ML20199M039
| ML20199M039 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 11/25/1997 |
| From: | Howell A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Ray H SOUTHERN CALIFORNIA EDISON CO. |
| Shared Package | |
| ML20199M043 | List: |
| References | |
| RTR-NUREG-0654, RTR-NUREG-654 50-361-97-21, NUDOCS 9712020178 | |
| Download: ML20199M039 (5) | |
See also: IR 05000361/1997021
Text
e
pt ** *'%r
UNIT E D ST ATES
y
f
.'t
NI%' LEAR REGULATORY COMMISSION
f.
k
nEcioN av
S
611 RY AN PLAZA DRIVE SulTE 400
%,
An LINoioN. T E x AS 76011 8064
"'
- * ' *
November 25, 1997
Harold B. Ray, Executive Vice President
' Southern California Edison Co.
San Onofre Nuclear Generating Station
P.O. Box 128
.
San Clemente, California 92674-0128
SUBJECT: NRC INSPECTION REPORT 50-361/97-21; 50-362/97-21
Dear Mr. Ray:
An NRC inspection was conducted October 27-31,1997, at your San Onofre Nuclear
Generating Station, Units 2 and 3 reactor facilities. The enclosed report presents the scope and
results of that inspection.
The inspection included implementation of your emergency plan and procedures during your
biennial emergency preparedness exercise. Overall, the performance dunng the biennial
exercise was satisfactory; however, one exercise weakness was identified. The exercise
weakness involved the failure to adequately monitor the habitability of the Operations Support
Center (OSC).
,
Exercise weaknesses, according to 10 CFR Part 50, Appendix E.IV.F.2.g, are inspection
1
findings that need to be corrected by the licensee. Therefore, you are requested to provide this
office with a description of your corrective measures and your schedule for completing these
actions within 30 days after receipt of this letter.
We noted that for this exercise, and during the 1995 evaluated exercise, the general emergency
occurred at noon. We recognize that the scenario events are typically coordinated to meet both
on-sita and off-site objectives. However, the predictability of the event timing could be viewed as
a disclosure of the scenario and could; therefore, detract from the training value of the exercise.
We raquest that you review your scenario development process to avoid repetitive times for
establishing general emergency conditions
During the exercise, we noted that Federal guidance concerning protective action
recommendations for severe core damage events had not been properly incorporated into the
emergency plan and implementing procedures. Supplement 3 to NUREG-0654, " Criteria for
Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in
Support of Nuclear Power Plants,"(published in July 1996) identified evacuation as the preferred
recommendation for severe core damage events. Your procedure still identified sheltering as
this initial general emergency protective action recommendation. Please note that your
protective action recommendations are inconsistent with NRC recommended actions.
Iri accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
f
enclosure will be placed in the NRC Public Documeat Room (PDR).
I
9712020178 971125
I
F DR
ADOCK 05000361
/
O
.PDR
.
,
.
..
-
,-
..- - ..._-
-.
--
._--
.
.
Southe , California Edison, Co.
2
Shou!d you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
"
/
-
Arthur T. Howell Ill, Director
Division of T3eactor Safety
Docket Nos.: 50-351; 50 362
License Nos.: NPF 10; NPF 15
Enclosure:
NRC Inspection Report
50-361/97-21; 50 362/97 21
cc w/ enclosure:
Chairman, Board of Supervisors
County of San Diego
1600 Pacific Highway, Room 335
San Diego, California 92101
Alan R. Watts, Esq.
Woodruff, Spradlin & Smart
701 S. Parker St. Suite 7000
Orange, California 92868-4720
Sherwin Harris, F
4rce Project Manager
Public Uhlities Det
nent
City o' Riverside
3900 Main Street
Riverside, California 92522
R. W. Krieger, Vice President
Southern California Edison Company
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente California 92674 0128
.
v.,
,- -
,
,
,,
- . ,
, , , - -
, , , . - . , - . -
v--
. _ .
- -
- _ . _ _
.
.
Southern California Edison, Co.
