Confirms Actions to Be Taken Prior to Restart,Per 860402 Telcon.Total Loads on Emergency Diesel Generators Will Be Reduced to No More than 2,845 Kw Per Diesel Generator & Procedures Will Be Changed
ML20199K787
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 04/02/1986
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Woody C
FLORIDA POWER & LIGHT CO.
References
CAL, NUDOCS 8604100228
Download: ML20199K787 (2)


Text

C 70 ticl[dd APR 2 1986 Florida Power and Light Company s/ ATTN: Mr. C. O. Woody Group Vice President Nuclear Energy Department P. C. Box 14000 Juno Beach, FL 33408 Gentlemen:

SUBJECT:

CONFIRMATION OF ACTION - DOCKET NOS. 50-250 AND 50-251 This letter refers to the telephone conversation on April 2, 1986, between Messrs. V. W. Panciera and R. Brewer of this office and Messrs. J. Dickey and D. Chaney of your staff, concerning the results of your evaluation of emergency diesel generator loading. This evaluation, which was performed at your initia-tive, revealed potential overloading of Turkey Point diesel generators.

Based upon the matters discussed, it is our understanding that you will take or have taken the following actions prior to restart of Units 3 and 4:

1. Total loads on emergency diesel generators will be reduced to no more than 2845 kilowatts per diesel generator and procedures will be changt1, and operators trained on these changes prior to assuming duties, to 6 sure operation within this limitation.
2. A written safety evaluation performed pursuant to 10 CFR 50.59 of the reduced diesel generator loading demonstrates that, with Unit 4 in a cold shutdown condition:

Unit 3 can be operated safely, in accordance with Technical Specifications, and within the bounds of currently approved accident analysis for the full range of accident break spectra.

Unit 4 can be safely maintained in cold shutdown.

This evaluation will be formally submitted to the NRC prior to Unit 3 entering mode 2.

3. A safety evaluation of diesel generator loading for concurrent operation of Units 3 and 4 will be completed and approved by the NRC prior to restart of Unit 4.

f 8604100228 860402 PDR ADOCK 05000250 P PDR N

YW

<v

' c.

)

I APR 2 1986 Florida Power and Light Company 2 If your understanding of our discussion is different from that stated above, please inform this office promptly.

Sincerely, Original Signed by Roger D. Walker /for J. Nelson Grace Regional Administrator CAL 50-250, 251-86-01 cc: . M. Wethy, Vice President

. J. Baker, Plant Manager

.. W. Bladow, Plant QA t/J. Arias, Jr., Regulatory and Compliance Supervisor bcc: Document Control Desk tate of Florida RC Resident Inspector