Forwards Amend 110 to License DPR-21 & Safety Evaluation. Amend Modifies Tech Specs Re Disarming Control Rods When Refuel Interlocks or Reactor Protection Sys Trip Functions Inoperable
ML20199L873
Person / Time
Site: Millstone Dominion icon.png
Issue date: 04/04/1986
From: Charemagne Grimes
Office of Nuclear Reactor Regulation
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20199L878 List:
References
NUDOCS 8604100465
Download: ML20199L873 (3)


Text

-

April - 4, 1986

\\

Docket No.: S0-245 DISTRIBUTION CDocketfilegACRS(10)

NRC PDR BGrimes SECY LJHarmon Mr. John F. Opeka, Senior Vice President JShea CMiles Nuclear Engineering and Operations PAnderson Local PDR Northeast Nuclear Energy Company FMiraglia JPartlow Post Office Box 270 OELD ISAP R/f Hartford, Connecticut 06141-0270 Gray File +4 EJordan DCrutchfield

Dear Mr. Opeka:

HLi

SUBJECT:

DISARMED CONTROL RODS Re:

Millstone Nuclear Power Station, Unit 1 The Comission has issued the enclosed Amendment No.110 to Provisional Operating License No. DPR-21 for Millstone Nuclear Power S.tation, Unit No. 1, in response to your application dated October 30, 1985.

The amendments would modify the wording in the technical specifications with respect to disarming control rods when the refuel interlocks or reactor protection system trip functions are inoperable. The change would be consistent

'with wording in the standard technical specifications. The proposed wording change, affecting technical specifications 3.10, 4.1.D, Table 3.1.1 and Bases 3.1, would allow flexibility in disarming control rods by allowing a variety of disarming methods, where any one method would be sufficient to ensure that the control rods remain fully inserted.

A Notice of Consideration of Issuance of Amendment to License and Proposed No Significant Hazards Consideration Determination and Opportunity for Hearing related to the requested action was published in the Federal Register on February 26, 1986 (51 FR 6827 ).

No comments or requests for hearing were received.

l A copy of the Safety Evaluation is enclosed. The notice of issuance will be included in the Comission's next bi-weekly Federal Register notice.

Sincerely, Original signed by: C. I. Grimes Christopher I. Grimes, Director 8604100465 860404 Integrated Safety Assessment PDR ADOCK 05000245 Project Directorate P

PDR Division of PWR Licensing - B

Enclosures:

As Stated cc w/ enclosures:

See nex page

[

ISAP:

-B IS B

D:ISAP:DPL-B y

JShea:mn pan on CGrimes c mand.

02/q/86 02/

86 0'gS/86

/g /86

.~.. -.. -

o o =.

og UNITED STATES g

NUCLEAR REGULATORY COMMISSION r.

j wAssancrow. o. c. rosss

\\.....o#

April 3,1986 Docket No.: 50-245 Mr. John F. Opeka, Senior Vice President Nuclear Engineering and Operations Northeast Nuclear Energy Company Post Office Box 270 Hartford, Cor.aecticut 06141-0270

Dear Mr. Opeka:

SUBJECT:

DISARMED CONTROL RODS

^

Re:

Millstone Nuclear, Power Station, Unit 1 The Comissien has issued the enclosed Amendment No.110 to Provisional Operating License No. DPR-21 for Millstone Nuclear P'ower Station, Unit No. 1, in response to your application dated-October 30, 1985.

The amendments would modify the wording in the technical specifications with respect to disarming control rods when the refuel interlocks or reactor protection system trip functions are inoperable. The change would be consistent with wording in the standard technical specifications. The proposed wording change, affecting technical specifications 3.10, 4.1.0, Table 3.1.1 and Bases 3.1, would allow flexibility in disanning control rods by allowing a variety of disarming methods, where any one method would be sufficient to ensure that the control rods remain fully inserted.

A Notice of Consideration of Issuance of Amendment to License and Proposed No Significant Hazards Consideration Determination and Opportunity for Hearing related to the requested action was published in the Federal Register on February 26, 1986 (51 FR 6827). No comments or requests for hearing were received.

A copy of tne Safety Evaluation is enclosed. The notice of issuance will be j

included in the Comission's next bi-weekly Federal Register notice.

Sincerely, W

W Christopher I. Grimes, Director Integrated Safety Assessment Project Directorate Division of PWR Licensing - B

Enclosures:

i As Stated cc w/ enclosures:

See next page L

~

Mr. John F. Opeka Millstor,e Nuclear Power Station Northeast Nuclear Energy Company Unit No. I cc:

Gerald Garfield, Esquire Kevin McCarthy, Director Day, Berry & Howard Radiation Control Unit Counselors at Law Department of Environmental City Place Protection Hartford, Connecticut 06103-3499 State Office Building Hartford, Connecticut 06106 Edward J. Mroczka Vice President, Nuclear Operations Richard M. Kacich, Supervisor Northeast Utilities Service Company Operating Nuclear Plant Licensing Post Office Box 270 Northeast Utilities Service Company Hartford, Connecticut 06141-0270 Post Office Box 270 Hartford, Connecticut 06141-0270 State of Connecticut Office of Policy and Management ATTN: Under Secretary Energy Division 80 Washington Street Hartford, Connecticut 06106 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 Northeast Nuclear Energy Company ATTN: Superintendent Millstone Nuclear Power Station P. O. Box 128

.Waterford, Connecticut 06385 Resident Inspector c/o U.S. NRC Millstone Nuclear Power Station' P. O. Box 811 Niantic, Connecticut 06357 First Selectman of the Town of Waterford Hall of Records 200 Boston Post Road Waterford, Connecticut 06385

-- _