ML20202B249

From kanterella
Jump to navigation Jump to search
Certifies That Item 1.a of Attachment 1 to License NPF-46 Completed for Initial Entry Into Mode 3.Operability of Sys Required for Mode 3 Demonstrated by Completion of Applicable Surveillance Tests or by Preoperational Testing
ML20202B249
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 03/25/1986
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-35659-EEVB, NUDOCS 8604110156
Download: ML20202B249 (1)


Text

.

2 Arizona Nuclear Power Project gg NR 2n /[f ff:

P O BOX 52034 e PHOENIX, AFil20NA 85072-2034

[7 v

ANPP-35659-EEVB/JRB-94.04 March 25, 1986 DifW V g;.

Mr. John B. Martin Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission - Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596

Subject:

Certification of the Operability of All Required Systems for Initial Entry Into Mode 3 File: 86-056-026

Reference:

PVNGS Unit 2 Operating License NPF-46

Dear Mr. Martin:

As required by the Palo Verde Nuclear Generating Unit 2 Operating License, NPF-46, I am hereby certifying that item 1.a of Attachment 1 to the license has been completed for the initial entry into Mode 3.

The operability of systems required for Mode 3 have been demonstrated by successfully meeting the acceptance criteria in the PVNGS Technical Specifications. This has been accomplished by the completion of the applicable surveillance tests or by pre-operational testing, which verifies the meeting requirements of the Technical Specifications and which were performed within the required surveillance interval or by operability as demonstrated for Modes 4, 5 and 6.

Very truly yours s

bd O Lll b

E. E. Van Brunt, Jr.

Executive Vice President Project Director EEVB/JRB/pc cc:

R. Zimmerman A. Gehr B604110156 860325 A

PDR ADOCK 05000529 V

P PDR ff-el