ML20202A485

From kanterella
Jump to navigation Jump to search
NRR E-mail Capture - Acceptance Review for Application to Revise Technical Specifications 3.8.1, AC Sources-Operating
ML20202A485
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 07/20/2020
From: Joel Wiebe
NRC/NRR/DORL/LPL3
To: Simpson L
Exelon Generation Co
References
Download: ML20202A485 (2)


Text

From: Wiebe, Joel Sent: Monday, July 20, 2020 8:12 AM To: Lisa Simpson (Lisa.Simpson@exeloncorp.com)

Subject:

Acceptance Review for Application to Revise Technical Specifications 3.8.1, "AC Sources-Operating"

Lisa, By letter dated June 26, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20178A467), Exelon Generation Company, LLC submitted a license amendment request to modify TS 3.8.1, "AC Sources-Operating," to revise certain minimum and maximum voltage and frequency acceptance criteria for steady-state standby diesel generator surveillance testing. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed the submittal and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this request will take approximately 505 hours0.00584 days <br />0.14 hours <br />8.349868e-4 weeks <br />1.921525e-4 months <br /> to complete. The NRC staff expects to complete this review in approximately 12 months from the date of this acceptance, which is July 2021. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

If you have any questions, please contact me at (301) 415-6606.

Joel

Hearing Identifier: NRR_DRMA Email Number: 685 Mail Envelope Properties (MN2PR09MB3438BA4896E948B1A6807F378B7B0)

Subject:

Acceptance Review for Application to Revise Technical Specifications 3.8.1, "AC Sources-Operating" Sent Date: 7/20/2020 8:12:21 AM Received Date: 7/20/2020 8:12:00 AM From: Wiebe, Joel Created By: Joel.Wiebe@nrc.gov Recipients:

"Lisa Simpson (Lisa.Simpson@exeloncorp.com)" <Lisa.Simpson@exeloncorp.com>

Tracking Status: None Post Office: MN2PR09MB3438.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2358 7/20/2020 8:12:00 AM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: