Text
APR-TE
,
In Reply Refer To:
Docket:
50-267/85-32
Public Service Company of Colorado
ATTN:
R. F. Walker, President
P. O. Box 840
Denver, Colorado 80201-0840
Gentlemen:
This refers to the physical inspection conducted by Messrs. R. A. Caldwell and
A. B. Earnest of this office during the period November 18-22, 1985, of
activities authorized by NRC Operating License DPR-34 for Fort St. Vrain
Nuclear Station, and to the discussion of our findings with you and other
members of your staff at the conclusion of the inspection.
Areas examined during the inspection included physical barriers
protected
area, access control, and training and qualifications. Within these areas,
the inspection consisted of selective examination of procedures and
representative records, interviews with personnel, and observations by the
inspectors.
These findings are documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
The apparent violation identified in paragraph 2 of
of the enclosed inspection report was discussed with you at an enforcement
conference held in the Region IV office in Arlington, Texas on January 6, 1986.
Any enforcement action resulting from this inspection will be forwarded to you
under separate cover.
The material enclosed hercuith contains Safeguards Information as defined by
10 CFR Part 73.21, and its disclosure to unauthorized individuals is prohibited
by Section 147 of the Atomic Energy Act of 1954, as amended.
Therefore, the
material, with the exception of the report cover page which is an inspection
summary, will not be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
%ftinet sraned IMt
7
&
$fS0$$ OIO
n
J. E. Gagliardo, Chief
Reactor Projects B o ch
Enclosure:
(see next page)
)
, /h
RElall(',
RIV:EP&S P
EP&SPS
C:EP&SP
C:
PB
C:
JPJ udon
JEGagliardo
DAPowers
RACaldw
ABEarnest
LAYande
g/p/86
3///86
'3/s&/86
6 /M /86
3 g)/86 / t[/[/86
y///86
EmmDsuRE00e.*tA12G
3arneRD3 IKrmouTM.
hO
LIPOW SEPARATI0cf THIS
h
I'AM 13 D2005DXED.
l
4
Public Service Company of Colorado
-2-
Enclosure:
Appendix - NRC Inspection Report
50-267/85-32
'
cc whummary page only:
J. W. Gahm, Manager, Nuclear
Production Division
Fort St. Vrain Nuclear Station
16805 WCR 19
Platteville, Colorado 80651
L. Singleton, Manager, Quality
Assurance Division
(same address)
Colorado Radiation Control Program Director
bec:
Copy of entire report maintained in RIV Security File and sent to:
G. McCorkle, NMSS
SSPB/NRC:NRR
IE File
Resident Inspector (w/766)
R. Martin
4
'
Security Inspector
Chief, EP&SPS
D. Powers, E0
bcc:
RIV - Letter and Inspection Summary only w/766:
RPB
D. Weiss, LFMB (AR-2015)
Section Chief (SP&ES) MIS
RSTS Operator
Chief, RPS/A
'
RIV File
R&SPB
pcc:
RIV - Letter and Inspection Surmary only w/out 766:
/0MB IE 04
R. L. Bangart DRS&S
E. Haycraft DRSP/LA
E. H. Johnson DRS&P
J. Miller
ORB 3
,
600NTA1283
p 13DORMATION.
,
gygg 3EPARATION T1115
i
yagg 13Ir200N1W4D.
'
---
- - - -- .
-
-
- - - - - - -
-
- -
-
- -
- -
-
- -
- -
-
-
- -