r p 23 N MEMORANDUM FOR: DPWR-A Branch Chiefs 2

FROM:

Charles E. Rossi, Assistant Director Division of PWR Licensing - A

SUBJECT:

TOPICAL REPORT REVIEWS The Assistant Directors within each Licensing Division now have signature authority for topical report reviews. Thus, the procedures for managing a topical report within our division.have changed. This memo outlines the new procedure to be used and provides guidance.

Topical reports will initially be received by TOSB for processing. A TAC number will be assigned and the report will be forwarded to the appropriate division. For DPL-A, Ed Weinkam will then process and forward a Licensing Work Request Form to the appropriate Branch through the Assistant Director.

TOSB is currently developing a " form" letter for proprietary determination and to identify the staff reviewer responsible for the particular topical.

This letter will be forwarded to the topical report applicant, once a reviewer is assigned, under my signature. When this form letter is complete, it will be made available to you. Requests for additional information which evolve from the review will be forwarded to the topical report applicant under-the review branch chief's signature.

Upon completion of your review, each branch will prepare a safety evaluation report for the topical report along with a transmittal letter for my signature. Enclosure 1 is a " form" transmittal letter to be used for topicals. The SER should be written in a " formal" manner, i.e., use "the staff finds" as opposed to "we find." The title block should be of the following form:

Safety Evaluation of Topical Report (report number)

(Title)

In addition, following completion of the topical report review, each Branch Chief must notify the Planning and Resource Analysis Branch (PRAB) in order that review fees can be determined and assessed.- Enclosure 2 is an example of the forwarding memo to be utilized along with a filled out version of the form to be sent. This information should be prepared at the time that the topical

$p?//

ic/

j

- ~

t DPWR-A Branch Chiefs.

JUN 2 31986-report review is completed. However, this memorandum should not be forwarded to PRAB until after the topical report has been signed out in ordeF to assure all review fees are collected.

Orlej=1 elsr:dby',

  • Charles E. Rossi, Assistent' Director Division of PWR Licensing \\ -A

Enclosures:

As Stated cc:

R. Emch PWR-A Section Leaders T. Novak H. Thompson DISTRIBUTION 7_4, t;'Gentreiffles J-NRC PDR AD RF TNovak EWeinkam DPLA RF RDiggs, LFMS REmch, PPAS a

p/

DPLA EWei am: csp CERossi 6/

/86 6/g86 A

A w

g J er

,ep-w

-et-z---

ENCLOSURE 1

~

Mr. Gary M. Ward, Manager, Reload Licensing i

Exxon Nuclear Company 2101 Horn Rapids Road Richland, Washington 99352

Dear Mr. Ward:

SUBJECT:

ACCEPTANCE FOR REFERENCING 0F LICENSING TOPICAL REPORT The Nuclear Regulatory Commission (NRC) staff has completed its review of the Topical Report We find the report to be acceptable for referencing in license applications to the extent specified and under the limitations delineated in the report and the associated NRC evaluation, which is enclosed. The evaluation defines the basis for acceptance of the report.

We do not intend to repeat our review of the matters described in the report and found acceptable when the report appears as a reference in license applications, except to assure that the material presented is applicable to the specific plant involved. Our acceptance applies only to the matters described in the report.

In accordance with procedures established in NUREG-0390, it is requested that publish an accepted version of this report within three monthes of receipt of this letter.

The accepted version shall incorporate this letter and the enclosed evaluation after the title page.

The accepted version shall include an -A (designating accepted) following the report identification symbol.

i i

I CONTACT:

l I.

1

-.i

Gary M. Ward -

Should our criteria or regulations change such that our conclusions as to the acceptability of the report are invalidated, and/or the applicants referencing the topical report will be expected to revise and resubmit their respective documentation, or submit justification for the continued effective applicability of the topical report without revision of their respective documentation.

Sincerely, Charles E. Rossi, Assistant Director Division of PWR Licensing - A Office of Nuclear Reactor Regulation

Enclosure:

Safety Evaluation

I l

1 ENCLOSURE 2 MEMORANDUM FOR:

Lars Solander, Chief Planning and Resource Analysis Branch Office of Nuclear Reactor Regulation FROM:

Cecil 0. Thomas, Chief Reactor Systems Branch Division of PWR Licensing-B

SUBJECT:

DATA FOR FEES ON COMPLETED TOPICAL REPORT BAW-Enclosed is information for your use in determining the fee to be assessed for the review of the following topical report:

BAW-1893,

" Basis For Raising Arming Threshold for Anticipatory Reactor Trip on Turbine Trip."

Cecil 0. Thomas, Chief Reactor Systems Branch Division of PWR Li ensing-8 j

Enclosure:

As stated DISTRIBUTION i

Central File NRC POR Branch RF Division Director AD/PWR-A, PWR-B, or BWR Technical Assistant for the Division Division R/F R. Diggs, LFMS REmch, PPAS Other distribution deemed appropriate by the originator, stions on these letters should be directed to Hazel Smith (x

DPLB-B:RSB :DPL-B:RSB:S

._:___________:____________L:DPL B:RSB:BC :DPL-B:AD._____________:___________

i i

DFieno:Jc :NLauben

.___________________________CThomas

DCrutchfield: -____________:____________________
06/ /86
06/ /86
06/ /86
06/ /86 0FFICIAL RECORD COPY 1,

9

DATA FOR FEES ON COMPLETED TOPICAL REPORTS 1.

APPLICANT:

B&W Owners Group 2.

REPORT NUMBER:

BAW-1893 3.

REPORT TITLE:

Basis for Raising Arming Threshold for Anticipatory Reactor Trip on Turbine Trip 4.

REPORT DATE:

October 1985 5.

START DATE OF REVIEW:

February 1986 6.

COMPLETION DATE OF REVIEW:

April'25, 1986 7.

MANPOWER ACTIVITY CODE:

1417 8.

TACS NUMBER:

60115 A.

B&R (if applicable)

N/A B.

FIN NOS. (if applicable)

N/A C.

TOTAL PROGRAM SUPPORT D0LLARS ASSIGNABLE TO THIS REPORT:

N/A 9.

NAME OF TOPICAL REPORT MANAGER / EXTENSION:

C. Miller, x27066 i

10. NAME AND ADDRESS OF COMPANY TO BE BILLED:

B&W Owners Group i

D. Fieno, x27742, stated that no c/o Babcock & Wilcox Company contractor was used during this review.

__3315 Old Forest Road Post Office Box 1260 Lynchburg, VA 24505-1260

11. NAME AND PHONE NUMBER OF CONTACT PERSON AT COMPANY:

J. H. Taylor (804-385-2817)

-