November 19, 1997 4
b Mr. Leon R. Elisson Chief Nuclear Officer and President Nuclear Business Unit Public Service Electric & Gas Company Post Office Box 236 Hancocks Bridge, New Jersev 08038
SUBJECT:
SENIOR REACTOR AND REACTOR INITIAL EXAMINATIONS
Dear Mr. Eliason:
In a telephone conversation on October 15,1997, between Mr. B. Havens and Mr. Don Florek, arrangements were made for the administration of licensing examinations at the Hope Creek facility during the weeks of February 9 and February 16,1998.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Interim Revison 8, NUREG-1021, " Operator Licensing Examination Standards for Power Reactors." The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by December 8,1997. Tne written examinations, operating tests, and the supporting reference materials identified in Attachment 2 of ES-201 will be due by January 5,1998. Any delay in receiving the required examination, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled, in order to conduct the requested written ereminations and operating tests,it will be necessary for your staff to provide adequate space and accommodations in accordance with ES 402, and to make the simulation facility available on the dates notes above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
fy~
Appendix E of N'JREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
h, %
To permit timely WRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications [ Office of Management and Budget (OMB) approval number 3150-0090], medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
9712O20019 971119 PDR ADOCK 05000354
[ll@llQll]l]lll]l V
.,....c i
. =
..-. _ =..- _-- -
Mr. Leon R. Eliason 2
1 This letter contains information collections that are submit to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0101, which expires on April 30, 2000.
The public reporting burden for this collection of information is estimated to average 500 Sours per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on ar.y aspect of this collection of information, includin0 suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at BJS1@NRC. GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
Thank you for your cooperation in this matter. 'Mr. Havens has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Don Florek at (610)337-5185, or me at (610) 337 5211.
Sincerely, j.
e i
i Glenn W. Meyer, Chief Operator Licensing and Human Performance Branch Division of Reactor Safety Docket No. 50-354 1
l l
l
-= -
8-r
.~
~.. _ - _.
7.
9 Mr. Leon R. Eliason 3
cc:
' L. Storz, Senior Vice President - Nuclear. Operations E. Simpson, Senior Vice President - Nuclear Engineering E. Salowitz, Director - Nuclear Business Support A. F. Kirby, Ill, External Operations - Nuclear, Delmarva Power & Light Co.
J. A.' Isabella, Manager, Joint Generation Atlantic Electric M..Berilla, General Manager -_ Hope Creek Operations
'J. McMahon, Director - Quality Assurance & Nuclear Safety Review D. Powell, Manager - Licensing and Regulation R. Xankus, Joint Owner Affairs A. C. Tapert, Prc, gram Administrator Jeffrey J. Keenan, Esquire Consumer Advocate, Office of Consumer Advocate William Conklin, Public Safoty Consultant, Lower Alloways Creek Township i
State of New Jersey-State of Delaware i
A
(
I m.
.. _ ~ _.. _ _ _ _ - _.. _ _..
l l
Mr. Leon R. Eliason 4
Distribution:
Region 1 Docket Room (with concurrences)
- C. O'Daniell, DRP W. Axelson, DRA (irs) 1 J. Linville, DRP j
- b. Barber, DRP L. Harrison, DRP Nuclear Safety Information Center (NSIC) i NRC Resident inspector PUBLIC K.' Kennedy, OEDO D. Jaffe, Project Manager, NRR
Inspection Program Branch, NRR (IPAS)
P. Correia, NRR i
F. Talbot, NRR DOCDESK OL Facility File DRS File DOCUMENT NAME:- A;\\HCINIT.EX n, *...,.e ini. M. wac. in en. wo c copy wiinovi eti. cam.ntiencio.or.
- copy wiin ati. chm.nii.ncio ur.
w ; nocopy IOFFICE Rl/DF)
Rl/DRS l
~
NAME DFlorf GMeyer M.
_ ~
i DATE 10/2D/97 1$/[j/97. f 10/ /97 10/ /97 10/ i97 CTclCIAL RECORD COPY
+