ML20202B249
| ML20202B249 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 03/25/1986 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| ANPP-35659-EEVB, NUDOCS 8604110156 | |
| Download: ML20202B249 (1) | |
Text
.
2 Arizona Nuclear Power Project gg NR 2n /[f ff:
P O BOX 52034 e PHOENIX, AFil20NA 85072-2034
[7 v
ANPP-35659-EEVB/JRB-94.04 March 25, 1986 DifW V g;.
Mr. John B. Martin Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission - Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596
Subject:
Certification of the Operability of All Required Systems for Initial Entry Into Mode 3 File: 86-056-026
Reference:
PVNGS Unit 2 Operating License NPF-46
Dear Mr. Martin:
As required by the Palo Verde Nuclear Generating Unit 2 Operating License, NPF-46, I am hereby certifying that item 1.a of Attachment 1 to the license has been completed for the initial entry into Mode 3.
The operability of systems required for Mode 3 have been demonstrated by successfully meeting the acceptance criteria in the PVNGS Technical Specifications. This has been accomplished by the completion of the applicable surveillance tests or by pre-operational testing, which verifies the meeting requirements of the Technical Specifications and which were performed within the required surveillance interval or by operability as demonstrated for Modes 4, 5 and 6.
Very truly yours s
bd O Lll b
E. E. Van Brunt, Jr.
Executive Vice President Project Director EEVB/JRB/pc cc:
R. Zimmerman A. Gehr B604110156 860325 A
PDR ADOCK 05000529 V
P PDR ff-el