i OM 6.4 R2v.1 Millstone Unit 1 r3 V

OPERATIONS MANUAL SECTION 6.4 "Consumables and Service" Sponsor: D.J. Meekhoff 7/

Effective Date TABLE OF CONTENTS PAGE NUMBER

.O 1.0 PURPOSE 2

2.0 DETERMINING AND RECORDING CONSUMABLE STATUS 2

3.0 ORDERING CONSUMABLES OR SERVICE 4

4.0 CONSUMABLE AND SERVICE INFORMATION pproved by:

bEMt MPT Opg(afioris Manager

$gg20gggggggggjj43 O

eaa e

Page 2 cf 6 oM 6.4 Rev.I 1.0 PORPOSE 1.1 Provide direction to maintain A reliable supply of required consumables 2.0 Determining and Recording Consumable Status 2.1 Daily on the day shift, the Outside Rounds Plant Equipment Operator shall submit a completed OM 6.4, Attachment 1, Daily Operations Consumable Status Sheet to the Shift Manager.

2.2 Daily on the day shift, the Shift Manager or designee shall record consumable status via the Shift Narrative Logging Program.

2.3.The Shift Manager or designee will order consumables when required as described in Section 3.0," Ordering Consumables or Service."

2.4. _ Daily on the night shift, the inside Rounds Plant Equipment Operator shall record House Heating Boller running hours and Totalizer readings on OPS Form 696.2.

2.5 -

Daily on the night shift, the Shift Manager or designee shall record House p

Heating Boiler running hours and Totalizer readings via the Shift Narrative tg Logging Program.

I

Page 3 of 4 oM 6.4 Rev.1 l

3,0 Ordering Consumable 4 or Service 3.1 At or before consumable reorder lirnit, place an order for consumable as follows:

3.1.1 Refer to Section 4.0 for appropriate vendor information.

3.1.2 Contact vendor and request delivery of consumable 3.1.3 Frovide information requested by vendor 3.1.4 State delivery date required 3,1.5 Obtain name of vendor representative contacted 3.1.6 Notify VAP at Extension 4633 of pending delivery 3.1.7 If ordering Diesel Generator or Gas Turbine Fuel Oil, notify Unit 1 Chemistry of expected delivery and delivery rate

()

4.0 Consumable and Service Information I

l 4.1 Hvdroaen Reorder limit - Normal Bank - 1000 PSI. Plan to have delivery arrive when normal bank is at approximately 800 psi. Call Liquid Carbonics at (401) 767-3450. The P.O. No is 047235.

4.2 Nitroaen (for the Liauld N2 Storaae Tank)

Rearder limit - 400M cu. ft. Call Bulk Air Products at 800-224-2724 for delivery, the P.O. No is 006901. Customer Service Account # H6193. For Maintenance and Service call (617) 481-6970. Call Security at extension 4720 for specific guard request. (Need delivery time) 4.3 Nitroaen Bottles (back-up Nitrocen to Drvwell)

Reorder limit 4 full bottles. Contact Operations Department Technician or Control Room Clerk to create a MIMS request to order nitrogen bottles. The Stock Code for compressed gas is 0351978. Stock Code for NGL 160 bottles is 0206899. The Stock Code for NGL 180 bottles is 0352043. In case of emergency during off hours call Connecticut AIRGAS directly at 800-750-4427. Refer to P.O.

/

1022008403.

G

_ _ _ _... _. _ _.. _ _ _ _. ~

je;

. Page 4 of 6 oM 6.4 -'

1

- Rey.I:

)

(

4.41 Hypochlorite

h Reorder limit 1000' gallons total.L H. Krevit & Co. @ (203).772-3350, P.O. #

a

02010982. Contact Department Technician or Control Room Clerk to create a MIMS request to order.- The Stock Code # is 0390467. Check with other Units for Ltheir delivery: MP2 @ 4352, MP3 @ 4589. Note: Hypo _ Circ Beys.Thurs. & Sun,

[

Use approx 175 gallons.

~

-4.5.

H. H. Boiler Fuel Oil (No. 4)

Reorder limit - 30,000 gallons total or 15,000 gallons per tank, (total capacity -

50,000 gallons). Call East River Energy P.O. # 02044955.4 Phone (203) 453-h,

- 1200, ask for dispatch. State gallons needed of #4 fuel with a maximum of 0.5% -

sulfur. (Approximately 6000 gallons per load)

- 4.6 i DjemaLQanerater_Eual_Qil

1. - Reorder limit
a. _ 24,100 ' gals. by gage - In ground - Diesel Storage. tank (Capacity.

. 25,400 gals.)..