3
Stephen A. Woods, Senior Health Physicist
Division of Drinking Water and
Environmenta: Management
Nuclear Emergency Response Program
California Department of Health Services
P.O. Box 942732, M/S 396
Sacramento, California 94334 7320
Terry Winter, Manager
Power Operations
San Diego Gas & Electric Company
P O. Box 1831
San Diego, Califctnia 92112
Mr, Steve Hsu
Radiological Health Branch
State Department of Health Services
P.O. Box 042732
Sacramento, California 94234
Mayor
City of San Clemente
100 Avenida Presidio
San Clemente, California 92672
.e
Mr. Truman Bums \\Mr. Robert Kinoslan
California Public Utilities Commission
505 Van Ness, Rm. 4102
San Francisco, California 94102
Training. Exercises, & Evaluation
Branch Chief
FEMA Region IX
Building 105
Presidio of San Francisco
San Francisco, CA 94129
-.
.
, .-
._.----
r 4,l
j
-! g
j
f
,
l
w
. .
-4
j
Southem California Edison, Co.
<
F
.
E Mail report to T. Frye (TJF)
E-Mail report to T. Hiltz (TGH) .
l
E Mail report to NRR Event Tracking System (IPAS)
i
E Mail report to Document Control Desk (DOCDESK)-
bec to DCD (IE35)
!
- bec distrib. by RIV:.
I
Regional Administrator
SONGS Resident inspector
'
DRS Director
DRS Deputy Director
DRP Director .
DRS PSB (Murray)
Branch Chief (DRP/F, WCFO)
MIS System
Senior Project inspector (DRP/F, WCFO)
RIV File
Branch Chief (DRPfrSS)
M. Hammond (PAO, WCFO)
'
- WCFO File
C. A. Hackney, R3LO
G. M. Good, PSB
T. H. Andrews, PSB
.
DRS/PSB File (Hodges)
R. Azua, DRP
f'
D. Allen, RI
D. Kirsch, DRP/F (WCFO)
t
4
.
V
T
t
-
DOCUMENT NAME: G:\\ REPORTS \\SO721RP.THA
To receive copy of document. Indcate in best 'C" = Copy without enclosures *E"
Copy with enclosures *N' e No co_py
RIV;PSB
PSB
C:DRS/PSB
RI
DRP/TS -
CLRP/F
D:pM
'THAndrews:nh *GMGood 'BMurray
- nAllen
- RAzua
DKirschu.
ATF6WeiIll
"
11/- /97 -
11/ /97-
11//97
l11/ /97
11//97
11#/97 F
11M97
,
,
'Previously concurred.
OFFICIAL RECORD COPY
'
'
,
_
,
.
m
. ~ . .
. - ,
m m.
. . . , , , ~ , - , , -
, - . .
-.s.
- . . . _ . _ . , - _ _ _ . . _ , . . , . , . - -
- - , . _ . ~ . . ,
.~4
_ _ _ _ . - . _ _ . _ _ _ _ . _ - .
_
_ _ _ _ _ _ .._ .. _ . _ .
.
b
h
-
Southern California Edison, Co.
-4-
,
i
E Mail report to T. Frye (TJF)
,
E Mail report to T. Hiltz (TGH)
E Mail report to NRR Event Tracking System (IPAS)
E Mail report to Document Control Desk (DOCDESK)
bec to DCD (IE35)
'
bec distrib. by RIV:
Regional Administrator
SONGS Resident inspector
i
DRS Director
DRS Deputy Director
,
DRP Director
DRS PSB (Murray)
Branch Chief (DRP/F, WCFO)
MIS System
,
Senior Project inspector (DRP/F, WCFO)
RIV File
Branch Chief (DRP/TSS)
M. Hammond (PAO, WCFO)
WCFO File
C. A. Hackney, RSL.O
.'
G. M. Good, PSB
T. H. Andrews, PSB
DRS/PSB File (Hodges)
R. Azua, DRP
D. Allen, Rl
D. Kirsch, DRP/F (WCFO)
s
a
!
DOCUMENT NAME: G:\\ REPORTS \\SO721RP.THA
To receive copy of document, indcote in bos:'C' = Copy without enclosures *E' = Copy with enclosures *N" = No copy
l RIV.PSB
PSB-
C:DRS/PSB
RI
DRP/'S
C:DRP/F
D:p5KY
l *THAndrews:nh *GMGood *BMurray
'DAllen
- RAzua
DKirsch AWoMIIll
l 11/ /97
11/ /97
11//97
11//97
11//97
114/97F
11A797
- Previously concurred.
OFFICIAL RECORD COPY
,
-
r
- - -
. - - . - - - - - . . -
- .
- . . . - . . . - -
. - -