiation Protection Component, approved by the Plant Manager and distributed by line management to appropriate personnel and incorporated into applicable operating procedures.

Radiation Protection Component approvals are required for all safety-related procedures and changes involving the processing, handling,

storage, inspection or movement of special nuclear materials.

2.6.2 Procedure Reviews Document Review Frequency Operating Procedures As Required Regulatory Affairs Procedures Annual Health Physics Operating Procedures Annual Docket No. 70-1151 Initial Submittal Date:

4/30/83_

Page 60.

2. 6-1 License No. SNM-1107 Revision Submittal Date:

5/14/86 Revis)sn No.

4

SCHEDULE OF REVISIONS Page Revision Page Revision Number Number Number Number 2.1-5 2

2.3-19 2

2.2-1 2

2.3-20 2

2.2-2 2

2.4-1 3

2.2-3 3

2.5-1 4

2.2-4 3

2.6-1 4

2.2-5 3

2.7-1 3

2.2-6 2

2.7-2 3

2.2-7 2

2.7-3 2

2.2-8 2

2.7-4 2

2.2-9 2

2.7-5 2

2.2-10 2

2.7-6 2

2.2-11 2

3.0-1 2

2.3-1 2

3.1-1 2

2.3-2 2

3.1-2 2

2.3-3 3

3.1-3 2

2.3-4 2

3.1-4 2

2.3-5 2

3.1-5 2

2.3-6 2

3.1-6 2

2.3-7 2

3.1-7 2

2.3-8 2

3.1-8 2

2.3-9 2

3.1-9 2

2.3-10 3

3.1-10 2

2.3-11 2

3.1-11 2

2.3-12 2

3.1-12 3

2.3-13 2

3.2-1 2

2.3-14 2

3.2-2 2

2.3-15 3

3.2-3 2

2.3-16 deleted 3.2-4 3

2.3-17 2

3.2-5 2

2.3-18 2

3.2-6 2

Docket No. 70-1151 Initial Submittal Date:

4/30/83 Page No.

vi License No. StN-1107 Revision Submittal Date:

5/14/86 Revision No.

4

,' 3 REVISION RECORD Revision Date of Number Revision Paoes Revised Revision Reason 1

12/12/83 1.9-52 through 1.9-76 Respond to NRC questions inclusive, 2.2-10, in NRC letter dated 2.2-11, 2.3-1, 4.8-1 April 6, 1983.

2 3/26/84 All-pages-resubmitt'ed*

Respond to NRC questions

- -- as Revision-2.aSee in NRC letters dated

.. _ submittal. letter. '-

' January 26, 1984 and

. attachmenttfor de _..-.

February 23, 1984.

. sgription of changes,. -

kil;pagesresubmitt,ed, Respond to NRC 3

1/4/85 as Revis. ion J.

See re-questions.

' vision'~ lines in right'

~

hand columns of'each

. page,f_or. specific changes.

4 6/21/85 New pages 2.2-12 and Licensing of uranyl 2.2-13 and revised nitrate storage tanks.

pages 2.3.1 and 2.3.2.

Seerevi'sTo~nTinisli

~

at n,

  • ~ right' hand colLninsof~'

each page for specific changes.

5 5/14/86 2.5-1 and 2.6-1.

Update of Emergency Plan Section.

Docket No. 70-1151 Initial Submittal Date:

4/30/83 Page No.

viii License No. SNM-1107 Revision Submittal Date:

5/14/65 Revision No.

5

. o *,

l-l l-i L

(

t 1

l 28-// [/

DOCKET No.

CONTROL NO. N // M I DATE OF DOC.

O((/g(([,,

DATE RCVD.

BNMf/b FCUF PDR FCAF LPDR W

I&E REF.

WUR SAFEGUARDS FCTC' OnlER i

DESCRIPTIONt

/

/

4

.Kbe/ Luma 09i

/

/

l 6

6 Docket No.

7 D* D T0:

William 0. Miller, License Fee Management Branch

SUBJECT:

MATERIALS LICENSE AMENDMENT CLASSIFICATION APPLICANT:

W tstt9Ghovit S L(,cT Ltc Licer.se No:

60M \\so1 Fee Category:

Application Dated:

hM M, t i % f.

Received:

1.

The above application for amendment has been reviewed by NMSS/ REGIONAL OFFICE in accordance with 5170.31 of Part 170, and will require an amendment to the license.

2.

The application is not subject to fees because it was filed (a)

[

pursuant to written NRC request

'h

.1

..'t i ing-issued-for the raavenier.ce of-the ra-ission, or(b)

Other (State reason)

Signature O

Date T u W i. 1% li 6f.

e

,