-. _ . _ - - . _ ~ _ _ ~ - . - _ . - _ _ . - - . - - . . _ _.__ . -.

l l

2TYPP.I INSERVICE INSPECTION PLAN FOR THE FIAST TEN. YEAR. INTERVAL AT BEAVER VALLEY POWER STATION UNIT #2 RELIEF REQUEST EV2 Bl.11 1, REY.1

SUBJECT:

Reactor Vessel I.4wer Circumferential Weld (2 RCS-REV21-C-4)

Prepared by:

" ' ED8 Date: b ' I $~'I 7 Supenisor, Nuclear Programs Redewed by Date: '~' f!EF 77 Director, Design Basiging!'neering Reviewed by: Date:

ANil (/

Reviewed by: BV OSC-E97 Date: 9/10/97 OSC Reicwed by: kNt04Pt.CM9(btSuSe97-k Date #[24bT i

4 ORC Approval by: /I ,, . . .,~ Date: /C- ?- 9 )

Div, VP, Nuclear Operations / Plant Manager 9712030064 971124 PDR ADOCK 05000334i G. PDR i..

l

.. )

DUQUESNE LIGHT COMPANY i

Beaver Valley Power Station Unit No. 2 l

RELIEF REOUEST NO. BV2 Bl.11-1. Rev.1 l COMPONENT Reactor Vessel Lower Head Circumferential Weld (2RCS REV21-C-4)

DRAWING NO.

10080-ISI E !A ASME SECrlON XI REOUIREMElyT (83S83)

Item No. Bl.11 (IWB 25001, Category B.A) requires volumetric examination of essentially 100% of the weld length each 10 year interval. l BASIS OF RELig In accordance with 10CFR50.55a(g)(6)(i), reliefis requested on the basis that compliance with the Code requirement is impractical. The lower head to shell weld (2RCS-REV21-C-4) examination is limited due to the four core support lugs.

This weld was examined udng automated techniques during the 2R06 refueling outage. Over eighty nine percent (89%) of the require I volume was examined. The four lugs are welded to the inside surface of the reactor vesseljust above weld 1RCS REV21-C-4.

ASME XI defines " essentially 100%", as more than 90 percent of the examination volume. To obtain the l last 1% of the required volume would necessitate removal of one of the support lugs. Removal of a support lug for this purpose is considered impractical.

AJ '.ERNATIVE EXAMINATION

.he alternative to the examination requirement is to perform the examination to the maximum extent possible. This examination is supplemented by the visual examination performed on the interior of the vessel. The four support lugs are included in this examination. Therefore, the UT examination coupled with the visual examination of the support lugs and the surrounding areas provides an adequate measure of assurance of the integrity of this weld.

. - - - , - - - ,-. .-