+

h b.

1/4 tank or less local level indication (1/4 tank = 500 gal)- Above ground - Diesel Reserve Storage tank (Capacity 2,000 gals.)

I

c. 1 Total capacity 27,400 galsf of Diesel Fuel Oil 2.

Cail trucking company, D. J. King, at 1-481-3421 to arrange delivery.- P.O o

number 2020402. Contact Mike Puig @ 850-2431 if problems.

U

4.7. -

Diesel Fire Pump Reorder limit - 150 gals. (total capacity 275 gals.). Before next order of Diesel Fire t

Pump or Met Tower propane check with SM or Department Manager. ' Orders

-t could be tumed into FPQA orders, Call Site Services @ Ext. 5247.

a

. 4.8 -

Gas Turbine Fuel Oil 1 NOTE: Prior to ordering reference memo MP1-OPS-97-105.

1.

Reorder limit _- 44,100 gals. Order sufficient fuel to retum total level to at least

- 46,000 gals. (total capacity 50,000 gals.).

~

. 2.-

Call trucking company, D. J. King, at 1-481-3421 to arrange delivery. Contact Mike Puig @ 850-2431 if problems (Jet A-1 Fuel, ASTM D1655). P.O.

Information (P.O. # 2020423) i -

4.9.'-

Elevator Service

_For elevator problems contact Site Fire Protection.

s t-+7y 7

--V--7

-f- --wn-,,.,,., -rw,,,.. --c- -e-.,-y-w w -+ e Page 5 of 6 oM 6,4 Rey,1 ' 4.10 ~ Boiler Propane Reorder limit 20% Call Hendel's @ 443 5337. Have bill sent to John Flannigan Unit One Operations, P.O. Box 128 Waterford, CT 06385.. . 4.11 ' Met Tower LP Gas - Reorder limit 40% Call Hendel's @ 443-5337. Have bill sent to John Flannigan Unit One Operations, P.O. Box 128 Waterford, CT,06385. 5.0 Receiving Consumables - 5.1 Receiving Gas Turbine Fuel: l 5.1.1 Receive Gas Turbine Fuel Oil in accordance with C-OP 600.5 l 5.2 Receiving Diesel Generator Fuel: 5.2.1 Receive Diesel Generator Fuel Oil in accordance with C-OP 600.5 5.2.2 IF receiving Diesel Generator Fuel into the Diesel Reserve Storage Tank, hang red tags to prevent transfer of Diesel Fuel to the Diesel Storage. (]~ Tank until satisfactory off-site analysis is received. l 5.3 - Forward all receipts for consumables to NRG/ Warehouse. 6.0 Forms 1. Daily Consumables Status y c. - ~. ,~ -~ ~ . - =... Page 6 cf 6 OM 6.4. 4-Rev.1 ATTACHMENT 1 DAILY OPERATIONS CONSUMABLES STATUS - Initial: Date: 1 P.aORDER ITEM IN Service LIMIT - INVENTORY 1 A ~ HYPOCHLORITE B TOTAL EMjB M 1000 GAL. HYDROGEN NORMAL 1000 PSIG RESERVE 1000 PSIG

  1. 1 H.H. FUEL OIL
  1. 2 TOTAL

,;'w g la 30,000 GAL. DIESEL GEN. STORAGE

  • E

'N-24,100 GAL. i /~T RESERVE 500 GAL, ' \\") NORTH GAS TURBINE SOUTH 44,100 GAL. TOTAL a PROPANE 4 ', af, 20 % NITROGEN u f"4 400 MSCF DIESEL FIRE PUMP FUEL OIL - .ygp! s 150 GAL. DRYWELL B.U. NITROGEN-g;;Jg@ 4 FULL 'l b BOTTLES

  • L-This assumes the diesel fuel oil day tank is at a !avel above the fuel oil forwarding pump auto set point of approximately 1543 gallons. Notes:

Notes SHIFT MANAGER: q 3 - N:rtheast

e Utilities Spt
m -

9o Memo January 28,1998 MP1-OPS OM-98 005 TO: Distribution FROM: R. M. Schmidtknecht Manager' Unit One Operations Millstone Extensloa 4280 i

SUBJECT:

Issuance of MP1 Operations Manual Sections Attached for issuance are the following OM Sections:

Title Effective Date OM Index 1/28/98 Sections 1-OM-6.4 "Consumabiss 2d Service" Rev.1 1/28/98

'RMS/scr Distribution: OM Manual P.D. Hinnenkamp R.M. Schmidtknecht E.E. Berry B.C. Merryman SM Manual via Sylke Robertson Unit One CDL via Holly Bumham O